Search Constraints
« Previous |
21 - 30 of 371
|
Next »
Search Results
- Description:
- Sepia-toned photograph of progress made plating the bow of the hull of Eagle Boat No. 39 within building "B" of the Ford River Rouge Factory Complex, as taken from above its port bow. Several plates have been applied at the bow. Blurred workers are busy on the floor beside the boat, as well as beneath its bow. Men work at desks on both the right and left sides of the aisle. Pieces of framing are piled along the wall on the left. "25635-2-3-19, #39" is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing an Eagle Boat being outfitted within Building B of the Ford Motor Company's River Rouge development, as taken from above the boat's stern. Elevated bins line the corridor. The ship's wheel has been installed mid-ship. Lower right hand corner shows photo number and date of photo: 22376-6-12-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of showing progress made on the construction of the hull of Eagle Boat No. 41 within building "B" of the Ford River Rouge Factory Complex, as taken from above its port quarter. The transom, propeller shaft tunnel, and several stringers and bulkheads are in place. "25736-2-10-19, #41" is printed in the lower left corner of the recto, and "Framing complete at stern," is handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers attaching plates to the keel of an Eagle Boat within the Ford River Rouge Complex. A coat rack and an attached shelf holding lunch pails are visible. The caption, "Plating at Keel as seen from stern," is on the verso. Lower right hand corner shows photo number and date of photo: 22268-5-31-18 with a number 5 written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting close-up view of workers riveting a keel during the manufacture of an Eagle Boat inside of the Ford River Rouge development. A tool belt with tools is in the foreground. Another Eagle Boat under construction is in the background. Verso: "Detail of assembly." Lower right hand corner shows photo number and date of photo: 22170-5-21-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing the Ford River Rouge Complex Building "B," under construction. Men are picturing installing glazing on the sides of the building near the building's front. Workers are present. Verso: Building front with glazing in progress (16 May 1918)". Lower right hand corner shows photo number and date of photo: 22101-5-16-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing men manufacturing a keel for an Eagle Boat on wooden platform mounted on rails inside of the Ford River Rouge development. Small carts are in the background loaded with material. Lower right hand corner shows photo number and date of photo: 22076-5-11-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of progress made in the construction of Eagle Boat No. 44 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. Workers are perched atop the struts across the frame pieces near the bow and boards spanning the tops of the frames near the boat's midsection. An overhead crane lowers one of the bulkheads into place near the stern. Another Eagle Boat is under construction in the background. Shelves and crates of materials are in the adjacent aisle on the left, and coat racks, shelves, and piles of materials are along the wall on the right. "#44 11:32 A.M. 25865-2-20-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting plates being attached to the keel of Eagle Boat No. 3, viewed from above looking bow to stern, at the Ford River Rouge Complex. Additional material is laying on floor. Workers are present. Lower right hand corner shows photo number and date of photo: 22247-5-29-18 with a number 3 above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59, within building "B" of the Ford River Rouge Factory Complex, as viewed from above the boat's port bow. Workers perched atop the hull are riveting and plating the deck. Scaffolding surrounds the sides of the hull. Lower left hand corner show number and date of photo: 26368-04-05-19 with a #59 written above. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime