Search Constraints
« Previous |
1 - 100 of 116
|
Next »
Search Results
- Description:
- Photograph. Sepia-toned photo showing a railroad bridge under construction over the Rouge River. Printed text in the lower left corner of the photo shows the number, "43," and "M.C.R.R. River Rouge Bascule Bridge; Erecting Lift Span; Mar. 27, 1920. Photo W. B. James, Insp." The view looks southeastward from the bank of the Rouge River and shows the truss structure that supports the bridge counterweights and lift span. The lift span is located at the far right side of the structure and a construction crane is lifting one of the structural members into position. The 2-story brick building for the bridge operator can be seen at the far left side of the photo. Near the center of the photo, a sign on the top of the river bank shows "Cables, Do Not Drag Anchor."
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the completed new railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "54," and "M.C.R.R. River Rouge Bascule Bridge; Old Bridge Being Towed Out & New Bridge Ready to Close in Place; May 3, 1920; Photo W. B. James, Br. Insp." The view looks northward (upstream) along the Rouge River and shows the old railroad swing bridge loaded on barges on the left and ready to be towed away by the tugboat, Samuel J. Dark. The new single leaf Strauss trunnion bascule bridge (in raised position) can be seen on the right. Many workmen and spectators are seated or standing on the river bank.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing a group of men who are standing beside railroad boxcar that is partly tipped over. Handwritten text on the lower edge of the photo shows "A split switch. Volunteer switchmen, May, 1920." Evidently, a switch malfunctioned which caused the wheel truck at the right end of the boxcar to come off the tracks while the wheel truck at the left end appears to still be on the tracks. The photo was probably taken at a Michigan Central railroad yard near Detroit.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the construction of a new railroad bridge over the Rouge River. The view looks northeastward and shows the lift span portion of the new single leaf Strauss trunnion bascule bridge in the raised position where it is presently under construction. Several factory buildings are visible in the background.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the upper right corner of the photo shows the number, "36," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; East Counterweight Truss and End Posts of Lift Span in Place; Feb. 14, 1920; Photo W. B. James." The view looks northward on the east side of the Rouge River and shows the tower posts and truss structures that support the bridge counterweights. A construction crane can be seen in the left background. The 2-story brick building for the bridge operator is visible in the center background behind the bridge trusswork. The ground is lightly covered with snow.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the top portion of a caisson that was used for the construction of a railroad bridge over the Rouge River. The view shows the side of the caisson (probably caisson #1) including circular scaffolding, various pieces of equipment, and piping at the left side of the photo. Piles of construction materials, excavated material, and a temporary construction shed are visible in the background.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the new railroad bridge over the Rouge River. The view looks southeastward with the Rouge River and the fully raised bridge shown in the foreground. The 2-story brick building for the bridge operator can be seen to the left of the bridge. Houses and a church are visible in the background on the right side of the photo.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Sepia-toned photograph showing several men who are standing or seated on the tops of a line of refrigerated railroad cars, taken facing to the west near the Michigan Central Railroad's Junction Yard. Two ice hatches are visible on the top of the car in the foreground. The line of cars may be backing up slowly to a summit/hump. Cars or groups of cars were uncoupled after reaching the summit. The downward slope on the other side of the summit caused the cars to roll by gravity where they were then sorted by switches onto different tracks according to car destination. Brakemen on the car or group of cars had to control the speed as they rolled to their intended track location. The view shows earth embankments and other track lines on each side of the railroad cars as well as lines of utility poles, overhead wires, and the base of a moonlight tower. The concrete overpass over Lonyo Road is in the background on the right.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph (and 1 copy). Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "14," and additional text at the top center shows "M.C.R.R. River Rouge Bascule Bridge; Foundations; Caissons #3 & #4; June 4, 1919. Photo W. B. James, Br. Inspt." The view looks northeastward along the existing railroad tracks with caissons #3 and #4 shown (labeled) in the center foreground. A workman is standing to the left of caisson #4. A construction crane and temporary concrete mixing plant can be seen to the left of the railroad tracks. Also, temporary construction buildings, construction materials, and construction debris can be seen on both sides of the tracks. Several factory buildings are visible in the left background and a large railroad yard can be seen in the right background area.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the lower left corner of the photo shows the number, "32," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; Setting Tower Posts; Jan. 1, 1920; Photo W. B. James, Br. Inspt." The view looks northeastward and shows the ends of the existing railroad tracks at the banks of the Rouge River. Tower posts for the new bridge can be seen in the background on each side of the tracks and other structural steel beams can be seen on the ground beside the tracks. A track-mounted construction crane and several factory buildings are visible in the background of the photo. The ground is lightly covered with snow and chunks of ice can be seen on the river.