Search Constraints
« Previous |
91 - 100 of 939
|
Next »
Search Results
- Description:
- Sepia-toned photograph taken of overlooking the partial demolition of a strip through the center of a building at the Ford River Rouge Factory Complex, to create a path for railroad tracks. Workers are perched atop temporary wooden trusses which been set up bridging the gap in the center of the building. Wood is piled in the foreground on the left, and many other construction materials are piled on the opposite side of the building in the background. Also visible in the background are workers digging a trench for the tracks which will extend from the existing tracks. "26785-5-29-19," is printed in the lower right corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting cranes setting the steel structure for Building "B" of the Ford River Rouge Complex. Rail tracks run from the foreground. A roof truss is waiting beside the structure to be set in place. Workers are visible throughout the scene. Lower right hand corner shows photo number and date of photo: 21986-5-04-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting Eagle Boat No. 2 stationed at the outfitting dock of the Ford River Rouge Factory Complex. The boat has its deck guns and cannon installed, and its anchor in place, and appears nearly done. Workers are visible. A floating platform is off of the boat's starboard side. A man in a small winch-powered ferry is visible near the boat's bow. Lower right hand corner show number and date of photo: 23307-10-11-18 with "No. 2" above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting cranes being used in the construction of Building "B"view at the Ford River Rouge Complex. Rail tracks run through the structures. Beams and trusses are staged for use. Workers are visible. Verso: "Steelwork in progress (4 May 1918)." Lower right hand corner shows photo number and date of photo: 21987-5-04-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers installing plates for the hull of Eagle Boat No. 6 within the Ford Rouge Factory Complex. Another Eagle Boat is being constructed in the background. Lower right hand corner shows photo number and date of photo: 22435-6-13-18 with a number (6) above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting an elevated overview of the transfer bed at the Ford Rouge Factory Complex where workers are making final adjustments. A crane is mounted on a railcar in the foreground. Building "B" in background, and to the right the power house is producing smoke from it's stack. Lower right hand corner shows photo number and date of photo: 22526-6-26-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of the interior of the flooded outfitting building at the Ford River Rouge Factory Complex. Pipefitting benches, a small boiler used for heat, and tools are in view. Lower right hand corner show number and date of photo: 26177-03-17-19. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers, including two on suspended scaffolding working on the hull of Eagle Boat No. 1, as viewed off of its starboard quarter with the Ford Rouge Factory Complex. Verso: "Plating complete". Lower right hand corner shows photo number and date of photo: 22470-6-18-18 has 1 written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting Eagle Boat No. 1, the first Eagle Boat launched, stationed on the launch elevator at the Ford Rouge Factory Complex, as taken off of its port quarter. Men stand upon the deck of the boat and atop the elevator towers. Spectators and workers are present. The caption, "Eagle is wheeled unto elevator," is printed on the verso. Lower right hand corner of photo has number and date of photo: 22632-7-11-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the framing being added to the plated keel of an Eagle Boat No. 4, viewed from above its bow facing its stern, at the Ford River Rouge Complex. Additional material staged on floor. An overhead crane is visible in the background. Workers are present. Lower right hand corner shows photo number and date of photo: 22248-5-29-18 with a number 4 above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime