- Sepia-toned photograph depicting workers installing additional plating to a keel during the manufacture of an Eagle Boat inside of the Ford River Rouge development. Verso: "Further plating is added." Lower right hand corner shows photo number and date of photo: 2169-5-21-18 with a number 2 written above.. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph of progress made in the construction of Eagle Boat No. 44 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. Workers on ladders and perched atop pieces of the frame position struts spanning several pieces of framing near the bow, as workers guide bulkheads suspended from the overhead crane into position near the stern. Another Eagle Boat is under construction in the background. Shelves and crates of materials are in the adjacent aisle on the left, and coat racks, shelves, and piles of materials are along the wall on the right. "#44 10:32 A.M. 25864-2-20-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph of the interior of the flooded outfitting building at the Ford River Rouge Factory Complex. Pipefitting benches, a small boiler used for heat, and tools are in view. Lower right hand corner show number and date of photo: 26177-03-17-19. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph taken of overlooking the partial demolition of a strip through the center of a building at the Ford River Rouge Factory Complex, to create a path for railroad tracks. Workers are perched atop temporary wooden trusses which been set up bridging the gap in the center of the building. Wood is piled in the foreground on the left, and many other construction materials are piled on the opposite side of the building in the background. Also visible in the background are workers digging a trench for the tracks which will extend from the existing tracks. "26785-5-29-19," is printed in the lower right corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph of a worn Eagle Boat's propeller taken at the Ford River Rouge Factory Complex when the boat was in dry dock, supported on a timber frame. A heavy rope is partially wrapped around the propeller. "Boat #6. Do not touch or take off this propeller or cable. - Mr. Whiting, A.M." is written on one of the propeller's blades. "27387-7-31-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph showing the construction of the Ford River Rouge development Building "B" and grounds. A steam driven pile driver sets the foundation in the foreground. Men are present. Cranes set the steel framing for Building "B" in the background. Verso: "Pilings are driven for elevator foundation work." Lower right hand corner shows photo number and date of photo: 22037-5-08-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-Toned photograph depicting interior view of the Ford River Rouge Complex. Shows view of metal frabricating shop. Heavy duty machinery. Shows steel plates ready to be modified. Shows tool crib against a wall. Time- clock with time cards in rack visable in background. Verso: "Punching shell plates preparatory to construction of first hull." Lower right hand corner shows photo number and date of photo: 21989-5-04-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph depicting the port side of Eagle Boat No. 5 within the Ford Rouge Factory Complex. Workers have installed the bulkheads, framing, and one row of plates. Mobile elevated platforms are on the right side of the image along with materials are staged for use. Workers are present. The caption, "Stem in place, 2nd row plates being attached." is on the verso. Lower right hand corner of photo has number and date of photo: 22659-7-08-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph depicting the starboard bow of the hull of Eagle Boat No. 3 during its assembly within the Ford Rouge Factory Complex. Workers install the framing of the boat. A wooden access ladder, an overhead crane, and plates staged on floor awaiting installation are all in view. The caption "Upper frames set," is on the verso. Lower right hand corner shows photo number and date of photo: 22472-6-18-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59, within building "B" of the Ford River Rouge Factory Complex, as viewed from above the boat's port bow. Workers on scaffolds rivet the hull's plates, while men on top of the framing appear ready to install decking. The time of photo is 3:00 pm. Lower left hand corner show number and date of photo: 26317-04-03-19 with a #59 and 3:00 pm written above. Photo mounted on a linen backing.