Search Constraints
« Previous |
251 - 260 of 1,381
|
Next »
Search Results
- Description:
- Sepia-toned photograph depicting construction of the elevator used to launch Eagle Boats at the Ford Rouge Factory Complex. The concrete forms have been removed. Workers work on the elevator towers. Wooden scaffolds surround each Tower. Two cranes are on site. Lower right hand corner of photo has number and date of photo: 22586-7-05-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting a topside view of the Eagle Boat launch elevator at the Ford Rouge Factory Complex. Final preparations are in progress to complete work on the launch elevator. The Eagle Boat factory, known as Building "B" is in the background. The Launch Control Building is shown located next to the transfer bed. Workers are present. Lower right hand corner of photo has number and date of photo: 22613-7-08-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Black and white photographic print mounted on fabric depicting the cooling end of a Jeffery Dewitt Kiln under construction at the Champion Porcelain Co. Dated Apr.-5-1919.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Champion Spark Plug Co.
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59. Workers work on the keel, which now has the framing and some bulkheads are now in place, within building "B" of the Ford River Rouge Factory Complex. The time of photo is 8:30 am. Lower left hand corner show number and date of photo: 26294-04-02-19 with a #59 and 8:30 am written above. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing the interior of Building B of the Ford Motor Company's River Rouge development with an Eagle Boat in stocks with bracing atop rails. The port side of the boat is show, and materials are staged on the floor below. An overhead crane is visible. Two support beams for the factory are marked "X5." Lower right hand corner shows photo number and date of photo: 22342-6-10-18, has a 2 above number. Photo mounted on a linen backing with flap on left side with holes for binding.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of the interior of the flooded outfitting building at the Ford River Rouge Factory Complex. A lone worker is shown observing the flooded conditions near the foreground. Supplies and equipment have been removed from the floor and placed on tables and benches. A large bandsaw is in the background. Lower right hand corner show number and date of photo: 26179-03-17-19. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing the excavation of a canal and elevator for launching Eagle Boats at the Ford Motor Company's River Rouge development . Steam shovels are shown at work. Bracing for elevator and canal is in place. The Rouge River in background. Lower right hand corner shows photo number and date of photo: 22353-6-10-18. Photo mounted on a linen backing. Flap on left side with holes for mounting is binding.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing the bow and port side view of a Ford Eagle Boat hull and keel during construction within Building B of the company's River Rouge development. The boat is in stocks with bracing, on a set of rails. The factory also contains an overhead crane and several men working. Keel has a large number 1 visible on bow. Lower right hand corner shows photo number and date of photo: 22311-6-5-18. Above the number is a small "(1)." Photo mounted on a linen backing with flap on left side with holes for binding.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting Eagle Boat No. 1 stationed at the outfitting dock of the Ford River Rouge Factory Complex. The boat is complete, and U.S. Navy personnel are taking control. The port side life ring is stenciled with, "U.S.S. EAGLE - 1." Lower right hand corner show number and date of photo: 23476-10-30-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59. Workers work on the keel, which now has upper framing and bulkheads are riveted in place, within building "B" of the Ford River Rouge Factory Complex. The time of photo is 9:45 am. The caption, "Bulkheads spaced and rivitted [sic] in place," is on the verso. Lower left hand corner show number and date of photo: 26296-04-02-19 with a #59 and 9:45 am written above. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime