- Description:
- Photograph. Sepia-toned photo showing the construction of a caisson for a railroad bridge that is being built over the Rouge River. Printed text in the top center of the photo shows "Caisson #1" and additional printed text in the lower right corner shows "M.C.R.R. River Rouge Bascule; May 27, 1919." The view looks down on the top of the caisson and shows various pieces of equipment, piping, and scaffolding. Two workmen can be seen in the upper right corner of the photo.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing part of the project site for a railroad bridge that is being constructed over the Rouge River. Printed text in the upper left corner of the photo shows the number, "23." The view shows a large pile of excavated soil along with pipe sections and pieces of construction equipment. One workman is standing near the top of the pile. The water surface of the river can be seen on the left background.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the lower left corner of the photo shows "M.C.R.R. River Rouge Bascule; May 14, 1919." The view looks southwestward along the existing railroad tracks with the old swing bridge being visible in the background. Temporary construction cranes, equipment, and construction debris can be seen on both sides of the railroad tracks. The tops of caissons #3 and #4 can be seen to the right of the tracks. Several workmen can be seen in the distance.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the upper right corner of the photo shows the number, "44," and "M.C.R.R. River Rouge Bascule Bridge; Erecting Lift Span; Mar. 28, 1920; Photo W. B. James, Br. Inspt." The view looks northward and shows the tower posts and truss structures that support the bridge counterweights. The lift span portion of the bridge is beginning to take shape on the left side. The 2-story brick building for the bridge operator can be seen in the right background.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph (and 1 copy). Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "13," and "M.C.R.R. River Rouge Bascule Bridge; Foundations; Caissons #3 & #4 & Sump Pumps; June 4, 1919." The view shows one workman standing on the top of caisson #4 while two others are standing on the adjacent railroad tracks. Two other workmen are standing near the base of the caisson. The top of caisson #3 and its vertical reinforcing bars can be seen in the right foreground area. Pumps and pipes for dewatering the excavation are visible in the center foreground area of the photo.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows "M.C.R.R. River Rouge Bascule Bridge; Foundations; Caisson #4; June 1, 1919. James Photo." The view looks northeastward along the existing railroad tracks with several workmen standing on the top of caisson #4 in the center foreground. One workman is standing behind the caisson and another is standing on the railroad tracks to the right. A temporary concrete mixing plant can be seen in the center background area along with construction materials and construction debris.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the temporary concrete mixing plant for the construction of a railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "16," and "M.C.R.R. River Rouge Bascule Bridge; Foundations; Mixing Plant, Material Hopper, and Chute; June 15, 1919. [W. B.] James Photo." The view shows two workmen who are standing on a wooden platform that is part of the mixing plant.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the lower right corner of the photo shows the number, "39," and "M.C.R.R. River Rouge Bascule Bridge; Building Counterweight Forms; Feb. 28, 1920; W. B. James Photo." The view looks northward and shows several workmen who are constructing wooden forms on the trusses in order to contain the poured concrete that will create the counterweights. Two construction cranes can be seen in the background. The 2-story brick building for the bridge operator is visible at the far right side. The ground is lightly covered with snow.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society