Search Constraints
« Previous |
621 - 630 of 772
|
Next »
Search Results
- Description:
- Sepia-toned photograph showing the interior of Building B of the Ford Motor Company's River Rouge development containing an Eagle Boat in stocks with bracing upon rails. The boat's port side is show from its bow. A worker on a ladder installs plates. Its keel is marked with the number 4. Lower right hand corner shows photo number and date of photo: 22348-6-10-18 the number 4 appears above the date. Photo mounted on a linen backing with flap on left side with holes for binding.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph depicting an Eagle Boat parade float, believed to have been built at the Ford River Rouge Factory Complex, as taken from off its port quarter. Painted canvas hangs from the hull simulating waves. The float sits on a wooden platform supported by sawhorses, within a warehouse surrounded by crates. Lower right hand corner show number and date of photo: 23867-12-02-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph depicting Eagle Boat No. 1, the first Eagle Boat launched, stationed on the launch elevator at the Ford Rouge Factory Complex, as taken from off its port bow. Men stand upon the deck of the boat and atop the elevator towers. Spectators and workers are present. A Superior Dredging Company barge is in the background on the right. Lower right hand corner of photo has number and date of photo: 22630-7-11-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59. Workers work on the keel, which now has upper framing and bulkheads are riveted in place, within building "B" of the Ford River Rouge Factory Complex. The time of photo is 9:45 am. The caption, "Bulkheads spaced and rivitted [sic] in place," is on the verso. Lower left hand corner show number and date of photo: 26296-04-02-19 with a #59 and 9:45 am written above. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59, within building "B" of the Ford River Rouge Factory Complex, as viewed from off the boat's port bow. Workers atop the hull are completing the deck plating. Lower left hand corner show number and date of photo: 26371-04-07-19 with a #59 written above. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-Toned photograph depicting workers assembling a keel in the construction of an Eagle Boat inside the Ford River Rouge Complex. The right edge of photo shows an open-cab truck with canvas sides. Lower right hand corner shows photo number and date of photo: 22199-5-23-18 with a 3 above of the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph depicting the portside bow of Eagle Boat No. 6, under construction within the Ford Rouge Factory Complex. An overhead crane moves bulkhead framing into place. Workers are visible. Lower right hand corner shows photo number and date of photo: 22475-6-18-18 has number (6) written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph showing the construction of the Ford River Rouge Complex Power Plant. Workers are present. A rail track runs adjacent to building. The background shows workers and a team of horses. Verso: "Power plant under constn. [construction]." Lower right hand corner shows photo number and date of photo: 22105-5-16-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph showing Ford River Rouge Complex Building "B" nearing completion. Transfer bed rails are in the foreground. Workers are present. Lower right hand corner shows photo number and date of photo: 22106-5-16-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph of a close-up of workers working beside the propeller shaft beneath an Eagle Boat within the Ford Rouge Factory Complex, as taken from near its stern. The threaded end of the shaft is awaiting installation of propeller. A portion of the rudder is also visible. The caption, "Propeller shaft in place." is on the verso. Lower right hand corner of photo has number and date of photo: 22585-7-05-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society