Search Constraints
« Previous |
21 - 30 of 144
|
Next »
Search Results
- Description:
- Photograph. Sepia-toned photo of the Lonyo Road Sewer under construction which was located adjacent to the M.C.R.R. tracks. Handwritten text on the upper and lower edges of the photo shows "Lonyo Road Sewer before cave in" and "Detroit, Sept., 1919." The view shows a wide, excavated trench in the foreground along with track-mounted steel forms for constructing a large, double-barrel cast-in-place concrete sewer.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the upper right corner of the photo shows the number, "44," and "M.C.R.R. River Rouge Bascule Bridge; Erecting Lift Span; Mar. 28, 1920; Photo W. B. James, Br. Inspt." The view looks northward and shows the tower posts and truss structures that support the bridge counterweights. The lift span portion of the bridge is beginning to take shape on the left side. The 2-story brick building for the bridge operator can be seen in the right background.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing a man who is standing beside railroad locomotive no. 8947. Handwritten text on the lower and right edges of the photo shows "W. B. James, volunteer switchman during switchmen's strike, May, 1920" The photo was probably taken at a Michigan Central railroad yard near Detroit.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the lower right corner of the photo shows the number, "47," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; Concreting West Counterweight; Apr. 10, 1920; Photo W. B. James, Br. Inspt." The view shows five workmen who are mixing and pouring concrete into the wooden forms on the trusses in order to create one of the bridge counterweights. Piles of aggregate and sand can be seen in the foreground.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph (and 1 copy). Sepia-toned photo showing the new railroad bridge over the Rouge River. Printed text in the lower left corner of the photo shows the number, "59," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; Looking South, Bridge Partly Open; May 29, 1920. Photo W. B. James, Br. Insp." The view looks southwestward along the existing railroad tracks and shows the bridge in a partially open position. The massive concrete counterweights can be seen on the trusses in the foreground on each side of the tracks. Several workmen are working on the railroad tracks. The 2-story brick building for the bridge operator can be seen at the far right side of the photo.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing construction work for a new railroad bridge over the Rouge River. Printed text on the lower edge of the photo shows "Underwater concrete boxes, 2-12-1920." The view shows two workmen who are standing between two large steel buckets that are used for placing concrete underwater. The workmen appear to be attaching cables and chains to the tops of the buckets so that they can be lifted into position by a construction crane.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the temporary concrete mixing plant for the construction of a railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "16," and "M.C.R.R. River Rouge Bascule Bridge; Foundations; Mixing Plant, Material Hopper, and Chute; June 15, 1919. [W. B.] James Photo." The view shows two workmen who are standing on a wooden platform that is part of the mixing plant.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph (and 1 copy). Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "11," and "M.C.R.R. River Rouge Bascule Bridge; Foundations; Concreting Caisson #4; June 4, 1919." The view shows two workmen who are inside the top of caisson #4 (near lower left corner of photo) while two other workers are standing nearby on the railroad track. A concrete bucket is suspended overhead from the construction crane that can be seen in the center right foreground area of the photo. The vertical reinforcing bars of caisson #3 can be seen to the right and a fifth worker can be seen standing on the railroad tracks between the two caissons. A second construction crane and pile of debris are visible in the background on the other side of the tracks. The Rouge River (looking downstream) is also visible in the background and a construction barge can be seen along the near shore. Various buildings and stacks of lumber can be seen on the far shore of the river.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the construction of a new railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "46," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; The Old and the New Bridge; Apr. 10, 1920; Photo W. B. James, Br. Inspt." The view looks northwestward (upstream) along the Rouge River and shows the old railroad swing bridge on the left as well as the new single leaf Strauss trunnion bascule bridge on the right. The lift span portion of the new bridge is raised and is presently under construction. The new 2-story brick building for the bridge operator can be seen on the far right side of the photo.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the old M.C.R.R. railroad swing bridge being removed. The view looks northwestward across the Rouge River and shows the old bridge being loaded onto barges. It appears that two barges had been partially filled with water in order to lower their freeboard elevations. The barges were then moved under the old bridge and are now being pumped out as seen by the steam-powered pumps that are operating on both barges. As the pumping continues, the rising barges will lift the old bridge off of its foundation so that it can be towed away. Many workmen are standing on the old bridge and on the two barges.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services