Search Constraints
« Previous |
61 - 70 of 94
|
Next »
Search Results
- Description:
- One plan sheet entitled, "Str. [Steamer] Captain Thomas Wilson, Boiler Saddles." The drawing consists of black ink on linen and shows plan views and details of the saddle mountings for the boilers. The title block in the lower right corner shows that the drawing was prepared by the "Manitowoc Ship Building & Dry Dock Co." at a scale of 1/2 inch = 1 foot and is dated March 2, 1915. The plan number is shown as "3569."
- Date Issued:
- 1915-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- One plan sheet showing the "Arrangement Plans" for the Erie Railroad Transit Company tugboat, FREDERICK U. ROBBINS. The drawing consists of black ink on linen and shows a plan view of the layouts for the "Lower Deck Aft" and "Lower Deck Forward." The title block in the lower right corner shows that the drawing was prepared by the "Manitowoc Ship Building & Dry Dock Co." at a scale of 3/8 inch = 1 foot and is dated July 2, 1913. The plan number is shown as "1306."
- Date Issued:
- 1913-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- One plan sheet entitled, "Original Construction, Strs. [Steamers] Venus & Neptune, Str. Jupiter." The drawing consists of black ink on linen and shows longitudinal and half cross-section views of the hull and its structural framing configuration. The title block in the lower right corner shows that the drawing was prepared by "Manitowoc Ship Building & Dry Dock Co." at a scale of 1/2 inch = 1 foot and is dated December 11, 1914. The drawing number is shown as "3560."
- Date Issued:
- 1915-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- One plan sheet entitled, "Offsets for Fire Tug, Clevelander." The drawing consists of ink on linen and shows a table of offset dimensions and a half-section detail of the hull for the fire tugboat, Clevelander. (Other sheets in this plan set reference the George A. Wallace.) The title block in the lower right corner shows that the drawing was prepared by the "Manitowoc Ship Building & Dry Dock Co." and is dated November 2, 1915. The plan number is shown as "2453."
- Date Issued:
- 1915-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- One plan sheet showing the "Arrangement of Steering Gear" for the Erie Railroad Transit Company tugboat, FREDERICK U. ROBBINS. The drawing consists of black ink on linen and shows a hull/deck cross section view of the layout for the steering cable and sheaves. The title block in the lower right corner shows that the drawing was prepared by the "Manitowoc Ship Building & Dry Dock Co." at a scale of 1 inch = 1 foot and is dated August 14, 1913. The plan number is shown as "1313."
- Date Issued:
- 1913-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- One drawing entitled, "Rearrangement of Tug Frank Perry." The drawing consists of black ink on linen and shows a plan view of the main deck cabin areas. The title block in the lower right corner shows that the drawing was prepared by the "Manitowoc Ship Building & Dry Dock Co." at scales of 1/4 inch = 1 foot and 1 inch = 1 foot. The plan number is shown as "5067" and is dated May 8, 1912.
- Date Issued:
- 1912-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- One plan sheet entitled, "Hatch Covers & Details, Strs. Venus & Neptune." The drawing consists of black ink on linen and shows various structural details of the hatch covers and coaming for the steamships, Venus and Neptune. The title block in the lower right corner shows that the drawing was prepared by "Manitowoc Ship Building & Dry Dock Co." at scales of 1/2, 1 1/2, and 3 inches = 1 foot and is dated November 25, 1914. The drawing number is shown as "4213."
- Date Issued:
- 1914-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- One plan sheet entitled, "Captain Thomas Wilson, Boiler Room Floor & Ash Guard." The drawing consists of black ink on linen and shows views and details of the boiler room floor. The title block in the lower right corner shows that the drawing was prepared by the "Manitowoc Ship Building & Dry Dock Co." at a scale of 1/2 inch = 1 foot and is dated March 10, 1915. The plan number is shown as "3572."
- Date Issued:
- 1915-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- One blueprint drawing entitled "Inboard Profile, S.S. Alabama - Goodrich Transit Co." The drawing shows an interior profile view of the proposed steamship. The title block in the lower right corner shows that the drawing was prepared by the "Manitowoc Ship Building & Dry Dock Co." at a scale of 1/4 inch = 1 foot and is dated October 19, 1914. The plan number is shown as "5034."
- Date Issued:
- 1914-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- One plan sheet showing "Lines" for the Erie Railroad Transit Company tugboat, FREDERICK U. ROBBINS. The drawing consists of black ink on linen and shows profile and cross section lines for the hull of the proposed tugboat. The title block in the lower right corner shows that the drawing was prepared by the "Manitowoc Ship Building & Dry Dock Co." at a scale of 3/8 inch = 1 foot and is dated February 13, 1913. The plan number is shown as "5076."
- Date Issued:
- 1913-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society