- Sepia-toned photograph of workers assembling Model T parts within a workshop. The man in the foreground works on a short block at a bench, while another man works on a transmission cover and pedal cluster across the bench. An engine is on the ground behind the feet of the man in the foreground. In the background, another man works on a long block on a stand. Two blacksmiths work at a forge in the corner. "27187-7-11-19," is printed in the lower right corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting a metal fabricating shop within the Ford River Rouge Complex. Heavy duty machinery shown and steel plates seen ready for modification are visible. Lower right hand corner shows photo number and date of photo: 21991-5-04-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59. Workers rivet the framing and bulkheads, within building "B" of the Ford River Rouge Factory Complex, as viewed from above the boat's starboard quarter. The time of photo is 10:30 am. Lower right hand corner show number and date of photo: 26297-04-02-19 with a #59 and 10:30 am written above. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers building forms for the foundation of the transfer bed on the grounds of the Ford Rouge Factory Complex. Pile drivers and two stopped locomotives with coupled rail cars are visible in the background. The caption "Forms are built for transfer bed foundations," is on the verso. Lower right hand corner shows photo number and date of photo: 22449-6-13-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of progress made in the plating of the hull of Eagle Boat No. 44 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. Ladders are leaned against the bow plate section, as a worker hunches over the keel where the bow plates are being attached. A worker stands beside the keel which is under construction for another Eagle Boat on the left. Yet another Eagle Boat is under construction in the background. Coat racks, shelves, and piles of materials are along the wall on the right. "#44 3:42 P.M. 25869-2-20-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph workers on scaffolding finishing riveting the top row of plates on Eagle Boat No. 2, as viewed from off its port quarter, within the Ford River Rouge Factory Complex. Lower right hand corner of photo has number and date of photo: 22714-7-19-18 with a (2) above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of showing progress made on the construction of the hull of Eagle Boat No. 38 within building "B" of the Ford River Rouge Factory Complex, as taken from above its port quarter. The transom, propeller shaft tunnel, and several stringers and bulkheads are in place. "25633-2-3-19, #37" is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59, within building "B" of the Ford River Rouge Factory Complex, as viewed from the ground below boat's port quarter. The propeller support and the machine used to install the propeller shaft are in place beneath the stern. Scaffolding surrounds the sides of the boat, and a worker stands on it near the transom. The caption, "Shaft is installed," is printed on the verso. Lower right hand corner show number and date of photo: 26370-04-07-19 with a #59 written above. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting a view overlooking the assembly of the keel for Eagle Boat No. 8, from above its bow looking aft toward the keels of Eagle Boats No. 7 and 6, within the Ford Rouge Factory Complex. Workers have installed the bilge plates and one bulkhead. A small tractor is being driven by a worker at the lower left. Other workers are present. The caption, "Ship No. 8 with numbers 7 & 6 in the background, is on the verso." Lower right hand corner of photo has number and date of photo: 22662-7-08-18 with a (8) written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing the construction of a Ford Eagle Boat hull within Building B of the company's River Rouge development. Three men are shown working. The boat is in stocks with bracing atop a set of rails. An overhead crane is suspended in the background. Lower right hand corner shows photo number and date of photo: 22312-6-5-18. Above the number is a small "(2)." Photo mounted on a linen backing with flap on left side with holes for mounting.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime