Search Constraints
« Previous |
291 - 300 of 389
|
Next »
Search Results
- Description:
- Sepia-Toned photograph depicting interior view of the Ford River Rouge Complex. Shows view of metal frabricating shop. Heavy duty machinery. Shows steel plates ready to be modified. Shows tool crib against a wall. Time- clock with time cards in rack visable in background. Verso: "Punching shell plates preparatory to construction of first hull." Lower right hand corner shows photo number and date of photo: 21989-5-04-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of showing progress made on the construction of the hull of Eagle Boat No. 41 within building "B" of the Ford River Rouge Factory Complex, as taken from above its port quarter. The transom, propeller shaft tunnel, and several stringers and bulkheads are in place. "25830-2-17-19, #43" is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting and elevated view of the Eagle Boat assembly line within the Ford River Rouge Complex. Eagle Boat No. 2 is under construction in the background. Workers assemble a keel in the middleground. Additional material is staged on the floor in the foreground. Lower right hand corner shows photo number and date of photo: 22249-5-29-18 with a number 5 above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting Eagle Boat No. 1 backing out of its construction bay at Building "B" to the Transfer Bed at the Ford Rouge Factory Complex, as taken off of its starboard quarter. The boat is almost clear of the building. A transfer-tug is moving the boat. A U.S flag is flown from its stern. "Eagle-1" is painted on the stern. Spectators and U.S. Navy personnel are shown. The caption "Eagle is drawn unto transfer table," is on the verso. Lower right hand corner of photo has number and date of photo: 22621-7-11-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the output side of an Eagle Boat engine positioned on a stand. These engines were manufactured at Ford Highland Park Plant and then transported to the Ford River Rouge Factory. Two men are seen in the background holding up a large white sheet to aid in photo contrast. Lower right hand corner of photo has number and date of photo: 22998-9-12-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of a close-up of workers attaching plates to the hull of an Eagle Boat at the Ford River Rouge Complex. The photo is captioned, "Jigs are set and bottom plating continues," on the verso. Lower right hand corner shows photo number and date of photo: 22222-5-27-18. Has a number 4 written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the portside bow of Eagle Boat No. 6, under construction within the Ford Rouge Factory Complex. An overhead crane moves bulkhead framing into place. Workers are visible. Lower right hand corner shows photo number and date of photo: 22475-6-18-18 has number (6) written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the elevator launch and pit at the at the Ford Rouge Factory Complex. View of Elevator Launch and Pit. The elevator construction is now complete, and water is being pumped from the Rouge River through a long pipe to fill the pit. When filled, the earthen berm separating the pit from the river will be removed. A rail-mounted crane with its boom extended is near the launch tower. Lower right hand corner of photo has number and date of photo: 22651-7-08-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers excavating between large beams that support the launch elevator within the Eagle Boat launch pit at the Ford Rouge Factory Complex. Hand saws, sledge hammer and other hand tools are shown. Lower right hand corner of photo has number and date of photo: 22611-7-08-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the manufacturing of the pattern Eagle Boat at the Ford Highland Park Factory, as viewed from a point above its stern looking toward its bow. This pattern boat was later dismantled and used as a template for Eagle Boats to be manufactured at Ford's River Rouge Complex. The caption, "Study or test hull complete. (later dismantled)," is on the verso. Lower left hand corner of photo has number and date of photo: 22687-7-18-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime