Quebec Bridge (1st bridge); General view after the collapse from the main pier southwards

Notes:
The bridge exceeded the weight limit for the lower chords, which were also faulty in their design, and it collapsed in mid-construction on August 29th, 1907.; Engineers: Theodore Cooper, Edward Hoare, John Sterling Deans, and Peter Szlapka; For more information see: William D. Middleton, The Bridge at Quebec (Bloomington: Indiana Univ. Press, 2001)
Date Issued:
1907-01-01T00:00:00Z
Data Provider:
University of Michigan. Libraries
Collection:
Art, Architecture and Engineering Library, Lantern Slide Collection
Place:
Canada
Subject Topic:
Transportation Facilities; Bridges; Aqueducts
Language:
UND
Rights:
http://quod.lib.umich.edu/t/text/accesspolicy.html
URL:
http://name.umdl.umich.edu/IC-UMMU2IC-X-LS017603%5DLS017603