Search Constraints
« Previous |
861 - 870 of 939
|
Next »
Search Results
- Description:
- Sepia-toned photograph depicting the interior of a long low wooden building at the Ford Rouge Factory Complex. Rails run along concrete piers along the center of the building. A wooden job-site work box is shown in the foreground. The left side of the building has moveable doors that run entire length of the building. Workers assemble panels in the background. Metal panels are staged on the floor. Lower right hand corner shows photo number and date of photo: 22567-7-02-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Black and white photographic print depicting the inside of the Dressler Kiln at the Champion Spark Plug Co. Caption on verso reads: Taken by the Carborundum Company 9-20-1921 - Showing interior of Dressler Kiln (The kiln had been in service for seven months - 2-4-1921 to 9-7-1921). Note particularly the three B mix carborundum chambers in the right foreground. These are right next to the clay chambers and are the last three carborundum chambers in the series of 23. The joints have been scraped a little to show the condition. The chambers have oxidized very badly; particularly at the top where they can be crumbled and ground between the thumb and the palm of the hand. These chambers will be replaced with clay chambers as they heat is not excessive. Note particularly the last of the three chambers - the swelling across the face just above the cenger. This is badly oxidized, and is probably an indication of what would happen to all of the chambers within a very short time.
- Date Issued:
- 1921-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph depicting Eagle Boats No. 2, 3, 4, and 5 stationed at the outfitting dock of the Ford River Rouge Factory Complex. Behind boat No. 5, part of a railway crane is visible. Further in the background, a large conveyor spans the frame. Workers are in view, including two on a floating platform on the starboard side of boat No. 3 and 4. Lower right hand corner of photo has number and date of photo: 23161-9-27-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Black and white photographic print mounted on fabric depicting a Jeffery Dewitt Kiln under construction at the Champion Porcelain Co. Dated 4-25-1919.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph showing the group under preparation for the installation of a rail transfer system to launch ships from Ford Motor Company's River Rouge development. The assembly building is on the right. Hand carts are in the foreground. Several workers are present. Steam shovels are at work. A train with railcars is in the background. Lower right hand corner shows photo number and date of photo: 22364-6-10-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Color postcard depicting a street view of the Ford plant in Highland Park. A water tower and a few pedestrians are visible. Handwritten message on verso, postmarked Jul, 1912. Printed on verso: Published by Souvenir Post Card Company Printed in New York.
- Date Issued:
- 1912-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Black and white photographic print mounted on fabric depicting women performing final decorating in Dept. 8 at the Champion Spark Plug Co.
- Date Issued:
- 1922-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph of progress attaching the framing and bulkheads to the keel of Eagle Boat No. 45 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. Workers standing on the boat's carriage position a frame near the bow, as a group of workers work near the boat's midsection on its port side work from atop a board spanning the top of several frame pieces. Another Eagle Boat is being plated in the background. A large piece of plating leans against a column on the right. Shelves and crates of materials, and a tool crib are visible in the adjacent aisle to the right."#45 11:46 A.M. 25858-2-20-19," is printed in the lower left corner of the recto, and "framing at bow nearing completion," is handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph depicting workers laying the keel for Eagle Boat No. 7 within the Ford Rouge Factory Complex. Another Eagle Boat is being plated in the background. Lower right hand corner shows photo number and date of photo: 22476-6-18-18 has number (7) written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph depicting workers installing additional plating to a keel during the manufacture of an Eagle Boat inside of the Ford River Rouge development. Verso: "Further plating is added." Lower right hand corner shows photo number and date of photo: 2169-5-21-18 with a number 2 written above.. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society