Search Constraints
« Previous |
11 - 20 of 267
|
Next »
Search Results
- Description:
- Black and white photograph of a close-up of the Eagle Boat launch pit under construction at the Ford Rouge Factory Complex. Workers rivet cross pieces in place as other workers attend to the tower. Lower right hand corner of photo has number and date of photo: 22606-7-08-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photo of the construction site where the Cadillac Hotel was demolished to make way for the Book-Cadillac Hotel taken from the southwest corner of Washington Boulevard and Michigan Avenue, facing northeast. The lot is surrounded by a wooden fence with a construction canopy over the sidewalk. A sign for the foundation-laying company Spencer, White, and Prentis is posted above the fence. The Detroit Commerce Building with signage on its roof for the People's Outfitting Company is visible to the east of the site along Michigan. A police officer stands in the center of the street in the foreground as a man in a boater hat crosses. An electric streetcar proceeds east on Michigan on the right side of frame. Shadow, presumably of fingers over the lens, partially obscure the Detroit Edison Company office, the Washington Boulevard Building and the Alexander Macomb Monument on the left side of frame.
- Date Issued:
- 1923-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Detroit Views
- Description:
- Digital scan of a sepia-toned photo taken along the tracks northwest the Detroit portals of the Michigan Central Railway Tunnel during its construction. A Hocking Valley car is on the left, and on the right is a Michigan Central Railroad flatcar loaded with rails from the Mays Creek right-of-way which were being removed to make room for the new tunnel approach. Richard L. Aylward's coal business on Vermont Street stands beside the tracks on the right. The Vermont Street Bridge and Porter Street Bridge run overhead in the background. A caption printed along the bottom left reads, "137-6, Westerly Open Cut. W. from Portal, 5/28/07."
- Date Issued:
- 1907-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Black and white photographic print mounted on fabric depicting the cooling end a Jeffery Dewitt Kiln under construction at the Champion Porcelain Co. Dated 5-9-1919.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Champion Spark Plug Co.
- Description:
- Black and white photographic print mounted on fabric depicting the cooling end of a Jeffery Dewitt Kiln under construction at the Champion Porcelain Co. Dated 3-28-1919.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Champion Spark Plug Co.
- Description:
- Sepia-toned photograph depicting the steel framework of view of Ford River Rouge Complex Building "B" during its construction. The foreground shows the foundation and rails for the transfer bed. Workers are present. Lower right hand corner shows photo number and date of photo: 22064-5-13-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the construction of the elevator for launching Eagle Boats at the Ford Rouge Factory Complex. A crane moves a large wooden log while another crane sets metal beams. A steam shovel is excavating in the background. Workers and stored materials are also in view. The caption "Pit complete, elevator under construction," is on the verso. Lower right hand corner shows photo number and date of photo: 22525-6-26-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Digital scan of a sepia-toned photo of the opening of a small shaft using in constructing the Michigan Central Railway Tunnel. A small cart used to haul gravel is on tracks running from the mouth of the shaft up an incline toward the camera. Railroad tracks run along the bottom of a cut to the right of the shaft. Two figures stand among construction debris in the background. A caption printed along the bottom left reads, "158, Hauling Gravel up incline No. 3 Shaft, Windsor, 5/28/07."
- Date Issued:
- 1907-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Black and white photographic print mounted on fabric depicting the inside of a Jeffery Dewitt Kiln under construction at the Champion Porcelain Co., looking toward the head end. Dated July 7th 1919.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Champion Spark Plug Co.
- Description:
- Sepia-toned photograph depicting the construction of the elevator used to launch Eagle Boats at the Ford Rouge Factory Complex. Workers work on concrete forms and execavate by hand. A crane mounted on a rail car is on the right. Lower right hand corner of photo has number and date of photo: 22582-7-03-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime