Search Constraints
« Previous |
91 - 100 of 110
|
Next »
Search Results
- Description:
- Photograph. Sepia-toned photo showing the construction of a new railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "48," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; The Old and the New Bridge; Apr. 14, 1920; Photo W. B. James, Br. Inspt." The view looks northwestward (upstream) along the Rouge River and shows the old railroad swing bridge on the left (in open position) as well as the new single leaf Strauss trunnion bascule bridge on the right. The lift span portion of the new bridge is raised. The wooden formwork for one of the concrete counterweights can be seen just above the ground surface. A small portion of the new 2-story brick building for the bridge operator can be seen on the far right side of the photo.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "35," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; Erecting East Counterweight Truss; Photo W. B. James; Jan. 31, 1920." The view looks northward on the east side of the Rouge River and shows the tower post structure which provides support for the bridge counterweights. A construction crane can be seen in the right background as well as the 2-story brick building for the bridge operator.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the temporary concrete mixing plant for the construction of a railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "12," and additional text in top center area shows "M.C.R.R. River Rouge Bascule Bridge; Foundations; June 4, 1919; Mixing Plant." The view shows the aggregate hopper being loaded by a construction crane and bucket that can be seen at the left side of the photo. Two workmen are standing near the concrete mixer on the right side of the plant. The concrete mixer is positioned in order to pour the finished mixture into a second construction crane bucket that will carry the concrete to its placement location. Railroad tracks, temporary construction buildings, and piles of construction materials can be seen in the center area of the photo. Factory buildings and houses can be seen in the right background. A temporary construction building near the center of the photo has two signs on the roof. The text is not quite legible, but the sign on the left shows "[?] Foundations [?] Missouri Bridge & Iron Co. [?]" and the sign on the right shows "[?] Superstructure [?] Wisconsin Bridge & Iron Co. [?]."
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing a railroad bridge under construction over the Rouge River. Printed text in the lower left corner of the photo shows the number, "43," and "M.C.R.R. River Rouge Bascule Bridge; Erecting Lift Span; Mar. 27, 1920. Photo W. B. James, Insp." The view looks southeastward from the bank of the Rouge River and shows the truss structure that supports the bridge counterweights and lift span. The lift span is located at the far right side of the structure and a construction crane is lifting one of the structural members into position. The 2-story brick building for the bridge operator can be seen at the far left side of the photo. Near the center of the photo, a sign on the top of the river bank shows "Cables, Do Not Drag Anchor."
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the old M.C.R.R. railroad swing bridge being removed. The view looks northwestward across the Rouge River and shows the old bridge being loaded onto barges. It appears that two barges had been partially filled with water in order to lower their freeboard elevations. The barges were then moved under the old bridge and are now being pumped out as seen by the steam-powered pumps that are operating on both barges. As the pumping continues, the rising barges will lift the old bridge off of its foundation so that it can be towed away. Many workmen are standing on the old bridge and on the two barges.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing construction work for a new railroad bridge over the Rouge River. Printed text on the lower edge of the photo shows the date, "2-12-1920." The view shows two workmen who are standing between two large steel buckets that are used for placing concrete underwater. The workmen appear to be attaching cables and chains to the tops of the buckets so that they can be lifted into position by a construction crane.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the upper right corner of the photo shows the number, "38," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; Setting Derrick on Top of the Tower Span; Mar. 21, 1920; Photo W. B. James, Br. Inspt." The view looks northeastward and shows the tower posts and truss structures that support the bridge counterweights. A group of four workmen can be seen at the upper right top area of the structure. Part of a construction crane can be seen at the left side of the photo and factory buildings are visible in the distant background.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the new railroad bridge over the Rouge River. Printed text in the lower left corner of the photo shows the number, "60," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; View Looking South; May 29, 1920. Photo W. B. James, Br. Insp." The view looks along the existing railroad tracks and shows the bridge in a closed position. The massive concrete counterweights can be seen on the overhead trusses in the foreground on each side of the tracks. Several workmen are working on the railroad tracks. The 2-story brick building for the bridge operator can be seen at the far right side of the photo.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the top portions of two caissons that were part of the construction work for a railroad bridge over the Rouge River. The view shows the tops of the two caissons (one on each side of the existing railroad tracks) including circular scaffolding, various pieces of equipment, piping, and reinforcing bars. One workman is standing on top of the caisson in the center foreground and another is walking along the railroad tracks in the left background.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the lower right corner of the photo shows "M.C.R.R.; River Rouge Bascule; May 12, 1919. The view looks northeastward along the existing railroad tracks with caissons #1 and #2 on the right side of the tracks and caissons #3 and #4 on the left. Construction cranes, equipment, and temporary buildings are located on both sides of the tracks. Also, a temporary concrete mixing plant can be seen to the left of the railroad tracks. Several factory buildings are visible in the left background and a large railroad yard can be seen in the right background area.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society