Search Constraints
« Previous |
591 - 600 of 772
|
Next »
Search Results
- Description:
- Sepia-toned photograph taken overlooking stacks of barrels of rivets within building "B" of the Ford River Rouge Factory Complex, as taken from on deck of an Eagle Boat under construction in the building. Four other Eagle Boats are also under construction in adjacent aisles in the background. "27141-7-8-19," is printed in the lower right corner of the recto, and "Rivets," and "13," are handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph of the port side of Eagle Boat No. 17 in the water. Uniformed naval personnel are on deck. "27148-7-8-19," is printed in the lower right corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph showing the a stern view of a Ford Eagle Boat hull under construction within Building B of the company's River Rouge development. In the background, a more complete boat is visible. Both boats are in stocks with bracing. Lower right hand corner shows photo number and date of photo: 22310-6-5-18. "(1),'s is written above that number. Photo mounted on a linen backing with flap on left side with holes for binding.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph depicting workers assembling pre-fab panels on a long low building next to the Rouge River at the Ford River Rouge Complex. Rail track run through the foreground. A Hulett crane is in the background. Building "B" is on the right. Lower right hand corner shows photo number and date of photo: 22289-6-03-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Staple-bound report, dated November 20, 1916, from the Navy Department, Bureau of Construction and Repair, containing two articles, "Air Test of Compartments," and "Extracts from Report of Air Tests of Compartments and Zones of Water-Ejecting System on the U.S.S. OKLAHOMA," both written J.G. Tawresey of the U.S. Navy. A stamp on the cover indicates that the report was receives by the Ford Motor Company's Office of the Superintending Constructor for the U.S. Navy on February 27, 1919, in preparation for the construction of the Ford Eagle Boats later that year. "Noted R.K.," is handwritten in pencil on the upper left corner of the first page.
- Date Issued:
- 1916-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph depicting Eagle Boat No. 1 at dockside at the Ford River Rouge Factory Complex being outfitted, as taken from off its starboard side from the opposite shore. The boom of the mobile rail-mounted crane is visible above the bow . Workers are present. Lower right hand corner of photo has number and date of photo: 22693-7-18-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph depicting workers riviting plates onto an Eagle Boat hull from scaffolding attached to the starboard side of boat within the Ford Rouge Factory Complex. Material is staged nearby for use. Lower right hand corner shows photo number and date of photo: 22450-6-13-18 has 1-4 written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph of showing progress made on the construction of the hull of Eagle Boat No. 39 within building "B" of the Ford River Rouge Factory Complex, as taken from above its port quarter. The propeller shaft tunnel, and several stringers and bulkheads are in place. The tool crib and shelves of materials are visible in the adjacent aisle on the right. "25634-2-3-19, #39" is printed in the lower left corner of the recto, and "6A3, Shaft tunnel in place at stern," is handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph showing the excavation of a canal and elevator for launching Eagle Boats at the Ford Motor Company's River Rouge development . Steam shovels are shown at work. Bracing for elevator and canal is in place. The Rouge River in background. Lower right hand corner shows photo number and date of photo: 22353-6-10-18. Photo mounted on a linen backing. Flap on left side with holes for mounting is binding.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph showing the interior of factory building in Ford's River Rouge development with men laying support beams on rail transport used in ship construction. The center bay shown. An automobile is shown beside a photographer with a camera on a tripod. Lower right hand corner shows photo number and date of photo: 22079-5-11-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society