Search Constraints
« Previous |
101 - 200 of 813
|
Next »
Search Results
- Description:
- Sepia-toned photograph depicting several machines, mounted on rails, used to install the propeller drive shaft, beneath an Eagle Boat within the Ford Rouge Factory Complex, as taken below its port quarter. Lower right hand corner of photo has number and date of photo: 22583-7-03-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers installing plates, frames, and bulkheads onto the keel of Eagle Boat No. 5 within the Ford Rouge Factory Complex. The caption "First frames are set in place" is printed on the verso. Lower right hand corner shows photo number and date of photo: 22434-6-13-18 with a number (5) above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers attaching plates to the keel of Eagle Boat No. 3 at the Ford River Rouge Complex. The photo is captioned "Hull grows" on the verso. Lower right hand corner shows photo number and date of photo: 22221-5-27-18. Has a number 3 written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting a portside view of the completed hull of Eagle Boat No. 1 at the Ford Rouge Factory Complex. Workers are on scaffolding along the side of the boat. Wooden stairs connect the scaffolding to rail flatcar decking. The caption, "Competed hull," is on the verso. Lower right hand corner shows photo number and date of photo: 22493-6-22-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of workers beginning to plate the hull of Eagle Boat No. 44 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. Several plates have been installed near the boat's bow through the combined efforts of a group of workers on the boat's carriage and the overhead crane. Meanwhile another group of workers begins the construction of a keel for another Eagle Boat on the left. Yet another Eagle Boat is under construction in the background. Coat racks, shelves, and piles of materials are along the wall on the right. "#44 12:42 A.M. 25866-2-20-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken overlooking stacks of barrels of rivets within building "B" of the Ford River Rouge Factory Complex, as taken from on deck of an Eagle Boat under construction in the building. Four other Eagle Boats are also under construction in adjacent aisles in the background. "27141-7-8-19," is printed in the lower right corner of the recto, and "Rivets," and "13," are handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers installing frames and plates onto the hull for Eagle Boat No. 3, viewed from overhead off of its starboard bow, within the Ford River Rouge Complex. An overhead crane is visible in the background. Additional plates and material are laying on floor. Eagle Boat No. 2 is visible in the background in another bay. Lower right hand corner shows photo number and date of photo: 22285-6-03-18 with a number 3 written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting a crane and steam shovel involved in excavating and foundation work for the Ford River Rouge Complex. Teams of horses and Hulett Cranes are visible in the background. Workers appear to be on a lunch break. Lower right hand corner shows photo number and date of photo: 22291-6-03-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of a completed Eagle Boat being rolled along the tracks of the transfer table to launched at the Ford River Rouge Factory Complex, taken from off of its port bow. The boat has been dressed with its signal flags, and draped with banners, and an American flag at its bow. Uniformed naval personnel stand on the boat's deck. Spectators are gathered on the ground below. "27533-8-15-19," is printed in the lower right corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing the construction of the Ford River Rouge development Building "B" and grounds. A steam driven pile driver sets the foundation in the foreground. Men are present. Cranes set the steel framing for Building "B" in the background. Verso: "Pilings are driven for elevator foundation work." Lower right hand corner shows photo number and date of photo: 22037-5-08-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers, atop ladders and elevated platforms, riveting plates to the port side of Eagle Boat No. 4 within the Ford River Rouge Complex. An overhead crane, with operator, is stationed above the stern. Another Eagle Boat is in the background with scaffolding in place. The caption, "Last bilge plate," is printed on the verso. Lower right hand corner of photo has number and date of photo: 22658-7-08-18 with a (4) written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken overlooking the Rouge River and the launch elevator of the Ford River Rouge Factory Complex. Building "B" is visible in the background in the early stages of its construction. Lower right hand corner of photo has number and date of photo: 22834-8-16-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59, within building "B" of the Ford River Rouge Factory Complex, as viewed from above the boat's port bow. Workers on scaffolds rivet the hull's plates, while men on top of the framing appear ready to install decking. The time of photo is 3:00 pm. Lower left hand corner show number and date of photo: 26317-04-03-19 with a #59 and 3:00 pm written above. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken along the railroad tracks which run through a newly created gap through what was previously a single building at the Ford River Rouge Factory Complex. A kneeling worker inspects a switch along the tracks, while another works on the windows overlooking the left side of the gap from a ladder. "27033-6-23-19," is printed in the lower right corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59, within building "B" of the Ford River Rouge Factory Complex, as viewed from above the boat's stern. Workers prepare the framing for the decking. "59," is stenciled on the stern, and interior work lights are in use. The time of photo is 3:30 pm. Lower left hand corner show number and date of photo: 26319-04-03-19 with a #59 and 3:30 pm written above. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken overlooking construction at the Ford Rouge Factory Complex grounds. In the foreground workers setting rails in place. Beyond them workers dig a trench beside the tranfer table foundatation. Lower right hand corner shows photo number and date of photo: 22479-6-18-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the manufacture of Eagle Boat No. 3 within the the Ford Rouge Factory Complex, as viewed from of its starboard bow. A Worker rivites a plate to the side beside the bow. Work also progresses on its upper plating. A worker stands on a mobile work station in the background on the left. Several other workers are also present. A number 3 is painted on the keel. The caption, "2nd row of plates nearing completion," is printed on the verso. Lower right hand corner shows photo number and date of photo: 22529-6-26-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia toned photographic showing the front side of the Ford Motor Company Highland Park Plant, taken in 1911 by N. Lazarnick. The photograph is mounted on a grey paper backing, which features an orange border near its edge.
- Date Issued:
- 1911-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Automotive: Industrial
- Description:
- Sepia-toned photograph of workers installing the framing on the keel for Eagle Boat No. 38 near its stern, within building "B" of the Ford River Rouge Factory Complex, as taken from above its port quarter. Several stringers and bulkheads are already in place. Shelves of materials, coat racks, and carts are visible in the adjacent aisles. "25608-2-1-19, #38" is printed in the lower left corner of the recto, and "5C2," is handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the manufacture of Eagle Boat No. 2 at the Ford Rouge Factory Complex as viewed from off its starboard bow. Much of the framing, bulkheads, and plating are completed. Workers are present. Material is staged and stored on the floor. The caption, "Hull growing," is on the verso. Lower right hand corner shows photo number and date of photo: 22480-6-18-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Color postcard depicting the Ford plant in Highland Park and thousands of employees standing in front. A water tower and "Ford Motor Company" sign are visible. Handwritten message on verso reads, postmarked Jan 17, 1916.
- Date Issued:
- 1916-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Postcard
- Description:
- Black and white photographic postcard showing aerial view of the Ford Rouge complex. Printed on verso: THE ROUGE PLANT is one of the largest industrial centers in the world. It has an area of 1,906 acres, 14 miles of roadways, 92 miles of railway track and 1 1/3 miles of docks. It includes blast furnaces, open hearth and steel mill, glass plant, foundry, paper mill, cement plant, body plant, coke ovens, power plant and motor assembly plant where new Model A engines are built. Printed by The Garraway Company, Rutherford, New Jersey.
- Data Provider:
- Detroit Historical Society
- Collection:
- Postcard
- Description:
- Press release from the Committee on Public Information, dated March 17, 1918, concerning the history of the name chosen for the Eagle Boats, built by the Ford Motor Company for World War I. The document lists past vessels named EAGLE which took part in conflicts ranging from the Revolutionary War to the Spanish-American War.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Color postcard depicting the Ford plant in Highland Park with hundreds of chassis visible in front. Handwritten message on verso, postmarked Jul 18, 1916.
- Date Issued:
- 1916-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Postcard
- Description:
- Sepia-toned photograph depicting workers attaching plating to the keel and frame of an Eagle Boat inside the Ford River Rouge Complex. An overhead crane is visible. Lower right hand corner shows photo number and date of photo: 22197-5-23-18 with a 1 above of the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned panoramic group portrait of twenty-six Ford Motor Company employees posed beside a house on a lake. "October 6 and 7, 1923," is printed beneath the group in the center of the photo. "Macgregor and Vallin, Detroit," is embossed near the lower right.
- Date Issued:
- 1923-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Automotive: Industrial
- Description:
- Sepia-toned photograph depicting Eagle Boat turbine engine components staged on the floor at the Highland Park Factory. Machines line both walls of the long narrow room. Workers are present performing various tasks. These engines were manufactured for Ford's Eagle Boats being produced at Ford's River Rouge Complex. The engines produced 2,500 hp. Lower right hand corner show number and date of photo: 23421-10-21-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers assembling the keel of an Eagle Boat at the Ford River Rouge Complex. Another Eagle Boat, with its framing installed, is under construction in the background. An overhead crane is visible. Lower right hand corner shows photo number and date of photo: 22200-5-23-18. Has a number 4 written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of progress made in the construction of Eagle Boat No. 44 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. Workers on ladders and perched atop pieces of the frame position the framing near the bow, as an overhead crane lowers the bulkheads into place near the stern. Another Eagle Boat is under construction in the background. Shelves and crates of materials are in the adjacent aisle on the left, and coat racks, shelves, and piles of materials are along the wall on the right. "#44 9:32 A.M. 25863-2-20-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers assembling plates on the keel in the construction of an Eagle Boat within the Ford River Rouge Complex, as a uniformed Navy officer looks on. Material is staged on the floor. An overhead crane can be seen in background. Verso: "and grows." Lower right hand corner shows photo number and date of photo: 22122-5-11-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken of an unused aisle within building "B" of the Ford River Rouge Factory Complex. Tracks run along the center of the aisle. Metal plates are leaned inside of bins along the sides of the aisle. A group of people are gathered in the aisle in the distance. Hats and lunch boxes are stored atop a coat rack behind one of the bins on the left. In the background on the left, Eagle Boat No. 54 is under construction in the adjacent aisle. Its starboard quarter is to the camera. Scaffolding surrounds its hull, and a worker stands on its deck. Another Eagle Boat is positioned ahead of No. 54 in the same aisle. 26780-5-29-19," is printed in the lower right corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing the exterior of a factory building at the Ford Motor Company River Rouge development with Pennsylvania Lines railroad cars loaded with material in the foreground. The factory is of brick and glass construction. Workers are working on the building and are off loading material onto trailers in the background. Lower right hand corner shows photo number and date of photo: 22001-5-4-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Black and white photograph taken overlooking work to convert building "B" of the Ford River Rouge Factory Complex from manufacture of Eagle Boats to that of automobiles. Workers fill in the strips along the center of the aisles where the tracks that supported the boat's carriages ran, so that they can be replaced with tracks for automotive assembly lines. Piles of dirt and wood run along the open strips. "26782-5-27-19," is printed in the lower right corner of the recto, and "3C-2," is handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting Eagle Boat No. 1 being outfitted while docked at the Ford River Rouge Factory Complex. Workers are on deck of the boat. A mobile rail-mounted crane is positioned next to the boat. Other workers are visible in background. Lower right hand corner of photo has number and date of photo: 22692-7-18-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing the interior of a metal fabricating shop within a factory building at the Ford Motor Company's River Rouge development. Workers are visible at the machines. The foreground shows a large fire box and metal laying on wooden floor. Lower right hand corner shows photo number and date of photo: 22025-5-8-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59, within building "B" of the Ford River Rouge Factory Complex, of workers installing the boat's deck fixtures as viewed from about its starboard quarter, facing toward the bow. Cowl vents, davits, and some of the cabin structure are in place. "#59, 26374-04-07-19," is printed in the lower right corner of the recto and "8A15," is handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing the interior of Building B of the Ford Motor Company's River Rouge development containing an Eagle Boat in stocks with bracing upon rails. The boat's port side is show from its bow. A worker on a ladder installs plates. Its keel is marked with the number 4. Lower right hand corner shows photo number and date of photo: 22348-6-10-18 the number 4 appears above the date. Photo mounted on a linen backing with flap on left side with holes for binding.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the manufacture of the pattern Eagle Boat at the Ford Highland Park Factory, as viewed from a point above its bow, facing toward its stern. The boat appears near completion. A lifeboat is at the lower left. This pattern boat was later dismantled and used as a template for Eagle Boats to be manufactured at Ford's River Rouge Complex. The caption, "First study-model Eagle built at Ford Highland Park plant," is on the verso. Lower left hand corner of photo has number and date of photo: 22688-7-18-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting framing and plating being installed on the keel of Eagle Boat No. 3 within the Ford Rouge Factory Complex. A worker stands in the foreground on the left, and several others are visible beyond, beside the hull. Men present. Verso: "First row plates complete". Lower right hand corner shows photo number and date of photo: 22432-6-13-18 with a (3) over the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59, of the boat completed and on the launch elevator at the Ford River Rouge Factory Complex, as viewed from off its port bow. A sign posted on the side of the boat reads, "Eagle No. 59, World Record, Built in 10 Days." "26404-04-12-19," is printed in the lower right corner of the recto and "'Ten Day' ship on launching elevator ready to be lowered into water," is typewritten on a strip of paper affixed to the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken of an Eagle Boat at the Ford River Rouge Factory Complex's outfitting dock, as taken from across the water off of its starboard side. The boat appears nearly complete. Painters on suspended scaffolding are finishing their work. Both workers and U.S. Navy personnel are visible aboard. Lower right hand corner show number and date of photo: 23483-10-30-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting manufacture of an large spline gear assembly for a driveshaft at the Ford Rouge Factory Complex, possibly used for an Eagle Boat or for the elevator system used to launch them. The gears are shown with a portion of the housing removed. Lower right hand corner shows photo number and date of photo: 22481-6-19-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing the steel framing structure of the assembly building, under construction at the Ford River Rouge development. Workers are present. Verso: "Framing complete." Lower right hand corner shows photo number and date of photo: 22072-5-11-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Black and white photograph of a close-up of the Eagle Boat launch pit and elevators at the Ford Rouge Factory Complex. Wooden support beams are in place in the pit. Workers are present. The caption, "Detail of elevator," is on the verso. Lower right hand corner of photo has number and date of photo: 22607-7-08-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the steam powered Eagle Boat Turbine engine housing staged on the floor in front of metal mills within the Ford Highland Park Factory. Above the mills are chain-hoists used to lift the housing onto the mill. A large gear in a wooden block is in the foreground on the right. Lower right hand corner of photo has number and date of photo: 22946-9-03-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting manufacture of Eagle Boat No. 1 at the Ford Rouge Factory Complex as viewed from of its port quarter. Bracing is supporting the hull, which appears nearly completed. Men are shown working on the deck. The chart house is visible on deck. Lower right hand corner shows photo number and date of photo: 22527-6-26-18 with a number (1) written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the view of the first Eagle Boat backing out of it's construction bay as taken from the interior of Building "B" looking toward the Transfer Table off of the boat's bow. Many spectators are outside for the launch of the first Eagle Boat. Lower right hand corner of photo has number and date of photo: 22616-7-11-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the manufacture of the Eagle Pattern Boat at the Ford Highland Park Factory, as viewed from a point above its stern facing forward. An attached gangway is visible along the boat's port side near the bottom edge of the frame. The pattern boat was disassembled and taken to the Ford River Rouge Factory where each piece was used as template for manufacturing other Eagle Boats. A total of 60 Eagle Boats were built. Lower left hand corner of photo has number and date of photo: 22818-8-14-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken of a large dial display within the room housing the hydraulic elevator machinery at the River Rouge Factory Complex. The large dial has four needles, and a scale that runs from 0 to 27, likely representing the displacement of the elevator in feet. A bell, a series of four numbered lights, and a small pressure gauge are located beneath the large dial display. A series of pipes and valves are in the foreground. "26399-04-11[?]-19," is printed in the lower right corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the upper plates being installed on Hull Eagle Boat No. 3, as taken from off its starboard quarter, within the Ford Rouge Factory Complex. An overhead crane is positioned above the hull. The caption "And growing" is on the verso. Lower right hand corner shows photo number and date of photo: 22496-6-22-18 with a number (3) written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of progress made in the construction of Eagle Boat No. 44 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. Workers on ladders and perched atop pieces of the frame position struts spanning several pieces of framing near the bow, as workers guide bulkheads suspended from the overhead crane into position near the stern. Another Eagle Boat is under construction in the background. Shelves and crates of materials are in the adjacent aisle on the left, and coat racks, shelves, and piles of materials are along the wall on the right. "#44 10:32 A.M. 25864-2-20-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the keel for Eagle Boat No. 8, as well as another Eagle Boat under construction in the background, within the Ford Rouge Factory Complex. Material and supplies are staged and stored on the floor in the foreground. Lower right hand corner shows photo number and date of photo: 22500-6-22-18 with a number (8) written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing the framework of factory while under construction. Three cranes are shown; one is setting trusses. Workers are present. The name on side of crane reads, "American Bridge Company." The lean-to section of factory is shown. Lower right hand corner shows photo number and date of photo: 22075-5-11-18. Time of photo taken: Noon. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of a worker and a large pump on a cart inside the flooded outfitting building at the Ford River Rouge Factory Complex. The pump's suction pipe is submerged. Lower right hand corner show number and date of photo: 26176-03-17-19. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of a completed Eagle Boat in the launch elevator of the Ford River Rouge Factory Complex having just been lowered into the Rouge River, as viewed from the water off of its port quarter. The boat has been dressed with its signal flags, and draped with banners. The towers of the launch elevator have also been draped with banners. Uniformed naval personnel stand on the boat's deck, and spectators watch from a walk way beside the elevator. "27539-8-15-19," is printed in the lower right corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the interior of a long low wooden building at the Ford Rouge Factory Complex. Rails run along concrete piers along the center of the building. A wooden job-site work box is shown in the foreground. The left side of the building has moveable doors that run entire length of the building. Workers assemble panels in the background. Metal panels are staged on the floor. Lower right hand corner shows photo number and date of photo: 22567-7-02-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the transportation of workers for the Ford River Rouge Complex. Three open Ford Model T depot hack trucks, each pulling an open trailer, are being used to transport workers to the job site. Each truck and trailer has canvas top with rolled-up canvas sides. Shows men sitting on benches. Several men pose along side the vehicles. The top of a brick farmhouse can be seen in background. Photo taken on Miller Road. Lower right hand corner shows photo number and date of photo: 22263-5-31-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph a carriage on rails on the Eagle Boat assembly line with the hull of Eagle Boat No. 9 being plated in the background, within the Ford Rouge Factory Complex. Workers are present. Plates are stored on the floor in the foreground. Lower right hand corner shows photo number and date of photo: 22478-6-18-18 has number (9) written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting a completed Eagle Boat hull approaching the launch elevator and the elevator pit at the Ford River Rouge Factory Complex. Workers and spectators are observing the process. In the background, Hulett Cranes are seen towering over the Rouge River. A dredge is in the river in the background. After launching, the boat will be moved to the outfitting station also located on the Rouge River. Lower right hand corner of photo has number and date of photo: 22856-8-19-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59. Workers inside of the hull install plates, rivet, and space the framing, within building "B" of the Ford River Rouge Factory Complex, as viewed from above the boat's stern. The time of photo is 1:30 pm. Lower left hand corner show number and date of photo: 26300-04-02-19 with a #59 and 1:30 pm written above. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph a close-up of the Eagle Boat launch pit at the Ford Rouge Factory Complex. Workers remove wooden foundation forms. Lower right hand corner of photo has number and date of photo: 22609-7-08-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of the starboard of a completed Eagle Boat, on the Rouge River, following its launch from the Ford River Rouge Factory Complex. Men on board near the stern are taking down the boat's dressing of signal flags, and the banners draped along its side has been partially removed. A series of large silos, a smoke stack, and the frame of a building under construction are visible at the complex in the background. "27535-8-15-19," is printed in the lower right corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers digging a trench and a pile driver setting wooden posts in place during the construction of Ford Rouge Factory Complex. The steel work for Building "B" is being erected in background. Cranes and rail cars are visible in the background. Lower right hand corner shows photo number and date of photo: 21998-5-04-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting a crane mounted on a railcar and workers working on excavation and foundations for the elevators used to launch the Eagle Boats at the Ford Rouge Factory Complex. A steam shovel is at work in background. Verso: "Concrete elevator piers are built as pit excavation is deepened". Lower right hand corner shows photo number and date of photo: 22462-6-18-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of a close-up of workers working beside the propeller shaft beneath an Eagle Boat within the Ford Rouge Factory Complex, as taken from near its stern. The threaded end of the shaft is awaiting installation of propeller. A portion of the rudder is also visible. The caption, "Propeller shaft in place." is on the verso. Lower right hand corner of photo has number and date of photo: 22585-7-05-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting two cranes with clam buckets mounted on railcars and workers working on excavation and foundations for the elevators used to launch the Eagle Boats at the Ford Rouge Factory Complex. A steam shovel at work on the left. Several concrete piers are nearly completed. The caption "Digging continues" is on the verso. Lower right hand corner shows photo number and date of photo: 22463-6-18-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers constructing the keel of Eagle Boat No. 8 within the Ford Rouge Factory Complex. Another Eagle Boat is under construction in the background. Lower right hand corner shows photo number and date of photo: 22437-6-13-18 with a number (8) above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting Eagle Boats No. 2, 3, 4, 5, 6, and 7 at the Ford River Rouge Factory Complex's outfitting dock. Eagle Boat No. 2 has a different paint scheme than the others. A small winch-powered ferry is seen at the Bow of Eagle No. 2. The cable is barely visible in the river. Lower right hand corner show number and date of photo: 23423-10-19-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of progress made in the plating of the hull of Eagle Boat No. 44 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. A strip of plates have been installed along the boat's starboard side. The overhead crane is being used to lower a bulkhead near the boat's midsection. Meanwhile another group of workers is constructing a keel for another Eagle Boat on the left. Yet another Eagle Boat is under construction in the background. Coat racks, shelves, and piles of materials are along the wall on the right. "#44 1:42 A.M. 25867-2-20-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers laying the keel for Eagle Boat No. 8 within the Ford Rouge Factory Complex. A large wagon is positioned beside the keel. A coat rack is visible to the right of the center. Another Eagle Boat is being plated in the background. Lower right hand corner shows photo number and date of photo: 22477-6-18-18 has number (8) written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the manufacture of an Eagle Boat within the Ford Rouge Factory Complex, as taken off of its port quarter. Several machines, mounted on rails, used to install the propeller drive shaft are beneath the boat. Make-shift scaffolding is suspended from the stern. Ladders and a mobile work platform are along the boats port side. The caption "After deck house complete, machine places shaft thru stern tube," is on the verso. Lower right hand corner of photo has number and date of photo: 22584-7-03-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting a completed Eagle Boat hull being lowered into the water by the launch elevator while spectators observe from the Launch Control Building of the Ford River Rouge Factory Complex, as taken off of the boat's port bow. Workers and Navy personnel are present. Lower right hand corner of photo has number and date of photo: 22861-8-19-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the manufacture of Eagle Boats No. 2 within the Ford Rouge Factory Complex, as viewed from off its starboard side. Scaffolding attached to the side of the boat, and workers attach its upper plating. A small car loaded with plates is in the foreground. Lower right hand corner shows photo number and date of photo: 22528-6-26-18 with a number (2) written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Black and white photograph from a glass plate negative of Monroe Street. Pedestrians are seen walking across the streets, some are waiting for a street car; a horse carriage and automobile are parked adjacent to the Hotel Fowler in the right foreground. Central Billiard Parlor is adjacent to the intersection of Woodward Avenue and Monroe Street. The Temple Theatre is visible at the intersection of Monroe and Woodward; next to the billiard parlor and American Express Company. A Ford Motor Company Billboard is affixed to the top of the Monroe Block advertising, "To the Temple... Watch the Fords Go By!" Crowley Milner Company is visible in the background, further down Monroe. Written on the verso, "North side 1st block Monroe Ave., from Soldiers Monument, April 1910."
- Date Issued:
- 1910-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Detroit Views
- Description:
- Sepia-toned photograph showing an elevated view of rail cars off loading material inside Ford River Rouge Complex Building "B," during its construction. Workers are present. Lower right hand corner shows photo number and date of photo: 22107-5-16-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Black and white photograph taken overlooking work to convert building "B" of the Ford River Rouge Factory Complex from manufacture of Eagle Boats to that of automobiles. The strip at the center of the photo, in one of the outer aisles of the building, has been mostly filled with dirt, with regularly spaced divots left in it. The adjacent strips visible in the background on the right, are still being filled in. A worker driving a tractor pulls a trailer carrying wooden boxes, one of which is being handled by another worker. "26784-5-27-19," is printed in the lower right corner of the recto, and "3C-3," is handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of progress made plating the hull of Eagle Boat No. 43 within building "B" of the Ford River Rouge Factory Complex, as taken from above its port bow. Several plates have been applied at the bow, as well as in a strip along its side. Workers are gathered beside the boat. Another Eagle Boat is under construction in the background. Pieces of framing are piled along the wall on the left. "25835-2-18-19, #43" is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Black and white photograph depicting the Ford Motor Company center assembly line for World War I Eagle Boats at Building B in the company's River Rouge development. There is a keel being laid in foreground. In the background a partially completed Eagle Boat hull is visible. Several workers are also in the scene. Lower right hand corner shows photo number and date of photo: 22663-7-8-18. Photo mounted on a linen backing with flap on left side with holes for binding.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of the installation of the bow section to the hull of Eagle Boat No. 44 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. The bow plates are suspended from the overhead crane, and ladders are leaned against the section. A worker is seated on a board spanning several pieces of framing along the boat's starboard side. A group of workers are constructing a keel for another Eagle Boat on the left. Yet another Eagle Boat is under construction in the background. Coat racks, shelves, and piles of materials are along the wall on the right. "#44 2:42 P.M. 25868-2-20-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of a bent stabilizer fin on the port side of an Eagle Boat, supported on the assembly line carriage within building "B" of the Ford River Rouge Factory Complex, as viewed facing toward its stern. "Boat #6" has been written on the side of the hull. The pneumatic hose couplers on the floor beneath the assembly line's rails are visible. Scaffolding stands beside the boat on the right side of the frame. "27390-7-31-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken overlooking a room containing Eagle Boat steam turbine engine parts staged on floor for assembly at the Ford Highland Park Factory. Windows like the wall on the right, and the short wall at the end of the room in the background. On the left wall is a row of metal mills. On the right wall, work benches with attached vises are shown. Lower right hand corner of photo has number and date of photo: 22945-9-03-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken of the interior of the flooded outfitting building at the Ford River Rouge Workers in boots are standing in ankle-deep water. Stockpiled parts hung on the walls. Lower right hand corner show number and date of photo: 26170-03-17-19. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the interior of the Elevator Control Building at the Ford River Rouge Complex. This machinery is used to control the elevators used in launching the Eagle Boats. The caption, "Interior of elevator-control building," is printed on the verso. Lower right hand corner of photo has number and date of photo: 22643-7-16-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of workers beginning to attach plates to the side of Eagle Boat No. 45 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. A group of workers position a plate suspended by the overhead crane near the boat's bow. Workers continue to attach the framing near the boat's midsection. Another Eagle Boat is being plated in the background. A large piece of plating leans against a column on the right. Shelves and crates of materials, and a tool crib are visible in the adjacent aisle to the right."#45 12:46 P.M. 25859-2-20-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the port side of Eagle Boat No. 5 within the Ford Rouge Factory Complex. Workers have installed the bulkheads, framing, and one row of plates. Mobile elevated platforms are on the right side of the image along with materials are staged for use. Workers are present. The caption, "Stem in place, 2nd row plates being attached." is on the verso. Lower right hand corner of photo has number and date of photo: 22659-7-08-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers completing the keel of an Eagle Boat within the Ford Rouge Factory Complex. Another Eagle Boat is under construction in the background. The caption, "Keel complete, ready for first plates," is on the verso. Lower right hand corner shows photo number and date of photo: 22436-6-13-18 with a number (7) above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of the workers beginning to rivet plating on the side of the complete frame for Eagle Boat No. 43 within building "B" of the Ford River Rouge Factory Complex, as taken from above its port bow. The photo has been labeled with a "1" on one of the bulkheads near the bow. Another Eagle Boat is under construction in the background. Pieces of framing are piled along the wall on the left. "25831-2-17-19, #43" is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of progress attaching the framing and bulkheads to the keel of Eagle Boat No. 45 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. Workers standing on the boat's carriage position a frame near the bow, as a group of workers work near the boat's midsection on its port side work from atop a board spanning the top of several frame pieces. Another Eagle Boat is being plated in the background. A large piece of plating leans against a column on the right. Shelves and crates of materials, and a tool crib are visible in the adjacent aisle to the right."#45 11:46 A.M. 25858-2-20-19," is printed in the lower left corner of the recto, and "framing at bow nearing completion," is handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting Eagle Boat No. 1 backing out of its construction bay at Building "B" to the transfer bed at the Ford Rouge Factory Complex, as viewed from off its port side. The transfer-tug has cleared the boat from the building and is positioning it for travel to the Launch Elevators. A U.S flag is being flown from its stern. Spectators and U.S. Navy personnel are shown. Lower right hand corner of photo has number and date of photo: 22622-7-11-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59, within building "B" of the Ford River Rouge Factory Complex, as viewed from above the boat's port bow. Workers on scaffolds rivet the hull's plates, while other workers installing Bilge Plates. Two more rows of plating remain to be installed. A sign posted on the boat's bow reads, "The Worlds Record for Boat Building and Launching is 14 Days Held by Great Lakes Engineering Co., Target for Ford Eagle Builders: 10 Days, CAN WE BEAT IT?" The time of photo is 3:00 pm. Lower left hand corner show number and date of photo: 26318-04-03-19 with a #59 and 3:00 pm written above. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers assembling pre-fab panels on a long low building next to the Rouge River at the Ford River Rouge Complex. Rail track run through the foreground. A Hulett crane is in the background. Building "B" is on the right. Lower right hand corner shows photo number and date of photo: 22289-6-03-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken of a starboard quarter of a Eagle Boat parade float, believed to have been built at the Ford River Rouge Factory Complex. The mast is laying flat on the rear deck. Painted canvas hangs from the hull simulating waves. The Boat is stored in a warehouse building. Lower right hand corner show number and date of photo: 23866-12-02-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the Eagle Boat Engine testing station at the Ford Highland Park Factory. An operator poses beside the controls. A large shaft is running from the engine turbine to what appears to be generator in the background. Electrical type gauges attached to a panel near the generator are in view. Overhead chain-hoists are visible. Each Eagle Boat engine was tested before being transported to Ford's River Rouge Factory. Lower right hand corner of photo has number and date of photo: 22958-9-05-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of a close-up of the Eagle Boat launch pit at the Ford Rouge Eagle Boat Factory Complex. Large wooden beams and other foundation forms in place. The concrete floor and sides appear complete. The caption, "View from floor of near-complete pit," is on the verso. Lower right hand corner of photo has number and date of photo: 22612-7-08-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting a crane setting beams for a transfer table during the construction of the Ford River Rouge Complex. Workers are present. Background shows railcars with additional equipment and men working. Verso: "Rails in place, transfer table being constructed (center)." Lower right hand corner shows photo number and date of photo: 22171-5-21-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of Eagle Boat No. 1 at the Ford River Rouge Factory Complex's outfitting dock, taken from across the water off of its port side. The boat appears complete. Both workers and U.S. Navy personnel are visible aboard. The caption, "Ready to sail" is on the verso. Lower right hand corner show number and date of photo: 23432-10-22-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing Ford River Rouge Complex Building "B" nearing completion. Transfer bed rails are in the foreground. Workers are present. Lower right hand corner shows photo number and date of photo: 22106-5-16-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting a view overlooking of the grounds of the Ford Rouge Factory Complex taken from across the Rouge River. Building "B" is under construction on the right. A warehouse is next to the canal, and Hulett cranes are visible in the background to the left. Lower right hand corner shows photo number and date of photo: 22447-6-13-18. Photo mounted on a linen backing. Small crease in lower right corner of photo.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers attaching framing and bulkheads to the hull of Eagle Boat No. 5 within the Ford Rouge Factory Complex, as viewed off of the boat's starboard bow. Plates are staged on the floor and an overhead crane is visible. Lower right hand corner shows photo number and date of photo: 22474-6-18-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of the interior of the flooded outfitting building. A time card rack and time clock are on the right. Below, elevated boards allowing workers to access their time cards have been set up. Overalls hang from a the coat rack in the background on the left. Lower right hand corner show number and date of photo: 26175-03-17-19. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime