- A staple-bound contract form between the Ford Motor Company, and the U.S. Navy establishing the terms for the construction of 100 patrol boats, the Eagle Boats, dated March 4, 1917. The spaces on the first page where the date and the name of the representative of Ford would be entered, and on the seventh page where the parties would sign have been left blank. An illegiable handwritten note has been made in the margin at the bottom of the sixth page.
- Date Issued:
- 1916-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Ledger sheet tracking how complete, expressed in a percentage, each of the sixty Eagle Boats are, along with listings of labor, salary, and material costs for each boat.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing the interior of Building B of the Ford Motor Company's River Rouge development with an Eagle Boat, starboard quarter toward the camera, in stocks with bracing atop rails. A man works on the keel and hull. Keel has a large number 2 on it. Lower right hand corner shows photo number and date of photo: 22316-6-3-18. Photo mounted on a linen backing with flap on left side with holes for binding.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken of an unused aisle within building "B" of the Ford River Rouge Factory Complex. Tracks run along the center of the aisle. Metal plates are leaned inside of bins along the sides of the aisle. A man stands at the window of a tool crib further along the aisle. In the background on the right, two Eagle Boats are under construction in the adjacent aisle. Scaffolding surrounds the hull of the nearest one. "26781-5-27-19," is printed in the lower right corner of the recto, and "assembling components at site of construction," is handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the construction of a long low wooden building at the Ford Rouge Factory Complex. The building appears nearly complete. Workers are shown laying material for railroad bed beside it. The clean-up of the surrounding area is in progress. The left side of building has moveable doors that run the entire length of the building. The roof has wind-directional air vents. Lower right hand corner shows photo number and date of photo: 22568-7-02-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the hull plates being attached to the port side of Eagle Boat No. 1 at the Ford River Rouge Complex as viewed from near its bow facing aft. The boat's framing is in place. Additional Plates are laying on floor. Several workers are visible. Lower right hand corner shows photo number and date of photo: 22245-5-29-18 with a number 1 above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of a close-up of an Eagle Boat propeller shaft and housing underneath an Eagle Boat being manufactured within the Ford Rouge Factory Complex. The bracing used to support the boat during construction is also visible. Lower right hand corner of photo has number and date of photo: 22654-7-08-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the construction of the transfer bed outside of Building "B" at the Ford River Rouge Complex. Material is stockpiled in the foreground. A train is visible in the background. The photo is captioned "Buildings nearing completion, with work underway on transfer bed (foreground)" on the verso. Lower right hand corner shows photo number and date of photo: 22223-5-27-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing the exterior of Building B of the Ford Motor Company's River Rouge development under construction. A water tower visable on the left. Two cranes and railroad cars are in the background. Foreground shows foundation layout and mounting blocks for rail system used transport ships to launch area. Lower right hand corner shows photo number and date of photo: 22077-5-11-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing the interior of a metal fabricating shop within a factory building at the Ford Motor Company's River Rouge development. Workers are visible at the machines. Foreground shows four men working with large sheet of metal. Lower right hand corner shows photo number and date of photo: 22026-5-8-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting Eagle Boat No. 1, the first Eagle Boat launched, stationed on the launch elevator at the Ford Rouge Factory Complex, as taken from off its port bow. Men stand upon the deck of the boat and atop the elevator towers. Spectators and workers are present. A Superior Dredging Company barge is in the background on the right. Lower right hand corner of photo has number and date of photo: 22630-7-11-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59, within building "B" of the Ford River Rouge Factory Complex, of workers installing the boat's deck fixtures as viewed from off its port bow. Workers atop the boat install the deck fixtures. Scaffolding surrounds the boat's hull. "Vote for wine and beer," has been written on part of the scaffolding beneath the boat's bow. Cables and hoses enter the boat's portholes, suggestive of the work going on inside. "#59, 26377-04-09-19," is printed in the lower right corner of the recto and "8A13, superstructure a-building" is handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting an Eagle Boat's stern emerging from Building "B" in the background and being moved to the transfer table, in the foreground, at the Ford River Rouge Factory Complex. Workers and spectators are observing the process. Lower right hand corner of photo has number and date of photo: 22853-8-19-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing workers fabricating beam to be installed inside of the Ford River Rouge Complex Building "B," during its construction. Plate connectors are stored on floor in the foreground. Lower right hand corner shows photo number and date of photo: 22104-5-16-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting a view of the port side of an Eagle Boat docked at the Ford River Rouge Factory Complex. . Workers are outfitting the boat. A lifeboat is visible in the water between the bow and railway. The caption, "Outfitting the ship," is on the verso. Lower right hand corner of photo has number and date of photo: 22825-8-16-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the manufacture of Eagle Boat No. 2, in stocks and trucks, within the Ford Rouge Factory Complex. Scaffolding has been attached to the entire length of the port side. Material is staged for assembly in the foreground. Workers are also visible. Lower right hand corner of photo has number and date of photo: 22575-1-03-18 written above the date is the number (2).. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the manufacture of the nearly completed "pattern" Eagle Boat at the Ford Highland Park Factory, viewed from above, looking bow to stern. Its mast and chart house are installed and its lifeboat rests on the floor off of its starboard side. This boat served as the pattern for other Eagle Boats manufactured at the Ford Rouge Complex. This boat, after completion, was then disassembled and each was part given a code number and then used as a template for the other Eagle Boats. Lower right hand corner shows photo number and date of photo: 22483-6-19-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken of an Eagle Boat moored at the Ford River Rouge Factory Complex's outfitting dock, from the shore off of its port bow. The boat appears complete. Smoke rises from its stack. Lower right hand corner show number and date of photo: 23480-10-30-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting construction at the Ford River Rouge Complex. Workers frame a lean-to wing to the side of a factory. Roof trusses are placed with a pulley system. Ladders, wheelbarrows, and a wagon carrying lumber are all in the scene. Lower right hand corner shows photo number and date of photo: 22250-5-29-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting a model of an Eagle Boat used as a display float, viewed from the starboard quarter. The boat is surrounded by a canvas-like material simulating waves. Lower right hand corner shows photo number and date of photo: 22176-5-21-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of the exterior of the employment office for the Ford Motor Company Ship Yards on Miller Road. Men are lined up along the side of the building on the right. On the left, a man signs a sheet on a writing surface attached to the side of a fence, as another man waits. A sign posted beside the building reads, "Ford Motor Company Ship Yards, Entrance No. 10. "27125-7-3-19," is printed in the lower right corner of the recto, and "Employment Office, Miller Road, Ship Yard Plant," is handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken of the interior of the room housing the hydraulic elevator machinery at the River Rouge Factory Complex. A series of pipes and valves are in the foreground on the left. A large room heating furnace and an electrical generator are on the right. "26396-04-11-19," is printed in the lower right corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing an Eagle Boat being outfitted within Building B of the Ford Motor Company's River Rouge development, as taken from above the boat's bow. Elevated bins line the corridor. The ship's wheelhouse is shown. Lower right hand corner shows photo number and date of photo: 22377-6-12-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting display float of an Eagle Boat, shown from off of the model's starboard bow profile. Houses can be seen in background. Lower right hand corner shows photo number and date of photo: 22177-5-21-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of progress made plating the bow of the hull of Eagle Boat No. 39 within building "B" of the Ford River Rouge Factory Complex, as taken from above its port bow. Several plates have been applied at the bow. Blurred workers are busy on the floor beside the boat, as well as beneath its bow. Men work at desks on both the right and left sides of the aisle. Pieces of framing are piled along the wall on the left. "25635-2-3-19, #39" is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- A staple-bound contract form between the Ford Motor Company, represented by the company's vice president F.J. Klingensmith, and the U.S. Navy establishing the terms for the construction of 100 patrol boats, the Eagle Boats, dated March 4, 1917. To Ms. Kimdsen -A.L.," is handwritten and "copy" is typewritten at the top, the blanks for the names and dates on the first page have been filled out, and on the seventh page, names have been typewritten where each party would have signed, including Edsel B. Ford, Klingensmith, and Graham Egerton as representative of Acting Secretary of the Navy, F.D. Roosevelt.
- Date Issued:
- 1916-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Staple-bound report, dated November 20, 1916, from the Navy Department, Bureau of Construction and Repair, containing two articles, "Air Test of Compartments," and "Extracts from Report of Air Tests of Compartments and Zones of Water-Ejecting System on the U.S.S. OKLAHOMA," both written J.G. Tawresey of the U.S. Navy. A stamp on the cover indicates that the report was receives by the Ford Motor Company's Office of the Superintending Constructor for the U.S. Navy on February 27, 1919, in preparation for the construction of the Ford Eagle Boats later that year. "Noted R.K.," is handwritten in pencil on the upper left corner of the first page.
- Date Issued:
- 1916-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing an Eagle Boat being outfitted within Building B of the Ford Motor Company's River Rouge development, as taken from above the boat's stern. Elevated bins line the corridor. The ship's wheel has been installed mid-ship. Lower right hand corner shows photo number and date of photo: 22376-6-12-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of showing progress made on the construction of the hull of Eagle Boat No. 41 within building "B" of the Ford River Rouge Factory Complex, as taken from above its port quarter. The transom, propeller shaft tunnel, and several stringers and bulkheads are in place. "25736-2-10-19, #41" is printed in the lower left corner of the recto, and "Framing complete at stern," is handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers attaching plates to the keel of an Eagle Boat within the Ford River Rouge Complex. A coat rack and an attached shelf holding lunch pails are visible. The caption, "Plating at Keel as seen from stern," is on the verso. Lower right hand corner shows photo number and date of photo: 22268-5-31-18 with a number 5 written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting close-up view of workers riveting a keel during the manufacture of an Eagle Boat inside of the Ford River Rouge development. A tool belt with tools is in the foreground. Another Eagle Boat under construction is in the background. Verso: "Detail of assembly." Lower right hand corner shows photo number and date of photo: 22170-5-21-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing the Ford River Rouge Complex Building "B," under construction. Men are picturing installing glazing on the sides of the building near the building's front. Workers are present. Verso: Building front with glazing in progress (16 May 1918)". Lower right hand corner shows photo number and date of photo: 22101-5-16-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing men manufacturing a keel for an Eagle Boat on wooden platform mounted on rails inside of the Ford River Rouge development. Small carts are in the background loaded with material. Lower right hand corner shows photo number and date of photo: 22076-5-11-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of progress made in the construction of Eagle Boat No. 44 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. Workers are perched atop the struts across the frame pieces near the bow and boards spanning the tops of the frames near the boat's midsection. An overhead crane lowers one of the bulkheads into place near the stern. Another Eagle Boat is under construction in the background. Shelves and crates of materials are in the adjacent aisle on the left, and coat racks, shelves, and piles of materials are along the wall on the right. "#44 11:32 A.M. 25865-2-20-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting plates being attached to the keel of Eagle Boat No. 3, viewed from above looking bow to stern, at the Ford River Rouge Complex. Additional material is laying on floor. Workers are present. Lower right hand corner shows photo number and date of photo: 22247-5-29-18 with a number 3 above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59, within building "B" of the Ford River Rouge Factory Complex, as viewed from above the boat's port bow. Workers perched atop the hull are riveting and plating the deck. Scaffolding surrounds the sides of the hull. Lower left hand corner show number and date of photo: 26368-04-05-19 with a #59 written above. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the manufacture of the "pattern" Eagle Boat, viewed from an elevetated position looking stern to bow, at the Ford Highland Park Factory. This boat served as the pattern for all other Eagle Boats to be manufactured at the Ford Rouge Complex. This boat, after completion, was then disassembled and each was part given a code number and then used as a template for the other Eagle Boats. Lower right hand corner shows photo number and date of photo: 22482-6-19-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing the exterior of a factory under construction at the Ford River Rouge development. Cranes mounted on rail cars are setting trusses and other steel structures in place to build the assembly building. Workers are present. Lower right hand corner shows photo number and date of photo: 22029-5-8-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers installing plating to a keel during the manufacture of an Eagle Boat inside of the Ford River Rouge development. The foreground worker holds a rivet gun. Lower right hand corner shows photo number and date of photo: 2168-5-21-18 with a number 1 written above.. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting a worker an elevated wooden platform attaching plates to the stern of an Eagle Boat at the Ford Rouge Factory Complex. Two elevated work stations are on the port side of boat. The caption, "Plating at stern," is on the verso. Lower right hand corner shows photo number and date of photo: 22473-6-18-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of progress made installing the bulkheads and framing on the keel of an Eagle Boat in one of the outer aisles of building "B" of the Ford River Rouge Factory Complex, as taken from above its port quarter. What appears to be a bench top riveter is on a stand atop the boat's propeller shaft tunnel. A group of workers are gathered beneath a ladder on the boat's port side. "25836-2-18-19" is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of a completed Eagle Boat being lowered into the Rouge River by the launch elevator at the Ford River Rouge Factory Complex, as viewed from the water off of its port quarter. Its hull has almost broken the surface of the water. The boat has been dressed with its signal flags, and draped with banners. The towers of the launch elevator have also been draped with banners. Uniformed naval personnel stand on the boat's deck, and spectators watch from a walk way beside the elevator, as well as a small motor boat. "27537-8-15-19," is printed in the lower right corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the manufacture of Eagle Boat No. 4 within the Ford Rouge Factory Complex, as viewed from off its port quarter. Scaffolding is suspended from its side. Workers in the background, toward its bow, stand on another scaffold. Another Eagle Boat is being constructed in the background on the right. The caption, "Last plates at Stern," is printed on the verso. Lower right hand corner shows photo number and date of photo: 22530-6-26-18 number (4) written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers laying the keel for an Eagle Boat within Ford River Rouge Complex Building "B." A box car is in background inside of the factory. Lower right hand corner shows photo number and date of photo: 22065-5-13-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting an elevated view of men working on the bottom plates of an Eagle Boat within Ford River Rouge Complex Building "B". Mobile work platforms are set up along the track. Lower right hand corner shows photo number and date of photo: 22110-5-16-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Black and white photograph of a close-up of the Eagle Boat launch pit under construction at the Ford Rouge Factory Complex. Workers rivet cross pieces in place as other workers attend to the tower. Lower right hand corner of photo has number and date of photo: 22606-7-08-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Black and white photograph captioned, "Eagle Boiler for Patrol Boat ready for installation," taken of an Eagle Boat boiler staged outside at the Ford River Rouge Factory Complex atop a stand made of wooden ties. "26379-04-10-19," is printed in the lower left corner of the recto and "0-26379" is handwritten on the verso.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the port side quarter profile of an Eagle Boat being outfitted at the dock of the Ford River Rouge Factory Complex. The charthouse and mast are in place. The lifeboat davits are finished. Lifeboats are staged across the river from the boat. Workers finish riveting the top foredeck. A mobile rail-mounted crane is visible to the aft of the boat. Lower right hand corner of photo has number and date of photo: 22758-7-19-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing the a stern view of a Ford Eagle Boat hull under construction within Building B of the company's River Rouge development. In the background, a more complete boat is visible. Both boats are in stocks with bracing. Lower right hand corner shows photo number and date of photo: 22310-6-5-18. "(1),'s is written above that number. Photo mounted on a linen backing with flap on left side with holes for binding.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of the nearly complete frame for Eagle Boat No. 38 within building "B" of the Ford River Rouge Factory Complex, as taken from above its port bow. Another Eagle Boat is under construction in the background. Crates and shelves of materials are visible in the adjacent aisles. "25609-2-1-19, #38" is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting Eagle Boat No. 1 backing out of its construction bay at Building "B" of the Ford Rouge Factory Complex to the Transfer Bed, as taken off of its starboard quarter. A transfer-tug is moving the boat. A little more than half the boat is clear of the building. A U.S flag is being flown from its stern. "Eagle-1" painted on the stern. Spectators and U.S. Navy personnel are shown. The caption, "Exit Eagle #1," is on the verso. Lower right hand corner of photo has number and date of photo: 22619-7-11-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of a completed Eagle Boat being rolled along tracks onto the launch elevator at the Ford River Rouge Factory Complex, as viewed from below off of its port quarter. The boat has been dressed with its signal flags, and draped with banners. The towers of the launch elevator have also been draped with banners. Uniformed naval personnel stand on the boat's deck, and spectators watch from a walk way beside the elevator. "27529-8-15-19," is printed in the lower right corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the first Eagle Boat launched, Eagle Boat No. 1, post launch at the Ford Rouge Factory Complex, as taken off of its starboard side. The boat is now backing away from the elevator launch, and its next stop will be the outfitting dock. Men are standing upon deck of the boat. Lower right hand corner of photo has number and date of photo: 22629-7-11-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59. Workers work on the keel, which now has the upper framing and more bulkheads are now in place, within building "B" of the Ford River Rouge Factory Complex. The time of photo is 9:30 am. Lower left hand corner show number and date of photo: 26295-04-02-19 with a #59 and 9:30 am written above. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the steel framework of view of Ford River Rouge Complex Building "B" during its construction. The foreground shows the foundation and rails for the transfer bed. Workers are present. Lower right hand corner shows photo number and date of photo: 22064-5-13-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of an Eagle Boat steam turbine engine at the Ford Highland Park Factory, as viewed facing one of its corners. Its controls are visible on the right. A sign mounted on top of the engine reads, "2,500 Horse Power, Steam Turbine Engine, Used in Eagle Boats, Ford Motor Company." Other engines are in the background. Seventy-five engines were built with enough parts for 15 more. The caption, "Complete turbine power-plant assembly," is on the verso. Lower right hand corner show number and date of photo: 23873-12-02-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the construction of the elevator for launching Eagle Boats at the Ford Rouge Factory Complex. A crane moves a large wooden log while another crane sets metal beams. A steam shovel is excavating in the background. Workers and stored materials are also in view. The caption "Pit complete, elevator under construction," is on the verso. Lower right hand corner shows photo number and date of photo: 22525-6-26-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken of Eagle Boat No.1, moored at the outfitting dock of the Ford River Rouge Factory Complex, as taken from land off of its port bow. The boat appears nearly complete. Painters are finishing their work. Workers pump fuel aboard from a tank car on rails beside the shore. On the Verso: "Eagle #1 complete." Lower right hand corner show number and date of photo: 23482-10-30-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59, within building "B" of the Ford River Rouge Factory Complex, as viewed from off the boat's port bow. Workers atop the hull are completing the deck plating. Lower left hand corner show number and date of photo: 26371-04-07-19 with a #59 written above. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the construction of the elevator used to launch Eagle Boats at the Ford Rouge Factory Complex. Workers work on concrete forms and execavate by hand. A crane mounted on a rail car is on the right. Lower right hand corner of photo has number and date of photo: 22582-7-03-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting a turbine blade assembly used in the engine of the Eagle Boats, positioned upon a stand with a cloth backdrop. Lower right hand corner of photo has number and date of photo: 22839-8-19-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting approximately 33 Eagle Boat lifeboats stored in a fenced field at the Ford Rouge Factory Complex. Several lifeboats are being fitted with canvas tops by four workers. A road is visible beyond the fence. Portion of open-cab Model T-type vehicle is in the foreground. The caption "Stockpile of lifeboats," is on the verso. Lower right hand corner of photo has number and date of photo: 22587-7-05-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting Eagle Boat No. 1 tied to the outfitting dock at the Ford River Rouge Factory Complex, as taken from the over the shore off its port quarter. The boat appears to be nearly complete. A large canvas awning covers the rear deck. Workers paint the hull near the port bow. "Eagle Boat - 1" is painted on the transom. The rail track running parallel to the river used by a rail-mounted crane to lift the turbine engine and other heavy material aboard is in view. U.S.Navy are posted outside of several buildings across the river. Lower right hand corner of photo has number and date of photo: 22968-9-06-18 with a No. 1 above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Black and white photograph of a photograph of Charles Sorenson (far left), Charles Kirby (second from the right, holding a hat), and Henry Ford (on the far right) posed with a group of workers above the keel of the "pattern" Eagle Boat in the room where it is being built within the Ford Highland Park Plant. "Olson #412," and "0-421" are both printed on the verso.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing the interior of Building B of the Ford Motor Company's River Rouge development containing an Eagle Boat in stocks with bracing upon rails. The boat is viewed from its bow. Its keel is installed. An overhead crane is visible in the background. The support beams for the factory's roof are numbered 5 through 19. The first beam is "X4." Material is staged on the floor. No workers are present. Lower right hand corner shows photo number and date of photo: 22349-6-10-18 the number 5 appears above the date. Photo mounted on a linen backing with flap on left side with holes for binding.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting Eagle Boat No. 1 being lowered on the launch elevator at the Ford Rouge Factory Complex, as viewed from off its port side. Men are standing on the deck of the boat. Workers are atop the elevator towers. Spectators and workers look on. U.S. Navy personnel observing the launch from the background on the left.. The Elevator Control Building is now visible over the bow of the boat. Lower right hand corner of photo has number and date of photo: 22627-7-11-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing the interior of Building B of the Ford Motor Company's River Rouge development containing Eagle Boats in stocks with bracing upon rails. Shows ship in background [ Has number 3 written next to it]. A keel is being assembled in the foreground, and a more complete ship is being worked on in the background. The number 3 has been handwritten beside the keel in the foreground, and 7 has been handwritten beside the hull in the background. Many workers are present. Lower right hand corner shows photo number and date of photo: 22351-6-10-18 the number 7 appears above the date. Photo mounted on a linen backing with flap on left side with holes for binding.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken of overlooking the partial demolition of a strip through the center of a building at the Ford River Rouge Factory Complex, to create a path for railroad tracks. Workers are perched atop temporary wooden trusses which been set up bridging the gap in the center of the building. Wood is piled in the foreground on the left, and many other construction materials are piled on the opposite side of the building in the background. Also visible in the background are workers digging a trench for the tracks which will extend from the existing tracks. "26785-5-29-19," is printed in the lower right corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting cranes setting the steel structure for Building "B" of the Ford River Rouge Complex. Rail tracks run from the foreground. A roof truss is waiting beside the structure to be set in place. Workers are visible throughout the scene. Lower right hand corner shows photo number and date of photo: 21986-5-04-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting Eagle Boat No. 2 stationed at the outfitting dock of the Ford River Rouge Factory Complex. The boat has its deck guns and cannon installed, and its anchor in place, and appears nearly done. Workers are visible. A floating platform is off of the boat's starboard side. A man in a small winch-powered ferry is visible near the boat's bow. Lower right hand corner show number and date of photo: 23307-10-11-18 with "No. 2" above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting cranes being used in the construction of Building "B"view at the Ford River Rouge Complex. Rail tracks run through the structures. Beams and trusses are staged for use. Workers are visible. Verso: "Steelwork in progress (4 May 1918)." Lower right hand corner shows photo number and date of photo: 21987-5-04-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers installing plates for the hull of Eagle Boat No. 6 within the Ford Rouge Factory Complex. Another Eagle Boat is being constructed in the background. Lower right hand corner shows photo number and date of photo: 22435-6-13-18 with a number (6) above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting an elevated overview of the transfer bed at the Ford Rouge Factory Complex where workers are making final adjustments. A crane is mounted on a railcar in the foreground. Building "B" in background, and to the right the power house is producing smoke from it's stack. Lower right hand corner shows photo number and date of photo: 22526-6-26-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of the interior of the flooded outfitting building at the Ford River Rouge Factory Complex. Pipefitting benches, a small boiler used for heat, and tools are in view. Lower right hand corner show number and date of photo: 26177-03-17-19. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers, including two on suspended scaffolding working on the hull of Eagle Boat No. 1, as viewed off of its starboard quarter with the Ford Rouge Factory Complex. Verso: "Plating complete". Lower right hand corner shows photo number and date of photo: 22470-6-18-18 has 1 written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting Eagle Boat No. 1, the first Eagle Boat launched, stationed on the launch elevator at the Ford Rouge Factory Complex, as taken off of its port quarter. Men stand upon the deck of the boat and atop the elevator towers. Spectators and workers are present. The caption, "Eagle is wheeled unto elevator," is printed on the verso. Lower right hand corner of photo has number and date of photo: 22632-7-11-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the framing being added to the plated keel of an Eagle Boat No. 4, viewed from above its bow facing its stern, at the Ford River Rouge Complex. Additional material staged on floor. An overhead crane is visible in the background. Workers are present. Lower right hand corner shows photo number and date of photo: 22248-5-29-18 with a number 4 above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting men working on rail tracks along the Rouge River, beside a long low wooden structure, also under construction. Hulett cranes are adjacent to building. The elevators used to launch Eagle Boats are in the background. Lower right hand corner shows photo number and date of photo: 22267-5-31-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Black and white photograph depicting workers and a crane working on the construction of the elevator used to launch the Eagle Boats during the construction of the Ford Rouge Factory Complex. An elevated concrete shoot used to transfer material to the foundations is visible on the left. Workers in the background excavate by hand. The caption, "Elevator being framed, hydraulic lifts under construction in center," is on the verso. Lower right hand corner shows photo number and date of photo: 22554-6-28-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of progress made plating the hull of Eagle Boat No. 41 within building "B" of the Ford River Rouge Factory Complex, as taken from above its port bow. Several plates have been applied at the bow, as well as in a strip along its side. Another Eagle Boat is under construction in the background. A row of workers are lined up at the tool crib in the adjacent aisle. "25725-2-10-19, #41" is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers setting wooden forms in place as part of the construction at the Ford River Rouge Complex. The work appears as prep-work for the Eagle Boat transfer bed. One worker uses a surveyor's transit. A steam shovel can be seen working in background. Lower right hand corner shows photo number and date of photo: 22224-5-27-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Black and white photograph taken overlooking work to convert building "B" of the Ford River Rouge Factory Complex from manufacture of Eagle Boats to that of automobiles. The strip at the center of the photo, in one of the inner aisles of the building, has been mostly filled with dirt, and regularly spaced wooden forms holding concrete slabs with lengths of rebar sticking out. Piles of wood and dirt run along the length of the strip. Workers have climb ladders up to the trusses that run between the building's columns. A worker is at the controls of the overhead crane in the adjacent aisle on the right. "26787-5-27-19," is printed in the lower right corner of the recto, and "Laying assembly-line track in 'B' bldg (27 May 1918)," is handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of workers beginning to attach plates to the side of Eagle Boat No. 45 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. A single piece of plate near the bow, and a wooden brace running the length of the boat have been installed. Workers are on ladders and boards spanning the tops of the framing pieces. A large piece of plating leans against a column on the right. Shelves and crates of materials, and a tool crib are visible in the adjacent aisle to the right."#45 1:46 P.M. 25860-2-20-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers installing additional plating to a keel during the manufacture of an Eagle Boat inside of the Ford River Rouge development. Verso: "Further plating is added." Lower right hand corner shows photo number and date of photo: 2169-5-21-18 with a number 2 written above.. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting rows of Eagle Boat turbine engines and components staged on the floor of the Ford Highland Park Factory, as taken from above. Milling machines line both walls of the long narrow room. These engines were manufactured for Ford's Eagle Boats being produced at Ford's River Rouge Complex. The engines produced 2,500 hp. Seventy-five engines were completed with parts enough for 15 more. Lower right hand corner show number and date of photo: 23420-10-21-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing men working on the assembly of an Eagle Boat keel within Ford River Rouge Complex Building "B." Verso: "Assembly turned over to complete rivetting[sic] on bottom."Lower right hand corner shows photo number and date of photo: 22109-5-16-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting Eagle Boats No. 2, 3, 4, and 5 stationed at the outfitting dock of the Ford River Rouge Factory Complex. Behind boat No. 5, part of a railway crane is visible. Further in the background, a large conveyor spans the frame. Workers are in view, including two on a floating platform on the starboard side of boat No. 3 and 4. Lower right hand corner of photo has number and date of photo: 23161-9-27-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of workers positioning the bow plating of Eagle Boat No. 45 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. The piece is suspended front the overhead crane, as workers standing on the boat's carriage hold it in position. Another Eagle Boat is under construction in the background. Shelves and crates of materials are visible in the adjacent aisle to the right."#45 2:46 P.M. 25861-2-20-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting a view along the transfer bed rails of the Ford River Rouge Factory Complex with the bow of a completed Eagle Boat hull positioned on the launch elevator in the distance. A newsreel cameraman is directly in front of the boat ready to film the launch. Workers and spectators are observing the process. Lower right hand corner of photo has number and date of photo: 22859-8-19-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the interior of the Ford Rouge Complex where dollies are being staged for the construction of an Eagle Boat keel in the foreground as workers begin plating the hull of another Eagle Boat in the background. An overhead crane is also visible in the background. Verso: "While another Eagle boat progresses (background) dolly 05 carriage is prepared for keel laying on assembly line tracks." Lower right hand corner shows photo number and date of photo: 22288-6-03-18 with a number 6 written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken overlooking workers riveting pieces of plating for the hull of an Eagle Boat within building "B" of the Ford River Rouge Factory Complex. The metal sheets are propped up on sawhorses. A frame of an Eagle Boat awaits the plating in the background at the upper right. Another group of workers is also working on prefabricating plating in one of the neighboring aisles in the background on the left. "25610-2-1-19" is printed in the lower right corner of the recto, and "5A4, Prefabrication on large components," is handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting Eagle Boat No. 1 backing out of its construction bay at Building "B" at the Ford Rouge Factory Complex, as taken off of its starboard quarter. A U.S Flag is being flown from its stern. "Eagle-1" is painted on the stern. Tow cable is laying on the ground. Spectators and U.S. Navy personnel are shown. The caption, "First hull complete, ready to go," is on the verso. Lower right hand corner of photo has number and date of photo: 22617-7-11-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting several machines, mounted on rails, used to install the propeller drive shaft, beneath an Eagle Boat within the Ford Rouge Factory Complex, as taken below its port quarter. Lower right hand corner of photo has number and date of photo: 22583-7-03-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers installing plates, frames, and bulkheads onto the keel of Eagle Boat No. 5 within the Ford Rouge Factory Complex. The caption "First frames are set in place" is printed on the verso. Lower right hand corner shows photo number and date of photo: 22434-6-13-18 with a number (5) above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers attaching plates to the keel of Eagle Boat No. 3 at the Ford River Rouge Complex. The photo is captioned "Hull grows" on the verso. Lower right hand corner shows photo number and date of photo: 22221-5-27-18. Has a number 3 written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting a portside view of the completed hull of Eagle Boat No. 1 at the Ford Rouge Factory Complex. Workers are on scaffolding along the side of the boat. Wooden stairs connect the scaffolding to rail flatcar decking. The caption, "Competed hull," is on the verso. Lower right hand corner shows photo number and date of photo: 22493-6-22-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of workers beginning to plate the hull of Eagle Boat No. 44 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. Several plates have been installed near the boat's bow through the combined efforts of a group of workers on the boat's carriage and the overhead crane. Meanwhile another group of workers begins the construction of a keel for another Eagle Boat on the left. Yet another Eagle Boat is under construction in the background. Coat racks, shelves, and piles of materials are along the wall on the right. "#44 12:42 A.M. 25866-2-20-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken overlooking stacks of barrels of rivets within building "B" of the Ford River Rouge Factory Complex, as taken from on deck of an Eagle Boat under construction in the building. Four other Eagle Boats are also under construction in adjacent aisles in the background. "27141-7-8-19," is printed in the lower right corner of the recto, and "Rivets," and "13," are handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers installing frames and plates onto the hull for Eagle Boat No. 3, viewed from overhead off of its starboard bow, within the Ford River Rouge Complex. An overhead crane is visible in the background. Additional plates and material are laying on floor. Eagle Boat No. 2 is visible in the background in another bay. Lower right hand corner shows photo number and date of photo: 22285-6-03-18 with a number 3 written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting a crane and steam shovel involved in excavating and foundation work for the Ford River Rouge Complex. Teams of horses and Hulett Cranes are visible in the background. Workers appear to be on a lunch break. Lower right hand corner shows photo number and date of photo: 22291-6-03-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime