Search Constraints
« Previous |
151 - 160 of 708
|
Next »
Search Results
- Description:
- Black and white photograph depicting the Ford Motor Company center assembly line for World War I Eagle Boats at Building B in the company's River Rouge development. There is a keel being laid in foreground. In the background a partially completed Eagle Boat hull is visible. Several workers are also in the scene. Lower right hand corner shows photo number and date of photo: 22663-7-8-18. Photo mounted on a linen backing with flap on left side with holes for binding.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of the installation of the bow section to the hull of Eagle Boat No. 44 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. The bow plates are suspended from the overhead crane, and ladders are leaned against the section. A worker is seated on a board spanning several pieces of framing along the boat's starboard side. A group of workers are constructing a keel for another Eagle Boat on the left. Yet another Eagle Boat is under construction in the background. Coat racks, shelves, and piles of materials are along the wall on the right. "#44 2:42 P.M. 25868-2-20-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of a bent stabilizer fin on the port side of an Eagle Boat, supported on the assembly line carriage within building "B" of the Ford River Rouge Factory Complex, as viewed facing toward its stern. "Boat #6" has been written on the side of the hull. The pneumatic hose couplers on the floor beneath the assembly line's rails are visible. Scaffolding stands beside the boat on the right side of the frame. "27390-7-31-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken of the interior of the flooded outfitting building at the Ford River Rouge Workers in boots are standing in ankle-deep water. Stockpiled parts hung on the walls. Lower right hand corner show number and date of photo: 26170-03-17-19. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the interior of the Elevator Control Building at the Ford River Rouge Complex. This machinery is used to control the elevators used in launching the Eagle Boats. The caption, "Interior of elevator-control building," is printed on the verso. Lower right hand corner of photo has number and date of photo: 22643-7-16-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of workers beginning to attach plates to the side of Eagle Boat No. 45 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. A group of workers position a plate suspended by the overhead crane near the boat's bow. Workers continue to attach the framing near the boat's midsection. Another Eagle Boat is being plated in the background. A large piece of plating leans against a column on the right. Shelves and crates of materials, and a tool crib are visible in the adjacent aisle to the right."#45 12:46 P.M. 25859-2-20-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the port side of Eagle Boat No. 5 within the Ford Rouge Factory Complex. Workers have installed the bulkheads, framing, and one row of plates. Mobile elevated platforms are on the right side of the image along with materials are staged for use. Workers are present. The caption, "Stem in place, 2nd row plates being attached." is on the verso. Lower right hand corner of photo has number and date of photo: 22659-7-08-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers completing the keel of an Eagle Boat within the Ford Rouge Factory Complex. Another Eagle Boat is under construction in the background. The caption, "Keel complete, ready for first plates," is on the verso. Lower right hand corner shows photo number and date of photo: 22436-6-13-18 with a number (7) above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of the workers beginning to rivet plating on the side of the complete frame for Eagle Boat No. 43 within building "B" of the Ford River Rouge Factory Complex, as taken from above its port bow. The photo has been labeled with a "1" on one of the bulkheads near the bow. Another Eagle Boat is under construction in the background. Pieces of framing are piled along the wall on the left. "25831-2-17-19, #43" is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of progress attaching the framing and bulkheads to the keel of Eagle Boat No. 45 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. Workers standing on the boat's carriage position a frame near the bow, as a group of workers work near the boat's midsection on its port side work from atop a board spanning the top of several frame pieces. Another Eagle Boat is being plated in the background. A large piece of plating leans against a column on the right. Shelves and crates of materials, and a tool crib are visible in the adjacent aisle to the right."#45 11:46 A.M. 25858-2-20-19," is printed in the lower left corner of the recto, and "framing at bow nearing completion," is handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime