Search Constraints
« Previous |
71 - 80 of 83
|
Next »
Search Results
- Description:
- Black and white photographic print mounted on fabric depicting the pre-heating end of the Jeffery Dewitt Kiln under construction at the Champion Porcelain Co. Caption reads: This shows the original construction over the Dressler Kiln #1, looking north from the south end of the building. The building over Dressler Kiln #1 was not built until a much later date. This picture shows the original construction before much of the building was reinforced and steel columns used. Dated 3-28-1919
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Black and white photographic print mounted on fabric depicting a Jeffery Dewitt Kiln under construction at the Champion Porcelain Co. Several workers pose for the picture. Dated Apr-11th-1919.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Black and white photographic print mounted on fabric depicting a Jeffery Dewitt Kiln under construction at the Champion Porcelain Co. Dated 4-25-1919
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Black and white photographic print mounted on fabric depicting the inside of a Jeffery Dewitt Kiln under construction at the Champion Porcelain Co., looking toward the head end. Dated July 7th 1919.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Black and white photographic print depicting the inside of the Dressler Kiln at the Champion Spark Plug Co. Caption on verso reads: Taken by the Carborundum Company 9-20-1921 - Showing interior of Dressler Kiln (The kiln had been in service for seven months - 2-4-1921 to 9-7-1921). Note particularly the three B mix carborundum chambers in the right foreground. These are right next to the clay chambers and are the last three carborundum chambers in the series of 23. The joints have been scraped a little to show the condition. The chambers have oxidized very badly; particularly at the top where they can be crumbled and ground between the thumb and the palm of the hand. These chambers will be replaced with clay chambers as they heat is not excessive. Note particularly the last of the three chambers - the swelling across the face just above the cenger. This is badly oxidized, and is probably an indication of what would happen to all of the chambers within a very short time.
- Date Issued:
- 1921-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Black and white photographic print mounted on fabric depicting a Jeffery Dewitt Kiln under construction at the Champion Porcelain Co. Dated 4-25-1919.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Black and white photographic print mounted on fabric depicting women performing final decorating in Dept. 8 at the Champion Spark Plug Co.
- Date Issued:
- 1922-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Black and white photographic print mounted on fabric depicting the cooling end of a Jeffery Dewitt Kiln under construction at the Champion Porcelain Co. Dated Apr.-5-1919.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Black and white photographic print mounted on fabric depicting the preheating end of a Jeffery Dewitt Kiln under construction at the Champion Porcelain Co. Dated 6-7-1919.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Black and white photographic print mounted on fabric depicting the preheating end a Jeffery Dewitt Kiln under construction at the Champion Porcelain Co. Dated June 23rd 1919.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society