Search Constraints
« Previous |
1 - 100 of 398
|
Next »
Search Results
- Description:
- Sepia-toned photograph showing the interior of Building B of the Ford Motor Company's River Rouge development with an Eagle Boat, starboard quarter toward the camera, in stocks with bracing atop rails. A man works on the keel and hull. Keel has a large number 2 on it. Lower right hand corner shows photo number and date of photo: 22316-6-3-18. Photo mounted on a linen backing with flap on left side with holes for binding.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken of an unused aisle within building "B" of the Ford River Rouge Factory Complex. Tracks run along the center of the aisle. Metal plates are leaned inside of bins along the sides of the aisle. A man stands at the window of a tool crib further along the aisle. In the background on the right, two Eagle Boats are under construction in the adjacent aisle. Scaffolding surrounds the hull of the nearest one. "26781-5-27-19," is printed in the lower right corner of the recto, and "assembling components at site of construction," is handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the hull plates being attached to the port side of Eagle Boat No. 1 at the Ford River Rouge Complex as viewed from near its bow facing aft. The boat's framing is in place. Additional Plates are laying on floor. Several workers are visible. Lower right hand corner shows photo number and date of photo: 22245-5-29-18 with a number 1 above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of a close-up of an Eagle Boat propeller shaft and housing underneath an Eagle Boat being manufactured within the Ford Rouge Factory Complex. The bracing used to support the boat during construction is also visible. Lower right hand corner of photo has number and date of photo: 22654-7-08-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing the interior of a metal fabricating shop within a factory building at the Ford Motor Company's River Rouge development. Workers are visible at the machines. Foreground shows four men working with large sheet of metal. Lower right hand corner shows photo number and date of photo: 22026-5-8-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59, within building "B" of the Ford River Rouge Factory Complex, of workers installing the boat's deck fixtures as viewed from off its port bow. Workers atop the boat install the deck fixtures. Scaffolding surrounds the boat's hull. "Vote for wine and beer," has been written on part of the scaffolding beneath the boat's bow. Cables and hoses enter the boat's portholes, suggestive of the work going on inside. "#59, 26377-04-09-19," is printed in the lower right corner of the recto and "8A13, superstructure a-building" is handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing workers fabricating beam to be installed inside of the Ford River Rouge Complex Building "B," during its construction. Plate connectors are stored on floor in the foreground. Lower right hand corner shows photo number and date of photo: 22104-5-16-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the manufacture of Eagle Boat No. 2, in stocks and trucks, within the Ford Rouge Factory Complex. Scaffolding has been attached to the entire length of the port side. Material is staged for assembly in the foreground. Workers are also visible. Lower right hand corner of photo has number and date of photo: 22575-1-03-18 written above the date is the number (2).. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken of the interior of the room housing the hydraulic elevator machinery at the River Rouge Factory Complex. A series of pipes and valves are in the foreground on the left. A large room heating furnace and an electrical generator are on the right. "26396-04-11-19," is printed in the lower right corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing an Eagle Boat being outfitted within Building B of the Ford Motor Company's River Rouge development, as taken from above the boat's bow. Elevated bins line the corridor. The ship's wheelhouse is shown. Lower right hand corner shows photo number and date of photo: 22377-6-12-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of progress made plating the bow of the hull of Eagle Boat No. 39 within building "B" of the Ford River Rouge Factory Complex, as taken from above its port bow. Several plates have been applied at the bow. Blurred workers are busy on the floor beside the boat, as well as beneath its bow. Men work at desks on both the right and left sides of the aisle. Pieces of framing are piled along the wall on the left. "25635-2-3-19, #39" is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Black and white postcard depicting an assembly line in the Ford River Rouge factory. Printed on verso: AN ASSEMBLY LINE OF THE FORD MOTOR COMPANY. The assembly line is always a point of interest to visitors of the Rouge Plant. Here, on a moving conveyor, Ford cars are completely assembled, from chassis to finished car, and driven off the line under their own power. In addition to the Rouge Plant, there are 31 assembly lines in company branches throughout the United States. Printed by The Garraway Company, Rutherford, New Jersey.
- Data Provider:
- Detroit Historical Society
- Collection:
- Postcard
- Description:
- Sepia-toned photograph showing an Eagle Boat being outfitted within Building B of the Ford Motor Company's River Rouge development, as taken from above the boat's stern. Elevated bins line the corridor. The ship's wheel has been installed mid-ship. Lower right hand corner shows photo number and date of photo: 22376-6-12-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of showing progress made on the construction of the hull of Eagle Boat No. 41 within building "B" of the Ford River Rouge Factory Complex, as taken from above its port quarter. The transom, propeller shaft tunnel, and several stringers and bulkheads are in place. "25736-2-10-19, #41" is printed in the lower left corner of the recto, and "Framing complete at stern," is handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers attaching plates to the keel of an Eagle Boat within the Ford River Rouge Complex. A coat rack and an attached shelf holding lunch pails are visible. The caption, "Plating at Keel as seen from stern," is on the verso. Lower right hand corner shows photo number and date of photo: 22268-5-31-18 with a number 5 written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting close-up view of workers riveting a keel during the manufacture of an Eagle Boat inside of the Ford River Rouge development. A tool belt with tools is in the foreground. Another Eagle Boat under construction is in the background. Verso: "Detail of assembly." Lower right hand corner shows photo number and date of photo: 22170-5-21-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing men manufacturing a keel for an Eagle Boat on wooden platform mounted on rails inside of the Ford River Rouge development. Small carts are in the background loaded with material. Lower right hand corner shows photo number and date of photo: 22076-5-11-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of progress made in the construction of Eagle Boat No. 44 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. Workers are perched atop the struts across the frame pieces near the bow and boards spanning the tops of the frames near the boat's midsection. An overhead crane lowers one of the bulkheads into place near the stern. Another Eagle Boat is under construction in the background. Shelves and crates of materials are in the adjacent aisle on the left, and coat racks, shelves, and piles of materials are along the wall on the right. "#44 11:32 A.M. 25865-2-20-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting plates being attached to the keel of Eagle Boat No. 3, viewed from above looking bow to stern, at the Ford River Rouge Complex. Additional material is laying on floor. Workers are present. Lower right hand corner shows photo number and date of photo: 22247-5-29-18 with a number 3 above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59, within building "B" of the Ford River Rouge Factory Complex, as viewed from above the boat's port bow. Workers perched atop the hull are riveting and plating the deck. Scaffolding surrounds the sides of the hull. Lower left hand corner show number and date of photo: 26368-04-05-19 with a #59 written above. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers installing plating to a keel during the manufacture of an Eagle Boat inside of the Ford River Rouge development. The foreground worker holds a rivet gun. Lower right hand corner shows photo number and date of photo: 2168-5-21-18 with a number 1 written above.. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting a worker an elevated wooden platform attaching plates to the stern of an Eagle Boat at the Ford Rouge Factory Complex. Two elevated work stations are on the port side of boat. The caption, "Plating at stern," is on the verso. Lower right hand corner shows photo number and date of photo: 22473-6-18-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of progress made installing the bulkheads and framing on the keel of an Eagle Boat in one of the outer aisles of building "B" of the Ford River Rouge Factory Complex, as taken from above its port quarter. What appears to be a bench top riveter is on a stand atop the boat's propeller shaft tunnel. A group of workers are gathered beneath a ladder on the boat's port side. "25836-2-18-19" is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the manufacture of Eagle Boat No. 4 within the Ford Rouge Factory Complex, as viewed from off its port quarter. Scaffolding is suspended from its side. Workers in the background, toward its bow, stand on another scaffold. Another Eagle Boat is being constructed in the background on the right. The caption, "Last plates at Stern," is printed on the verso. Lower right hand corner shows photo number and date of photo: 22530-6-26-18 number (4) written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers laying the keel for an Eagle Boat within Ford River Rouge Complex Building "B." A box car is in background inside of the factory. Lower right hand corner shows photo number and date of photo: 22065-5-13-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting an elevated view of men working on the bottom plates of an Eagle Boat within Ford River Rouge Complex Building "B". Mobile work platforms are set up along the track. Lower right hand corner shows photo number and date of photo: 22110-5-16-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing the a stern view of a Ford Eagle Boat hull under construction within Building B of the company's River Rouge development. In the background, a more complete boat is visible. Both boats are in stocks with bracing. Lower right hand corner shows photo number and date of photo: 22310-6-5-18. "(1),'s is written above that number. Photo mounted on a linen backing with flap on left side with holes for binding.