Search Constraints
« Previous |
81 - 90 of 225
|
Next »
Search Results
- Description:
- Sepia-toned photograph taken of a large dial display within the room housing the hydraulic elevator machinery at the River Rouge Factory Complex. The large dial has four needles, and a scale that runs from 0 to 27, likely representing the displacement of the elevator in feet. A bell, a series of four numbered lights, and a small pressure gauge are located beneath the large dial display. A series of pipes and valves are in the foreground. "26399-04-11[?]-19," is printed in the lower right corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the upper plates being installed on Hull Eagle Boat No. 3, as taken from off its starboard quarter, within the Ford Rouge Factory Complex. An overhead crane is positioned above the hull. The caption "And growing" is on the verso. Lower right hand corner shows photo number and date of photo: 22496-6-22-18 with a number (3) written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of progress made in the construction of Eagle Boat No. 44 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. Workers on ladders and perched atop pieces of the frame position struts spanning several pieces of framing near the bow, as workers guide bulkheads suspended from the overhead crane into position near the stern. Another Eagle Boat is under construction in the background. Shelves and crates of materials are in the adjacent aisle on the left, and coat racks, shelves, and piles of materials are along the wall on the right. "#44 10:32 A.M. 25864-2-20-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the keel for Eagle Boat No. 8, as well as another Eagle Boat under construction in the background, within the Ford Rouge Factory Complex. Material and supplies are staged and stored on the floor in the foreground. Lower right hand corner shows photo number and date of photo: 22500-6-22-18 with a number (8) written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of a worker and a large pump on a cart inside the flooded outfitting building at the Ford River Rouge Factory Complex. The pump's suction pipe is submerged. Lower right hand corner show number and date of photo: 26176-03-17-19. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the interior of a long low wooden building at the Ford Rouge Factory Complex. Rails run along concrete piers along the center of the building. A wooden job-site work box is shown in the foreground. The left side of the building has moveable doors that run entire length of the building. Workers assemble panels in the background. Metal panels are staged on the floor. Lower right hand corner shows photo number and date of photo: 22567-7-02-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph a carriage on rails on the Eagle Boat assembly line with the hull of Eagle Boat No. 9 being plated in the background, within the Ford Rouge Factory Complex. Workers are present. Plates are stored on the floor in the foreground. Lower right hand corner shows photo number and date of photo: 22478-6-18-18 has number (9) written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59. Workers inside of the hull install plates, rivet, and space the framing, within building "B" of the Ford River Rouge Factory Complex, as viewed from above the boat's stern. The time of photo is 1:30 pm. Lower left hand corner show number and date of photo: 26300-04-02-19 with a #59 and 1:30 pm written above. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of a close-up of workers working beside the propeller shaft beneath an Eagle Boat within the Ford Rouge Factory Complex, as taken from near its stern. The threaded end of the shaft is awaiting installation of propeller. A portion of the rudder is also visible. The caption, "Propeller shaft in place." is on the verso. Lower right hand corner of photo has number and date of photo: 22585-7-05-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers constructing the keel of Eagle Boat No. 8 within the Ford Rouge Factory Complex. Another Eagle Boat is under construction in the background. Lower right hand corner shows photo number and date of photo: 22437-6-13-18 with a number (8) above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime