- Description:
- Sepia-toned photograph showing men working on a foundation at the Ford River Rouge development. Two mechanical post drivers are setting wooden posts in place. Men excavate trench footing. The Rouge River seen in background. Lower right hand corner shows photo number and date of photo: 22078-5-11-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph depicting men at work stations attaching plates to the hull of Eagle Boat No. 1, viewed from its port bow, within the Ford River Rouge Complex. An overhead crane and operator are visible. Additional plates and material are laying on the floor. Lower right hand corner shows photo number and date of photo: 22283-6-03-18 with a number 1 written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph depicting rows of Eagle Boat turbine engines and components staged on the floor of the Ford Highland Park Factory, as taken from above. Milling machines line the glass window wall. These engines were manufactured for Ford's Eagle Boats being constructed at Ford's River Rouge Complex. The engines produced 2,500 hp. Seventy-five engines were built with parts enough for 15 more. On the Verso: "Powerplants at H.P." Lower right hand corner show number and date of photo: 23419-10-21-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph taken of an unused aisle within building "B" of the Ford River Rouge Factory Complex. Tracks run along the center of the aisle. Metal plates are leaned inside of bins along the sides of the aisle. A group of people are gathered in the aisle in the distance. Hats and lunch boxes are stored atop a coat rack behind one of the bins on the left. In the background on the left, Eagle Boat No. 54 is under construction in the adjacent aisle. Its starboard quarter is to the camera. Scaffolding surrounds its hull, and a worker stands on its deck. Another Eagle Boat is positioned ahead of No. 54 in the same aisle. 26780-5-29-19," is printed in the lower right corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph depicting the steel framework of view of Ford River Rouge Complex Building "B" during its construction. The foreground shows the foundation and rails for the transfer bed. Workers are present. Lower right hand corner shows photo number and date of photo: 22064-5-13-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph depicting workers assembling a pre-fab structure next to the Rouge River in the construction of the Ford River Rouge Complex. Small cement carts are visible. Men work on rail tracks on the right edge of the frame. Steam shovels are visible in the background. A smoke stack with "Ford" painted on it is visible adjacent to a large steel framed structure in the background on the left. Lower right hand corner shows photo number and date of photo: 22266-5-31-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph depicting the manufacture of Eagle Boat No. 3 within the the Ford Rouge Factory Complex, as viewed from of its starboard bow. A Worker rivites a plate to the side beside the bow. Work also progresses on its upper plating. A worker stands on a mobile work station in the background on the left. Several other workers are also present. A number 3 is painted on the keel. The caption, "2nd row of plates nearing completion," is printed on the verso. Lower right hand corner shows photo number and date of photo: 22529-6-26-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph depicting an Eagle Boat Engine atop a make-shift stand within the Ford Highland Park Plant. These engines were manufactured at the Highland Park Plant and then transported to the Ford River Rouge Factory. Men are seen in the background holding up a large white sheet to aid in photo contrast while other workers are observing. Lower right hand corner of photo has number and date of photo: 23000-9-12-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph depicting Eagle Boat No. 2 stationed at the outfitting dock of the Ford River Rouge Factory Complex. The boat has its deck guns and cannon installed, and its anchor in place, and appears nearly done. Workers are visible. A floating platform is off of the boat's starboard side. A man in a small winch-powered ferry is visible near the boat's bow. Lower right hand corner show number and date of photo: 23307-10-11-18 with "No. 2" above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph depicting a large steel building and two wooden buildings under construction at the Ford River Rouge Complex. The wooden buildings appear near completion. Rail dollies are gathered beside the tracks in the foreground. Lower right hand corner shows photo number and date of photo: 21992-5-04-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society