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of the nearly complete frame for Eagle Boat No. 38 within building "B" of the Ford River Rouge Factory Complex, as taken from above its port bow. Another Eagle Boat is under construction in the background. Crates and shelves of materials are visible in the adjacent aisles. "25609-2-1-19, #38" is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59. Workers work on the keel, which now has the upper framing and more bulkheads are now in place, within building "B" of the Ford River Rouge Factory Complex. The time of photo is 9:30 am. Lower left hand corner show number and date of photo: 26295-04-02-19 with a #59 and 9:30 am written above. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59, within building "B" of the Ford River Rouge Factory Complex, as viewed from off the boat's port bow. Workers atop the hull are completing the deck plating. Lower left hand corner show number and date of photo: 26371-04-07-19 with a #59 written above. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing the interior of Building B of the Ford Motor Company's River Rouge development containing an Eagle Boat in stocks with bracing upon rails. The boat is viewed from its bow. Its keel is installed. An overhead crane is visible in the background. The support beams for the factory's roof are numbered 5 through 19. The first beam is "X4." Material is staged on the floor. No workers are present. Lower right hand corner shows photo number and date of photo: 22349-6-10-18 the number 5 appears above the date. Photo mounted on a linen backing with flap on left side with holes for binding.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing the interior of Building B of the Ford Motor Company's River Rouge development containing Eagle Boats in stocks with bracing upon rails. Shows ship in background [ Has number 3 written next to it]. A keel is being assembled in the foreground, and a more complete ship is being worked on in the background. The number 3 has been handwritten beside the keel in the foreground, and 7 has been handwritten beside the hull in the background. Many workers are present. Lower right hand corner shows photo number and date of photo: 22351-6-10-18 the number 7 appears above the date. Photo mounted on a linen backing with flap on left side with holes for binding.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers installing plates for the hull of Eagle Boat No. 6 within the Ford Rouge Factory Complex. Another Eagle Boat is being constructed in the background. Lower right hand corner shows photo number and date of photo: 22435-6-13-18 with a number (6) above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of the interior of the flooded outfitting building at the Ford River Rouge Factory Complex. Pipefitting benches, a small boiler used for heat, and tools are in view. Lower right hand corner show number and date of photo: 26177-03-17-19. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers, including two on suspended scaffolding working on the hull of Eagle Boat No. 1, as viewed off of its starboard quarter with the Ford Rouge Factory Complex. Verso: "Plating complete". Lower right hand corner shows photo number and date of photo: 22470-6-18-18 has 1 written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the framing being added to the plated keel of an Eagle Boat No. 4, viewed from above its bow facing its stern, at the Ford River Rouge Complex. Additional material staged on floor. An overhead crane is visible in the background. Workers are present. Lower right hand corner shows photo number and date of photo: 22248-5-29-18 with a number 4 above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Black and white photograph depicting workers and a crane working on the construction of the elevator used to launch the Eagle Boats during the construction of the Ford Rouge Factory Complex. An elevated concrete shoot used to transfer material to the foundations is visible on the left. Workers in the background excavate by hand. The caption, "Elevator being framed, hydraulic lifts under construction in center," is on the verso. Lower right hand corner shows photo number and date of photo: 22554-6-28-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of progress made plating the hull of Eagle Boat No. 41 within building "B" of the Ford River Rouge Factory Complex, as taken from above its port bow. Several plates have been applied at the bow, as well as in a strip along its side. Another Eagle Boat is under construction in the background. A row of workers are lined up at the tool crib in the adjacent aisle. "25725-2-10-19, #41" is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Black and white photograph taken overlooking work to convert building "B" of the Ford River Rouge Factory Complex from manufacture of Eagle Boats to that of automobiles. The strip at the center of the photo, in one of the inner aisles of the building, has been mostly filled with dirt, and regularly spaced wooden forms holding concrete slabs with lengths of rebar sticking out. Piles of wood and dirt run along the length of the strip. Workers have climb ladders up to the trusses that run between the building's columns. A worker is at the controls of the overhead crane in the adjacent aisle on the right. "26787-5-27-19," is printed in the lower right corner of the recto, and "Laying assembly-line track in 'B' bldg (27 May 1918)," is handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of workers beginning to attach plates to the side of Eagle Boat No. 45 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. A single piece of plate near the bow, and a wooden brace running the length of the boat have been installed. Workers are on ladders and boards spanning the tops of the framing pieces. A large piece of plating leans against a column on the right. Shelves and crates of materials, and a tool crib are visible in the adjacent aisle to the right."#45 1:46 P.M. 25860-2-20-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers installing additional plating to a keel during the manufacture of an Eagle Boat inside of the Ford River Rouge development. Verso: "Further plating is added." Lower right hand corner shows photo number and date of photo: 2169-5-21-18 with a number 2 written above.. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing men working on the assembly of an Eagle Boat keel within Ford River Rouge Complex Building "B." Verso: "Assembly turned over to complete rivetting[sic] on bottom."Lower right hand corner shows photo number and date of photo: 22109-5-16-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of workers positioning the bow plating of Eagle Boat No. 45 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. The piece is suspended front the overhead crane, as workers standing on the boat's carriage hold it in position. Another Eagle Boat is under construction in the background. Shelves and crates of materials are visible in the adjacent aisle to the right."#45 2:46 P.M. 25861-2-20-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the interior of the Ford Rouge Complex where dollies are being staged for the construction of an Eagle Boat keel in the foreground as workers begin plating the hull of another Eagle Boat in the background. An overhead crane is also visible in the background. Verso: "While another Eagle boat progresses (background) dolly 05 carriage is prepared for keel laying on assembly line tracks." Lower right hand corner shows photo number and date of photo: 22288-6-03-18 with a number 6 written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken overlooking workers riveting pieces of plating for the hull of an Eagle Boat within building "B" of the Ford River Rouge Factory Complex. The metal sheets are propped up on sawhorses. A frame of an Eagle Boat awaits the plating in the background at the upper right. Another group of workers is also working on prefabricating plating in one of the neighboring aisles in the background on the left. "25610-2-1-19" is printed in the lower right corner of the recto, and "5A4, Prefabrication on large components," is handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting several machines, mounted on rails, used to install the propeller drive shaft, beneath an Eagle Boat within the Ford Rouge Factory Complex, as taken below its port quarter. Lower right hand corner of photo has number and date of photo: 22583-7-03-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers installing plates, frames, and bulkheads onto the keel of Eagle Boat No. 5 within the Ford Rouge Factory Complex. The caption "First frames are set in place" is printed on the verso. Lower right hand corner shows photo number and date of photo: 22434-6-13-18 with a number (5) above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers attaching plates to the keel of Eagle Boat No. 3 at the Ford River Rouge Complex. The photo is captioned "Hull grows" on the verso. Lower right hand corner shows photo number and date of photo: 22221-5-27-18. Has a number 3 written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting a portside view of the completed hull of Eagle Boat No. 1 at the Ford Rouge Factory Complex. Workers are on scaffolding along the side of the boat. Wooden stairs connect the scaffolding to rail flatcar decking. The caption, "Competed hull," is on the verso. Lower right hand corner shows photo number and date of photo: 22493-6-22-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of workers beginning to plate the hull of Eagle Boat No. 44 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. Several plates have been installed near the boat's bow through the combined efforts of a group of workers on the boat's carriage and the overhead crane. Meanwhile another group of workers begins the construction of a keel for another Eagle Boat on the left. Yet another Eagle Boat is under construction in the background. Coat racks, shelves, and piles of materials are along the wall on the right. "#44 12:42 A.M. 25866-2-20-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken overlooking stacks of barrels of rivets within building "B" of the Ford River Rouge Factory Complex, as taken from on deck of an Eagle Boat under construction in the building. Four other Eagle Boats are also under construction in adjacent aisles in the background. "27141-7-8-19," is printed in the lower right corner of the recto, and "Rivets," and "13," are handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers installing frames and plates onto the hull for Eagle Boat No. 3, viewed from overhead off of its starboard bow, within the Ford River Rouge Complex. An overhead crane is visible in the background. Additional plates and material are laying on floor. Eagle Boat No. 2 is visible in the background in another bay. Lower right hand corner shows photo number and date of photo: 22285-6-03-18 with a number 3 written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers, atop ladders and elevated platforms, riveting plates to the port side of Eagle Boat No. 4 within the Ford River Rouge Complex. An overhead crane, with operator, is stationed above the stern. Another Eagle Boat is in the background with scaffolding in place. The caption, "Last bilge plate," is printed on the verso. Lower right hand corner of photo has number and date of photo: 22658-7-08-18 with a (4) written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59, within building "B" of the Ford River Rouge Factory Complex, as viewed from above the boat's port bow. Workers on scaffolds rivet the hull's plates, while men on top of the framing appear ready to install decking. The time of photo is 3:00 pm. Lower left hand corner show number and date of photo: 26317-04-03-19 with a #59 and 3:00 pm written above. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59, within building "B" of the Ford River Rouge Factory Complex, as viewed from above the boat's stern. Workers prepare the framing for the decking. "59," is stenciled on the stern, and interior work lights are in use. The time of photo is 3:30 pm. Lower left hand corner show number and date of photo: 26319-04-03-19 with a #59 and 3:30 pm written above. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the manufacture of Eagle Boat No. 3 within the the Ford Rouge Factory Complex, as viewed from of its starboard bow. A Worker rivites a plate to the side beside the bow. Work also progresses on its upper plating. A worker stands on a mobile work station in the background on the left. Several other workers are also present. A number 3 is painted on the keel. The caption, "2nd row of plates nearing completion," is printed on the verso. Lower right hand corner shows photo number and date of photo: 22529-6-26-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of workers installing the framing on the keel for Eagle Boat No. 38 near its stern, within building "B" of the Ford River Rouge Factory Complex, as taken from above its port quarter. Several stringers and bulkheads are already in place. Shelves of materials, coat racks, and carts are visible in the adjacent aisles. "25608-2-1-19, #38" is printed in the lower left corner of the recto, and "5C2," is handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the manufacture of Eagle Boat No. 2 at the Ford Rouge Factory Complex as viewed from off its starboard bow. Much of the framing, bulkheads, and plating are completed. Workers are present. Material is staged and stored on the floor. The caption, "Hull growing," is on the verso. Lower right hand corner shows photo number and date of photo: 22480-6-18-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers attaching plating to the keel and frame of an Eagle Boat inside the Ford River Rouge Complex. An overhead crane is visible. Lower right hand corner shows photo number and date of photo: 22197-5-23-18 with a 1 above of the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers assembling the keel of an Eagle Boat at the Ford River Rouge Complex. Another Eagle Boat, with its framing installed, is under construction in the background. An overhead crane is visible. Lower right hand corner shows photo number and date of photo: 22200-5-23-18. Has a number 4 written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of progress made in the construction of Eagle Boat No. 44 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. Workers on ladders and perched atop pieces of the frame position the framing near the bow, as an overhead crane lowers the bulkheads into place near the stern. Another Eagle Boat is under construction in the background. Shelves and crates of materials are in the adjacent aisle on the left, and coat racks, shelves, and piles of materials are along the wall on the right. "#44 9:32 A.M. 25863-2-20-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers assembling plates on the keel in the construction of an Eagle Boat within the Ford River Rouge Complex, as a uniformed Navy officer looks on. Material is staged on the floor. An overhead crane can be seen in background. Verso: "and grows." Lower right hand corner shows photo number and date of photo: 22122-5-11-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken of an unused aisle within building "B" of the Ford River Rouge Factory Complex. Tracks run along the center of the aisle. Metal plates are leaned inside of bins along the sides of the aisle. A group of people are gathered in the aisle in the distance. Hats and lunch boxes are stored atop a coat rack behind one of the bins on the left. In the background on the left, Eagle Boat No. 54 is under construction in the adjacent aisle. Its starboard quarter is to the camera. Scaffolding surrounds its hull, and a worker stands on its deck. Another Eagle Boat is positioned ahead of No. 54 in the same aisle. 26780-5-29-19," is printed in the lower right corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Black and white photograph taken overlooking work to convert building "B" of the Ford River Rouge Factory Complex from manufacture of Eagle Boats to that of automobiles. Workers fill in the strips along the center of the aisles where the tracks that supported the boat's carriages ran, so that they can be replaced with tracks for automotive assembly lines. Piles of dirt and wood run along the open strips. "26782-5-27-19," is printed in the lower right corner of the recto, and "3C-2," is handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing the interior of a metal fabricating shop within a factory building at the Ford Motor Company's River Rouge development. Workers are visible at the machines. The foreground shows a large fire box and metal laying on wooden floor. Lower right hand corner shows photo number and date of photo: 22025-5-8-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59, within building "B" of the Ford River Rouge Factory Complex, of workers installing the boat's deck fixtures as viewed from about its starboard quarter, facing toward the bow. Cowl vents, davits, and some of the cabin structure are in place. "#59, 26374-04-07-19," is printed in the lower right corner of the recto and "8A15," is handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing the interior of Building B of the Ford Motor Company's River Rouge development containing an Eagle Boat in stocks with bracing upon rails. The boat's port side is show from its bow. A worker on a ladder installs plates. Its keel is marked with the number 4. Lower right hand corner shows photo number and date of photo: 22348-6-10-18 the number 4 appears above the date. Photo mounted on a linen backing with flap on left side with holes for binding.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting framing and plating being installed on the keel of Eagle Boat No. 3 within the Ford Rouge Factory Complex. A worker stands in the foreground on the left, and several others are visible beyond, beside the hull. Men present. Verso: "First row plates complete". Lower right hand corner shows photo number and date of photo: 22432-6-13-18 with a (3) over the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting manufacture of an large spline gear assembly for a driveshaft at the Ford Rouge Factory Complex, possibly used for an Eagle Boat or for the elevator system used to launch them. The gears are shown with a portion of the housing removed. Lower right hand corner shows photo number and date of photo: 22481-6-19-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting manufacture of Eagle Boat No. 1 at the Ford Rouge Factory Complex as viewed from of its port quarter. Bracing is supporting the hull, which appears nearly completed. Men are shown working on the deck. The chart house is visible on deck. Lower right hand corner shows photo number and date of photo: 22527-6-26-18 with a number (1) written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the view of the first Eagle Boat backing out of it's construction bay as taken from the interior of Building "B" looking toward the Transfer Table off of the boat's bow. Many spectators are outside for the launch of the first Eagle Boat. Lower right hand corner of photo has number and date of photo: 22616-7-11-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken of a large dial display within the room housing the hydraulic elevator machinery at the River Rouge Factory Complex. The large dial has four needles, and a scale that runs from 0 to 27, likely representing the displacement of the elevator in feet. A bell, a series of four numbered lights, and a small pressure gauge are located beneath the large dial display. A series of pipes and valves are in the foreground. "26399-04-11[?]-19," is printed in the lower right corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the upper plates being installed on Hull Eagle Boat No. 3, as taken from off its starboard quarter, within the Ford Rouge Factory Complex. An overhead crane is positioned above the hull. The caption "And growing" is on the verso. Lower right hand corner shows photo number and date of photo: 22496-6-22-18 with a number (3) written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of progress made in the construction of Eagle Boat No. 44 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. Workers on ladders and perched atop pieces of the frame position struts spanning several pieces of framing near the bow, as workers guide bulkheads suspended from the overhead crane into position near the stern. Another Eagle Boat is under construction in the background. Shelves and crates of materials are in the adjacent aisle on the left, and coat racks, shelves, and piles of materials are along the wall on the right. "#44 10:32 A.M. 25864-2-20-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the keel for Eagle Boat No. 8, as well as another Eagle Boat under construction in the background, within the Ford Rouge Factory Complex. Material and supplies are staged and stored on the floor in the foreground. Lower right hand corner shows photo number and date of photo: 22500-6-22-18 with a number (8) written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of a worker and a large pump on a cart inside the flooded outfitting building at the Ford River Rouge Factory Complex. The pump's suction pipe is submerged. Lower right hand corner show number and date of photo: 26176-03-17-19. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the interior of a long low wooden building at the Ford Rouge Factory Complex. Rails run along concrete piers along the center of the building. A wooden job-site work box is shown in the foreground. The left side of the building has moveable doors that run entire length of the building. Workers assemble panels in the background. Metal panels are staged on the floor. Lower right hand corner shows photo number and date of photo: 22567-7-02-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph a carriage on rails on the Eagle Boat assembly line with the hull of Eagle Boat No. 9 being plated in the background, within the Ford Rouge Factory Complex. Workers are present. Plates are stored on the floor in the foreground. Lower right hand corner shows photo number and date of photo: 22478-6-18-18 has number (9) written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59. Workers inside of the hull install plates, rivet, and space the framing, within building "B" of the Ford River Rouge Factory Complex, as viewed from above the boat's stern. The time of photo is 1:30 pm. Lower left hand corner show number and date of photo: 26300-04-02-19 with a #59 and 1:30 pm written above. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of a close-up of workers working beside the propeller shaft beneath an Eagle Boat within the Ford Rouge Factory Complex, as taken from near its stern. The threaded end of the shaft is awaiting installation of propeller. A portion of the rudder is also visible. The caption, "Propeller shaft in place." is on the verso. Lower right hand corner of photo has number and date of photo: 22585-7-05-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers constructing the keel of Eagle Boat No. 8 within the Ford Rouge Factory Complex. Another Eagle Boat is under construction in the background. Lower right hand corner shows photo number and date of photo: 22437-6-13-18 with a number (8) above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of progress made in the plating of the hull of Eagle Boat No. 44 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. A strip of plates have been installed along the boat's starboard side. The overhead crane is being used to lower a bulkhead near the boat's midsection. Meanwhile another group of workers is constructing a keel for another Eagle Boat on the left. Yet another Eagle Boat is under construction in the background. Coat racks, shelves, and piles of materials are along the wall on the right. "#44 1:42 A.M. 25867-2-20-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers laying the keel for Eagle Boat No. 8 within the Ford Rouge Factory Complex. A large wagon is positioned beside the keel. A coat rack is visible to the right of the center. Another Eagle Boat is being plated in the background. Lower right hand corner shows photo number and date of photo: 22477-6-18-18 has number (8) written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the manufacture of an Eagle Boat within the Ford Rouge Factory Complex, as taken off of its port quarter. Several machines, mounted on rails, used to install the propeller drive shaft are beneath the boat. Make-shift scaffolding is suspended from the stern. Ladders and a mobile work platform are along the boats port side. The caption "After deck house complete, machine places shaft thru stern tube," is on the verso. Lower right hand corner of photo has number and date of photo: 22584-7-03-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the manufacture of Eagle Boats No. 2 within the Ford Rouge Factory Complex, as viewed from off its starboard side. Scaffolding attached to the side of the boat, and workers attach its upper plating. A small car loaded with plates is in the foreground. Lower right hand corner shows photo number and date of photo: 22528-6-26-18 with a number (2) written above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Black and white photograph taken overlooking work to convert building "B" of the Ford River Rouge Factory Complex from manufacture of Eagle Boats to that of automobiles. The strip at the center of the photo, in one of the outer aisles of the building, has been mostly filled with dirt, with regularly spaced divots left in it. The adjacent strips visible in the background on the right, are still being filled in. A worker driving a tractor pulls a trailer carrying wooden boxes, one of which is being handled by another worker. "26784-5-27-19," is printed in the lower right corner of the recto, and "3C-3," is handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of progress made plating the hull of Eagle Boat No. 43 within building "B" of the Ford River Rouge Factory Complex, as taken from above its port bow. Several plates have been applied at the bow, as well as in a strip along its side. Workers are gathered beside the boat. Another Eagle Boat is under construction in the background. Pieces of framing are piled along the wall on the left. "25835-2-18-19, #43" is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Black and white photograph depicting the Ford Motor Company center assembly line for World War I Eagle Boats at Building B in the company's River Rouge development. There is a keel being laid in foreground. In the background a partially completed Eagle Boat hull is visible. Several workers are also in the scene. Lower right hand corner shows photo number and date of photo: 22663-7-8-18. Photo mounted on a linen backing with flap on left side with holes for binding.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of the installation of the bow section to the hull of Eagle Boat No. 44 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. The bow plates are suspended from the overhead crane, and ladders are leaned against the section. A worker is seated on a board spanning several pieces of framing along the boat's starboard side. A group of workers are constructing a keel for another Eagle Boat on the left. Yet another Eagle Boat is under construction in the background. Coat racks, shelves, and piles of materials are along the wall on the right. "#44 2:42 P.M. 25868-2-20-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken of the interior of the flooded outfitting building at the Ford River Rouge Workers in boots are standing in ankle-deep water. Stockpiled parts hung on the walls. Lower right hand corner show number and date of photo: 26170-03-17-19. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the interior of the Elevator Control Building at the Ford River Rouge Complex. This machinery is used to control the elevators used in launching the Eagle Boats. The caption, "Interior of elevator-control building," is printed on the verso. Lower right hand corner of photo has number and date of photo: 22643-7-16-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of workers beginning to attach plates to the side of Eagle Boat No. 45 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. A group of workers position a plate suspended by the overhead crane near the boat's bow. Workers continue to attach the framing near the boat's midsection. Another Eagle Boat is being plated in the background. A large piece of plating leans against a column on the right. Shelves and crates of materials, and a tool crib are visible in the adjacent aisle to the right."#45 12:46 P.M. 25859-2-20-19," is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting the port side of Eagle Boat No. 5 within the Ford Rouge Factory Complex. Workers have installed the bulkheads, framing, and one row of plates. Mobile elevated platforms are on the right side of the image along with materials are staged for use. Workers are present. The caption, "Stem in place, 2nd row plates being attached." is on the verso. Lower right hand corner of photo has number and date of photo: 22659-7-08-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers completing the keel of an Eagle Boat within the Ford Rouge Factory Complex. Another Eagle Boat is under construction in the background. The caption, "Keel complete, ready for first plates," is on the verso. Lower right hand corner shows photo number and date of photo: 22436-6-13-18 with a number (7) above the date. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of the workers beginning to rivet plating on the side of the complete frame for Eagle Boat No. 43 within building "B" of the Ford River Rouge Factory Complex, as taken from above its port bow. The photo has been labeled with a "1" on one of the bulkheads near the bow. Another Eagle Boat is under construction in the background. Pieces of framing are piled along the wall on the left. "25831-2-17-19, #43" is printed in the lower left corner of the recto. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of progress attaching the framing and bulkheads to the keel of Eagle Boat No. 45 within building "B" of the Ford River Rouge Factory Complex, as taken from above its starboard bow. Workers standing on the boat's carriage position a frame near the bow, as a group of workers work near the boat's midsection on its port side work from atop a board spanning the top of several frame pieces. Another Eagle Boat is being plated in the background. A large piece of plating leans against a column on the right. Shelves and crates of materials, and a tool crib are visible in the adjacent aisle to the right."#45 11:46 A.M. 25858-2-20-19," is printed in the lower left corner of the recto, and "framing at bow nearing completion," is handwritten on the verso. The photo is mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph taken to document the effort to set a new record time for boat construction through the manufacture of Eagle Boat No. 59, within building "B" of the Ford River Rouge Factory Complex, as viewed from above the boat's port bow. Workers on scaffolds rivet the hull's plates, while other workers installing Bilge Plates. Two more rows of plating remain to be installed. A sign posted on the boat's bow reads, "The Worlds Record for Boat Building and Launching is 14 Days Held by Great Lakes Engineering Co., Target for Ford Eagle Builders: 10 Days, CAN WE BEAT IT?" The time of photo is 3:00 pm. Lower left hand corner show number and date of photo: 26318-04-03-19 with a #59 and 3:00 pm written above. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph showing Ford River Rouge Complex Building "B" nearing completion. Transfer bed rails are in the foreground. Workers are present. Lower right hand corner shows photo number and date of photo: 22106-5-16-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph depicting workers attaching framing and bulkheads to the hull of Eagle Boat No. 5 within the Ford Rouge Factory Complex, as viewed off of the boat's starboard bow. Plates are staged on the floor and an overhead crane is visible. Lower right hand corner shows photo number and date of photo: 22474-6-18-18. Photo mounted on a linen backing.
- Date Issued:
- 1918-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime
- Description:
- Sepia-toned photograph of the interior of the flooded outfitting building. A time card rack and time clock are on the right. Below, elevated boards allowing workers to access their time cards have been set up. Overalls hang from a the coat rack in the background on the left. Lower right hand corner show number and date of photo: 26175-03-17-19. Photo mounted on a linen backing.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Maritime