Search Constraints
« Previous |
171 - 180 of 708
|
Next »
Search Results
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59. A large work gang poses beside the keel, which has some bilge plates attached, within building "B" of the Ford River Rouge Factory Complex. The time of photo is 7:30 am. Three overhead cranes are positioned to assist in the record try. The crane in the foreground has a sign, that reads, "Pawling & Harnischfeler Co., Milwaukee, Wis., 5 ton, No.5444." Material is staged on the floor. The next bay is being used to stockpile kegs of rivets. Lower left hand corner show number and date of photo: 26293-04-02-19 with a #59 and 7:30 am written above. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting a completed Eagle Boat hull on the transfer bed at the Ford River Rouge Factory Complex. The boat is being moved to the launch elevator, seen in the background. Workers and spectators are observing the process. After launching, the boat will be moved to the outfitting station, also located on the Rouge River. Lower right hand corner of photo has number and date of photo: 22855-8-19-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the construction of the warehouse beside the riverside docks of the Ford Rouge Factory Complex. Workers are present. Another long warehouse building stands on the opposite side of the canal. Lower right hand corner shows photo number and date of photo: 22448-6-13-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting an Eagle Boat tied to the outfitting dock at the Ford River Rouge Factory Complex, where the boats are finished and their turbine engine installed. The charthouse and mast are being completed. Workers are visible. Lower right hand corner of photo has number and date of photo: 22903-8-29-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the foundation for the Ford Rouge complex's transfer bed in place as steel work for Ford Rouge Factory Building "B" is being erected in the background Workers, cranes, and rail cars are visible. Lower right hand corner shows photo number and date of photo: 21997-5-04-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of a small locomotive, stenciled with the number "1," pulling three cars of construction debris away from the Ford River Rouge Factory Complex, which is visible in the background. "27127-7-3-19," is printed in the lower right corner of the recto, and "Transportation facilities for moving salvage as blast furnace," is handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting hull plates being attached to the framing of Eagle Boat No. 2, viewed off of its starboard quarter, at the Ford River Rouge Complex. Additional plates are laying on floor. Workers are present. The photo is captioned, "First plate rivetted[sic] at side," on the verso. Lower right hand corner shows photo number and date of photo: 22246-5-29-18 with a number 2 above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting construction of the elevator used to launch Eagle Boats at the Ford Rouge Factory Complex. The concrete forms have been removed. Workers work on the elevator towers. Wooden scaffolds surround each Tower. Two cranes are on site. Lower right hand corner of photo has number and date of photo: 22586-7-05-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting a topside view of the Eagle Boat launch elevator at the Ford Rouge Factory Complex. Final preparations are in progress to complete work on the launch elevator. The Eagle Boat factory, known as Building "B" is in the background. The Launch Control Building is shown located next to the transfer bed. Workers are present. Lower right hand corner of photo has number and date of photo: 22613-7-08-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59. Workers work on the keel, which now has the framing and some bulkheads are now in place, within building "B" of the Ford River Rouge Factory Complex. The time of photo is 8:30 am. Lower left hand corner show number and date of photo: 26294-04-02-19 with a #59 and 8:30 am written above. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime