Search Constraints
« Previous |
361 - 370 of 606
|
Next »
Search Results
- Description:
- Black and white photographic print depicting seven workmen operating machinery to dig the Michigan Central Railway Tunnel. Mounted on board.
- Date Issued:
- 1907-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph depicting a topside view of the Eagle Boat launch elevator at the Ford Rouge Factory Complex. Final preparations are in progress to complete work on the launch elevator. The Eagle Boat factory, known as Building "B" is in the background. The Launch Control Building is shown located next to the transfer bed. Workers are present. Lower right hand corner of photo has number and date of photo: 22613-7-08-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Black and white photographic print mounted on fabric depicting the inside of a Jeffery Dewitt Kiln under construction at the Champion Porcelain Co., looking toward the head end. Dated July 7th 1919.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Black and white photographic print mounted on fabric depicting a Jeffery Dewitt Kiln under construction at the Champion Porcelain Co. Dated 4-25-1919.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph showing the group under preparation for the installation of a rail transfer system to launch ships from Ford Motor Company's River Rouge development. The assembly building is on the right. Hand carts are in the foreground. Several workers are present. Steam shovels are at work. A train with railcars is in the background. Lower right hand corner shows photo number and date of photo: 22364-6-10-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph taken of overlooking the partial demolition of a strip through the center of a building at the Ford River Rouge Factory Complex, to create a path for railroad tracks. Workers are perched atop temporary wooden trusses which been set up bridging the gap in the center of the building. Wood is piled in the foreground on the left, and many other construction materials are piled on the opposite side of the building in the background. Also visible in the background are workers digging a trench for the tracks which will extend from the existing tracks. "26785-5-29-19," is printed in the lower right corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Mounted sepia-toned photographic print of the construction site for the Belle Isle Casino, as taken from the northwest. Much of the building's ground floor is in place. Workers use wooden scaffolding equipped with a pulley system to work on the building's second floor. Two small steam engines are visible among the construction debris near the east side of the building. The verso is stamped with "Received Aug 30 1906, Answered."
- Date Issued:
- 1906-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Black and white photographic print mounted on fabric depicting the cooling end of a Jeffery Dewitt Kiln under construction at the Champion Porcelain Co. Dated Apr.-5-1919.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph showing the construction of the Ford River Rouge development Building "B" and grounds. A steam driven pile driver sets the foundation in the foreground. Men are present. Cranes set the steel framing for Building "B" in the background. Verso: "Pilings are driven for elevator foundation work." Lower right hand corner shows photo number and date of photo: 22037-5-08-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Black and white photographic print mounted on fabric depicting the preheating end of a Jeffery Dewitt Kiln under construction at the Champion Porcelain Co. Dated 6-7-1919.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society