Search Constraints
« Previous |
201 - 210 of 225
|
Next »
Search Results
- Description:
- Sepia-toned photograph of progress attaching the framing and bulkheads to the keel of Eagle Boat No. 45 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. A worker on a ladder and a worker standing on the keel work to position a frame near the bow, as another group of workers work near the boat's midsection. Another Eagle Boat is being plated in the background. A large piece of plating leans against a column on the right. Shelves and crates of materials, and a tool crib are visible in the adjacent aisle to the right."#45 9:39 A.M. 25857-2-20-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers laying the keel for Eagle Boat No. 7 within the Ford Rouge Factory Complex. Another Eagle Boat is being plated in the background. Lower right hand corner shows photo number and date of photo: 22476-6-18-18 has number (7) written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the framing being installed for Eagle Boat No. 4 within the Ford River Rouge Complex. An overhead crane is visible in the background. A kneeling man works in the foreground. Additional plates and material are laying on floor. Two additional Eagle Boats are in the background. Lower right hand corner shows photo number and date of photo: 22286-6-03-18 with a number 4 written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers at the Ford River Rouge Complex working on plating for an Eagle Boat in the foreground as Eagle Boat No. 2 is visible in the background with plates attached to its keel. The photo is captioned, "Engine bed and first bulkhead are set" on the verso. Lower right hand corner shows photo number and date of photo: 22220-5-27-18. Has a number 2 written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting an Eagle Boat under construction within the Ford River Rouge Complex. The boat's is supported by wooden framing. Plates have been attached to its keel, and several frames and bulk heads are in place. Workers are also present in the scene. Lower right hand corner shows photo number and date of photo: 22244-5-29-18 with a number 1 above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers standing on ladders riveting the side of Eagle Boat No. 2 as viewed from off its starboard bow within the Ford Rouge Factory Complex. Lower right hand corner shows photo number and date of photo: 22495-6-22-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken of the interior of the room housing the hydraulic elevator machinery at the River Rouge Factory Complex. A series of pipes and valves run from the electrical generator into the foreground. A large cylindrical tank is suspended on a stand on near the wall on the right. "26398-04-11-19," is printed in the lower right corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing the interior of factory building at Ford Motor Company's River Rouge development. A cluster of men are gathered on the main floor near large opening in the wall, as men work on the ceiling from a catwalk above. A water cooler with extra bottles and a hat and coat rack with lunch pails are in view. Another building can be seen through the door opening. Lower right hand corner shows photo number and date of photo: 22027-5-8-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers finishing the stern of the completed hull of Eagle Boat No. 1, as viewed from off its port quarter within the Ford Rouge Factory Complex. A portable workstation is shown. Lower right hand corner shows photo number and date of photo: 22494-6-22-18 with a (1) written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting framing and plating being installed on Eagle Boat No. 2 within the Ford Rouge Factory Complex. Lower right hand corner shows photo number and date of photo: 22431-6-13-18 with a (2) over the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime