Search Constraints
« Previous |
291 - 300 of 772
|
Next »
Search Results
- Description:
- Sepia-toned photograph depicting and elevated view of the Eagle Boat assembly line within the Ford River Rouge Complex. Eagle Boat No. 2 is under construction in the background. Workers assemble a keel in the middleground. Additional material is staged on the floor in the foreground. Lower right hand corner shows photo number and date of photo: 22249-5-29-18 with a number 5 above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting Eagle Boat No. 1 backing out of its construction bay at Building "B" to the Transfer Bed at the Ford Rouge Factory Complex, as taken off of its starboard quarter. The boat is almost clear of the building. A transfer-tug is moving the boat. A U.S flag is flown from its stern. "Eagle-1" is painted on the stern. Spectators and U.S. Navy personnel are shown. The caption "Eagle is drawn unto transfer table," is on the verso. Lower right hand corner of photo has number and date of photo: 22621-7-11-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the output side of an Eagle Boat engine positioned on a stand. These engines were manufactured at Ford Highland Park Plant and then transported to the Ford River Rouge Factory. Two men are seen in the background holding up a large white sheet to aid in photo contrast. Lower right hand corner of photo has number and date of photo: 22998-9-12-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of a close-up of workers attaching plates to the hull of an Eagle Boat at the Ford River Rouge Complex. The photo is captioned, "Jigs are set and bottom plating continues," on the verso. Lower right hand corner shows photo number and date of photo: 22222-5-27-18. Has a number 4 written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the portside bow of Eagle Boat No. 6, under construction within the Ford Rouge Factory Complex. An overhead crane moves bulkhead framing into place. Workers are visible. Lower right hand corner shows photo number and date of photo: 22475-6-18-18 has number (6) written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the elevator launch and pit at the at the Ford Rouge Factory Complex. View of Elevator Launch and Pit. The elevator construction is now complete, and water is being pumped from the Rouge River through a long pipe to fill the pit. When filled, the earthen berm separating the pit from the river will be removed. A rail-mounted crane with its boom extended is near the launch tower. Lower right hand corner of photo has number and date of photo: 22651-7-08-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers excavating between large beams that support the launch elevator within the Eagle Boat launch pit at the Ford Rouge Factory Complex. Hand saws, sledge hammer and other hand tools are shown. Lower right hand corner of photo has number and date of photo: 22611-7-08-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the manufacturing of the pattern Eagle Boat at the Ford Highland Park Factory, as viewed from a point above its stern looking toward its bow. This pattern boat was later dismantled and used as a template for Eagle Boats to be manufactured at Ford's River Rouge Complex. The caption, "Study or test hull complete. (later dismantled)," is on the verso. Lower left hand corner of photo has number and date of photo: 22687-7-18-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-Toned photograph depicting workers assembling a keel in the construction of an Eagle Boat inside the Ford River Rouge Complex. The right edge of photo shows an open-cab truck with canvas sides. Lower right hand corner shows photo number and date of photo: 22199-5-23-18 with a 3 above of the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers attaching Plates to Eagle Boat No. 3 within the Ford Rouge Factory Complex. The workers standing on ladders and elevated platforms to rivet. The stern of another Eagle Boat is being manufactured in the background. The caption "Last plates at bow," is printed on the verso. Lower right hand corner of photo has number and date of photo: 22657-7-08-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime