Search Constraints
« Previous |
281 - 290 of 1,465
|
Next »
Search Results
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59, within building "B" of the Ford River Rouge Factory Complex, as viewed from above the boat's port bow. Workers on scaffolds rivet the hull's plates, while men on top of the framing appear ready to install decking. The time of photo is 3:00 pm. Lower left hand corner show number and date of photo: 26317-04-03-19 with a #59 and 3:00 pm written above. Photo mounted on a linen backing. Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59, within building "B" of the Ford River Rouge Factory Complex, as viewed from off the boat's port bow. Large wooden scaffolds are now in place. A group of figures are gathered on the right edge of the frame. Lower left hand corner show number and date of photo: 26364-04-03-19 with a #59 written above. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers attaching plating to the keel of an Eagle Boat under construction inside the Ford River Rouge Complex. An overhead crane is visible in the background. Lower right hand corner shows photo number and date of photo: 22198-5-23-18 with a 2 above of the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the starboard bow of the hull of Eagle Boat No. 3 during its assembly within the Ford Rouge Factory Complex. Workers install the framing of the boat. A wooden access ladder, an overhead crane, and plates staged on floor awaiting installation are all in view. The caption "Upper frames set," is on the verso. Lower right hand corner shows photo number and date of photo: 22472-6-18-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Black and white photographic print depicting the inside of the Dressler Kiln at the Champion Spark Plug Co. Caption on verso reads: Taken by the Carborundum Company 9-20-1921 - Showing interior of Dressler Kiln (The kiln had been in service for seven months - 2-4-1921 to 9-7-1921). This is a detail of the #A mix better showing the condition of the joints and the chambers. These chambers are the twelfth, eleventh and tenth from the damper box, while the chambers shown in the previous photograph are the #B mix, taken further down the kiln towards the exhaust gas end. Compare these photographs with the one taken last November and not the cleanliness of these chambers as compared with those of the previous photograph.
- Date Issued:
- 1921-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Champion Spark Plug Co.
- Description:
- Black and white photographic print mounted on fabric depicting equipment in the Electrical Laboratory at the Champion Spark Plug Co. Caption on verso reads, "Electrical Laboratory where the thermocouples are tested and various instruments made."
- Date Issued:
- 1922-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Champion Spark Plug Co.
- Description:
- Black and white photographic print depicting a vestibule in a Detroit United Railway streetcar. Arrows point to elements that are maple, soft steel, and rod. Image from page 68 of D.U.R. Photographs to Accompany Report of C.H. Fessenden, Sept. 3, 1921.
- Date Issued:
- 1921-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Transportation
- Description:
- Black and white photographic print depicting the inside of the Dressler Kiln at the Champion Spark Plug Co. Caption on verso reads: Taken by the Carborundum Company 9-20-1921 - Showing interior of Dressler Kiln (The kiln had been in service for seven months - 2-4-1921 to 9-7-1921). Looking down the carbofrax B muffles in the same direction as the gases pass. This shows the amount of silica on the surface: also the condition of the joints. Unfortunately the picture is out of focus and does not show the joints as well as it should. However, they are very much better than they were in the case of the previous failure. The mortar used in these joints is a mixture of 80% carborundum 14 and finer, 20% clay, and in no case has attached the carborundum chambers. Previously a mixture of clay and alumina was used and altho the mortar was not attached the carborundum had been eaten away on both sides permitting leaks. These chambers were in the kiln not only during this burning but during the previous burning as well, this is, altogether about fourteen operating months.
- Date Issued:
- 1921-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Champion Spark Plug Co.
- Description:
- Sepia-toned photograph of workers plating the hull of Eagle Boat No. 37 within building "B" of the Ford River Rouge Factory Complex, as taken from above its port bow. Much of its bow, and a strip along the center of its side are plated. A group of men work on wooden platforms spanning the tops of the boat's framing. Another Eagle Boat is under construction in the background, and the keel of a third is being prepared off the starboard side of No. 37. Pieces of framing are piled along the wall on the left. "25632-2-3-19, #37" is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing the Eagle Boat assembly line in Building B of the Ford Motor Company's River Rouge development . A carriage is being assembled in the foreground. The number 8 has been handwritten next to it. Two partial hulls, hand labeled 4 and 6, are in the background. Workers are present. Verso: "Carriage Complete". Lower right hand corner shows photo number and date of photo: 22352-6-10-18. Photo mounted on a linen backing with flap on left side with holes for binding.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Black and white photograph depicting workers attaching plates to the keel of an Eagle Boat within Ford River Rouge Complex Building "B." The foreground shows material staged to be installed. Lower right hand corner shows photo number and date of photo: 2163-5-20-18 with number 1 written above. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime