Search Constraints
« Previous |
601 - 610 of 708
|
Next »
Search Results
- Description:
- Sepia-toned photograph of the installation of the bow section to the hull of Eagle Boat No. 44 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. The bow plates are suspended from the overhead crane, and ladders are leaned against the section. A worker is seated on a board spanning several pieces of framing along the boat's starboard side. A group of workers are constructing a keel for another Eagle Boat on the left. Yet another Eagle Boat is under construction in the background. Coat racks, shelves, and piles of materials are along the wall on the right. "#44 2:42 P.M. 25868-2-20-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph depicting the interior of the Ford Rouge Complex where dollies are being staged for the construction of an Eagle Boat keel in the foreground as workers begin plating the hull of another Eagle Boat in the background. An overhead crane is also visible in the background. Verso: "While another Eagle boat progresses (background) dolly 05 carriage is prepared for keel laying on assembly line tracks." Lower right hand corner shows photo number and date of photo: 22288-6-03-18 with a number 6 written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph of progress made plating the hull of Eagle Boat No. 43 within building "B" of the Ford River Rouge Factory Complex, as taken from above its port bow. Several plates have been applied at the bow, as well as in a strip along its side. Workers are gathered beside the boat. Another Eagle Boat is under construction in the background. Pieces of framing are piled along the wall on the left. "25835-2-18-19, #43" is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph depicting several machines, mounted on rails, used to install the propeller drive shaft, beneath an Eagle Boat within the Ford Rouge Factory Complex, as taken below its port quarter. Lower right hand corner of photo has number and date of photo: 22583-7-03-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph depicting workers attaching plates to the keel of an Eagle Boat within Ford River Rouge Complex Building "B." Verso: "and grows".Lower right hand corner shows photo number and date of photo: 2164-5-20-18 with number 2 written above. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph depicting workers standing on ladders installing the upper plates on the hull of Eagle Boat No. 4, as taken from off its port quarter within the Ford Rouge Factory Complex. The caption, "Sides nearing completion," is on the verso. Lower right hand corner shows photo number and date of photo: 22497-6-22-18 with a number (4) written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph showing the nearly completed exterior of factory building at Ford Motor Company's River Rouge Complex. Rail cars are on the left. Horse carts haul materials around the building. Lower right hand corner shows photo number and date of photo: 22032-5-8-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph taken overlooking construction at the Ford Rouge Factory Complex grounds. In the foreground workers setting rails in place. Beyond them workers dig a trench beside the tranfer table foundatation. Lower right hand corner shows photo number and date of photo: 22479-6-18-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph depicting a completed Eagle Boat hull on the transfer bed at the Ford River Rouge Factory Complex. The boat is being moved to the launch elevator, seen in the background. Workers and spectators are observing the process. After launching, the boat will be moved to the outfitting station, also located on the Rouge River. Lower right hand corner of photo has number and date of photo: 22855-8-19-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph depicting cranes being used in the construction of Building "B"view at the Ford River Rouge Complex. Rail tracks run through the structures. Beams and trusses are staged for use. Workers are visible. Verso: "Steelwork in progress (4 May 1918)." Lower right hand corner shows photo number and date of photo: 21987-5-04-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society