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "35," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; Erecting East Counterweight Truss; Photo W. B. James; Jan. 31, 1920." The view looks northward on the east side of the Rouge River and shows the tower post structure which provides support for the bridge counterweights. A construction crane can be seen in the right background as well as the 2-story brick building for the bridge operator.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the completed new railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "61," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; Bridge in Operation; May 29, 1920; Photo W. B. James, Br. Insp." The view looks northward (upstream) along the Rouge River and shows the new single leaf Strauss trunnion bascule bridge with its lift span in the closed position. The massive concrete counterweights can be seen at the far right side of the structure. Also, the new 2-story brick building for the bridge operator can be seen on the far right side of the photo.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "31," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; Cutting Falsework to Set 1st Steel; Photo W. B. James, Br. Inspt.; Dec. 17, 1919." The view looks northward. Steel truss beams are lying on the ground in the foreground and the Rouge River is visible in the left background. Two groups of workmen are removing the existing railroad tracks and a track-mounted construction crane can be seen on the right side of the photo. The ground is lightly covered with snow.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the top portion of a caisson that was used for the construction of a railroad bridge over the Rouge River. Printed text on the upper and lower edges of the photo shows "Caisson #2" and "Apr. 18, 1919." The view shows the top of the caisson including circular scaffolding, various pieces of equipment, piping, and reinforcing bars. One workman is standing inside the top of the caisson and another is standing above it on the railroad tracks.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the inside of a caisson that was used for the construction of a railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "27," and "M.C.R.R. River Rouge Bascule Bridge; Foundations; Caisson #3; July 18, 1919; W. B. James Photo. Br. Inspt." The view looks down on the top of the caisson and shows various pieces of equipment, piping, and scaffolding.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the top portion of a caisson that was used for the construction of a railroad bridge over the Rouge River. Printed text on the upper and lower edges of the photo shows "Caisson #1" and "Apr. 18, 1919." The view shows the top of the caisson including circular scaffolding, various pieces of equipment, piping, and reinforcing bars. Two workmen are standing inside the top of the caisson scaffolding.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the new and old railroad bridges over the Rouge River. The view looks southeastward across the Rouge River and shows the new bascule bridge (raised) on the left and the old railroad swing bridge on the right. Many workmen are standing on the railroad tracks near the center of the photo.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the upper right corner of the photo shows the number, "44," and "M.C.R.R. River Rouge Bascule Bridge; Erecting Lift Span; Mar. 28, 1920; Photo W. B. James, Br. Inspt." The view looks northward and shows the tower posts and truss structures that support the bridge counterweights. The lift span portion of the bridge is beginning to take shape on the left side. The 2-story brick building for the bridge operator can be seen in the right background.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the lower right corner of the photo shows the number, "47," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; Concreting West Counterweight; Apr. 10, 1920; Photo W. B. James, Br. Inspt." The view shows five workmen who are mixing and pouring concrete into the wooden forms on the trusses in order to create one of the bridge counterweights. Piles of aggregate and sand can be seen in the foreground.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph (and 1 copy). Sepia-toned photo showing the new railroad bridge over the Rouge River. Printed text in the lower left corner of the photo shows the number, "59," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; Looking South, Bridge Partly Open; May 29, 1920. Photo W. B. James, Br. Insp." The view looks southwestward along the existing railroad tracks and shows the bridge in a partially open position. The massive concrete counterweights can be seen on the trusses in the foreground on each side of the tracks. Several workmen are working on the railroad tracks. The 2-story brick building for the bridge operator can be seen at the far right side of the photo.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing construction work for a new railroad bridge over the Rouge River. Printed text on the lower edge of the photo shows "Underwater concrete boxes, 2-12-1920." The view shows two workmen who are standing between two large steel buckets that are used for placing concrete underwater. The workmen appear to be attaching cables and chains to the tops of the buckets so that they can be lifted into position by a construction crane.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the temporary concrete mixing plant for the construction of a railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "16," and "M.C.R.R. River Rouge Bascule Bridge; Foundations; Mixing Plant, Material Hopper, and Chute; June 15, 1919. [W. B.] James Photo." The view shows two workmen who are standing on a wooden platform that is part of the mixing plant.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph (and 1 copy). Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "11," and "M.C.R.R. River Rouge Bascule Bridge; Foundations; Concreting Caisson #4; June 4, 1919." The view shows two workmen who are inside the top of caisson #4 (near lower left corner of photo) while two other workers are standing nearby on the railroad track. A concrete bucket is suspended overhead from the construction crane that can be seen in the center right foreground area of the photo. The vertical reinforcing bars of caisson #3 can be seen to the right and a fifth worker can be seen standing on the railroad tracks between the two caissons. A second construction crane and pile of debris are visible in the background on the other side of the tracks. The Rouge River (looking downstream) is also visible in the background and a construction barge can be seen along the near shore. Various buildings and stacks of lumber can be seen on the far shore of the river.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the construction of a new railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "46," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; The Old and the New Bridge; Apr. 10, 1920; Photo W. B. James, Br. Inspt." The view looks northwestward (upstream) along the Rouge River and shows the old railroad swing bridge on the left as well as the new single leaf Strauss trunnion bascule bridge on the right. The lift span portion of the new bridge is raised and is presently under construction. The new 2-story brick building for the bridge operator can be seen on the far right side of the photo.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the old M.C.R.R. railroad swing bridge being removed. The view looks northwestward across the Rouge River and shows the old bridge being loaded onto barges. It appears that two barges had been partially filled with water in order to lower their freeboard elevations. The barges were then moved under the old bridge and are now being pumped out as seen by the steam-powered pumps that are operating on both barges. As the pumping continues, the rising barges will lift the old bridge off of its foundation so that it can be towed away. Many workmen are standing on the old bridge and on the two barges.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows "M.C.R.R. River Rouge Bascule Bridge; Foundations; Caisson #4; June 1, 1919. James Photo." The view looks northeastward along the existing railroad tracks with several workmen standing on the top of caisson #4 in the center foreground. One workman is standing behind the caisson and another is standing on the railroad tracks to the right. A temporary concrete mixing plant can be seen in the center background area along with construction materials and construction debris.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the construction of a new railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "48," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; The Old and the New Bridge; Apr. 14, 1920; Photo W. B. James, Br. Inspt." The view looks northwestward (upstream) along the Rouge River and shows the old railroad swing bridge on the left (in open position) as well as the new single leaf Strauss trunnion bascule bridge on the right. The lift span portion of the new bridge is raised. The wooden formwork for one of the concrete counterweights can be seen just above the ground surface. A small portion of the new 2-story brick building for the bridge operator can be seen on the far right side of the photo.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the lower left corner of the photo shows "M.C.R.R. River Rouge Bascule; May 27, 1919." The view looks southward along the existing railroad tracks with the old swing bridge being visible in the right background. A temporary construction crane can be seen to the left of the tracks along with piles of construction materials and construction debris. Two workmen are standing on the right side of the tracks next to the tops of caissons #3 and #4.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the completed new railroad bridge over the Rouge River. The view looks northward (upstream) near the bank of the Rouge River and shows the new single leaf Strauss trunnion bascule bridge with its lift span in the raised position. One of the two massive concrete counterweights can be seen near the ground surface at the base of the structure. The new 2-story brick building for the bridge operator can be seen on the far right side of the photo.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the upper right corner of the photo shows the number, "38," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; Setting Derrick on Top of the Tower Span; Mar. 21, 1920; Photo W. B. James, Br. Inspt." The view looks northeastward and shows the tower posts and truss structures that support the bridge counterweights. A group of four workmen can be seen at the upper right top area of the structure. Part of a construction crane can be seen at the left side of the photo and factory buildings are visible in the distant background.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the lower left corner of the photo shows the number, "38," and "M.C.R.R. River Rouge Bascule Bridge; Erecting C'w't [Counterweight] Trusses; Feb. 28, 1920; W. B. James Photo." The view looks westward and shows the tower posts and truss structures which will support the bridge counterweights. Two construction cranes can be seen in the right background. Two temporary construction buildings can be seen at the far left side of the photo and a portion of the 2-story brick building for the bridge operator is visible at the far right side. The ground is lightly covered with snow.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing construction work for a new railroad bridge over the Rouge River. Printed text on the lower edge of the photo shows the date, "2-12-1920." The view shows two workmen who are standing between two large steel buckets that are used for placing concrete underwater. The workmen appear to be attaching cables and chains to the tops of the buckets so that they can be lifted into position by a construction crane.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph (and 1 copy). Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "13," and "M.C.R.R. River Rouge Bascule Bridge; Foundations; Caissons #3 & #4 & Sump Pumps; June 4, 1919." The view shows one workman standing on the top of caisson #4 while two others are standing on the adjacent railroad tracks. Two other workmen are standing near the base of the caisson. The top of caisson #3 and its vertical reinforcing bars can be seen in the right foreground area. Pumps and pipes for dewatering the excavation are visible in the center foreground area of the photo.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the top portion of a caisson that was used for the construction of a railroad bridge over the Rouge River. The view shows the side of the caisson (probably caisson #1) including circular scaffolding, various pieces of equipment, and piping at the left side of the photo. Piles of construction materials, excavated material, and a temporary construction shed are visible in the background.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the lower right corner of the photo shows the number, "39," and "M.C.R.R. River Rouge Bascule Bridge; Building Counterweight Forms; Feb. 28, 1920; W. B. James Photo." The view looks northward and shows several workmen who are constructing wooden forms on the trusses in order to contain the poured concrete that will create the counterweights. Two construction cranes can be seen in the background. The 2-story brick building for the bridge operator is visible at the far right side. The ground is lightly covered with snow.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the top portions of two caissons that were part of the construction work for a railroad bridge over the Rouge River. The view shows the tops of the two caissons (one on each side of the existing railroad tracks) including circular scaffolding, various pieces of equipment, piping, and reinforcing bars. One workman is standing on top of the caisson in the center foreground and another is walking along the railroad tracks in the left background.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing two men who are standing beside a railroad track switch. Handwritten text on the left and upper edges of the photo shows "During Switchmens Strike" and "Volunteer switchmen, May 1920; Porteous, Div. Freight Ag't.; Ulrich, Ass't. Passenger Agt." Both men are wearing workmen's overalls and hats. Based upon the position on the text, the man on the left is Mr. Porteous and the man on the right is Mr. Ulrich. Handrails and other track lines are visible in the background. The photo was probably taken at a Michigan Central railroad yard near Detroit.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing a railroad bridge under construction over the Rouge River. Printed text in the lower left corner of the photo shows the number, "42," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; End Post, Bearing and Gusset Plates; Mar. 21, 1919. Photo W. B. James, Br. Inspt." The view shows a group of 12 workmen who are seated or standing on the truss structure that supports the bridge counterweights. Some of the wooden formwork for one of the counterweights (made of poured concrete) can be seen in the background.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the old and new railroad bridges over the Rouge River. The blurred view looks northward (upstream) along the Rouge River and shows the old railroad swing bridge (center) loaded on barges and ready to be towed away by the tugboat, Samuel J. Dark. The new single leaf Strauss trunnion bascule bridge (in raised position) can be seen on the far right. Several workmen and spectators are standing on the river bank near the base of the new bridge.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the construction of a caisson for a railroad bridge that is being built over the Rouge River. Printed text in the top center of the photo shows "Caisson #1" and additional printed text in the lower right corner shows "M.C.R.R. River Rouge Bascule; May 27, 1919." The view looks down on the top of the caisson and shows various pieces of equipment, piping, and scaffolding. Two workmen can be seen in the upper right corner of the photo.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the lower left corner of the photo shows "M.C.R.R. River Rouge Bascule; May 14, 1919." The view looks southwestward along the existing railroad tracks with the old swing bridge being visible in the background. Temporary construction cranes, equipment, and construction debris can be seen on both sides of the railroad tracks. The tops of caissons #3 and #4 can be seen to the right of the tracks. Several workmen can be seen in the distance.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. The view looks northeastward along the side of the existing railroad tracks with caisson #3 shown in the right foreground and caisson #4 shown behind it. Dewatering pumps and piping can be seen in the center and left foreground area. The base of a construction crane and temporary concrete mixing plant can be seen in the left background. Also, two workmen are standing on the existing railroad tracks in the background.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "19," and "M.C.R.R. River Rouge Bascule Bridge; Foundations; Bucket Lock on Caisson #4; June 18, 1919. [W. B.] James Photo." The view is facing southwestward and shows a group of 11 workmen who have posed for the photo and are standing on top of caisson #4 or on the adjacent railroad tracks. Several factory buildings can be seen in the left background and a small portion of the Rouge River can be seen in the right background. The top of the old railroad bridge is visible near the center of the photo. Handwritten text on the verso shows "Supt. Hedrich (white hat)" and "Missouri Bridge & Iron Co., contractors; Mr. O'Conner, chief engineer."
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the temporary concrete mixing plant for the construction of a railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "12," and additional text in top center area shows "M.C.R.R. River Rouge Bascule Bridge; Foundations; June 4, 1919; Mixing Plant." The view shows the aggregate hopper being loaded by a construction crane and bucket that can be seen at the left side of the photo. Two workmen are standing near the concrete mixer on the right side of the plant. The concrete mixer is positioned in order to pour the finished mixture into a second construction crane bucket that will carry the concrete to its placement location. Railroad tracks, temporary construction buildings, and piles of construction materials can be seen in the center area of the photo. Factory buildings and houses can be seen in the right background. A temporary construction building near the center of the photo has two signs on the roof. The text is not quite legible, but the sign on the left shows "[?] Foundations [?] Missouri Bridge & Iron Co. [?]" and the sign on the right shows "[?] Superstructure [?] Wisconsin Bridge & Iron Co. [?]."
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing a group of three workmen who are standing at the side of railroad track line which was located at the M.C.R.R. River Rouge Bascule Bridge project site. The men are looking down into the top of a caisson. A factory building is visible in the left background area of the photo. A construction crane, temporary buildings, piping, and construction materials can be seen on the right.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the new railroad bridge over the Rouge River. Printed text in the lower left corner of the photo shows the number, "60," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; View Looking South; May 29, 1920. Photo W. B. James, Br. Insp." The view looks along the existing railroad tracks and shows the bridge in a closed position. The massive concrete counterweights can be seen on the overhead trusses in the foreground on each side of the tracks. Several workmen are working on the railroad tracks. The 2-story brick building for the bridge operator can be seen at the far right side of the photo.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the upper right corner of the photo shows the number, "30," and "M.C.R.R. River Rouge Bascule Bridge; Foundations; Dredging Rest Pier Cofferdam (Setting First Floor Beam, Background); Photo W. B. James, Bridge Inspector; Dec. 17, 1919." The view looks northeastward. Steel sheet piling as well as heavy timber pilings and cross-members are visible in the foreground. A portion of the old railroad bridge can the seen on the far left side of the photo and a construction crane can be seen on the right side. Several factory buildings are visible in the background. The ground is lightly covered with snow and small chunks of ice can be seen on the river.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the upper right corner of the photo shows the number, "34," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; Riveting Tower Span; Jan. 10, 1920; Photo W. B. James, Br. Inspt." The view looks northeastward and shows the new tower posts on each side of the existing railroad tracks as well as the overhead span. Construction cranes, workmen, and factory buildings can be seen in the background. The ground is lightly covered with snow.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing part of the project site for a railroad bridge that is being constructed over the Rouge River. Printed text in the upper left corner of the photo shows the number, "23." The view shows a large pile of excavated soil along with pipe sections and pieces of construction equipment. One workman is standing near the top of the pile. The water surface of the river can be seen on the left background.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the lower left corner of the photo shows "M.C.R.R.; River Rouge Bascule; May 12, 1919. The view looks northwestward along the existing railroad tracks with caissons #1 and #2 visible in the foreground. In the background is a steam locomotive. Construction cranes, equipment, and temporary buildings can be seen on both sides of the tracks. The old railroad swing bridge can be seen in the upper left area of the photo and the water surface of the river can be seen to the right.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the old railroad swing bridge over the Rouge River. The photo shows a close-up view of one of the concrete bridge piers near the river bank as well as a water elevation gauge. The central base pier of the swing bridge can be seen in the right background area of the photo.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the construction of a caisson for a railroad bridge that is being built over the Rouge River. Printed text in the top center of the photo shows "Caisson #3" and additional printed text in the lower left corner shows "M.C.R.R. River Rouge Bascule; May 27, 1919." The view looks down on the top of the caisson and shows piping, reinforcing bars, scaffolding, and formwork.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the top portion of a caisson that was used for the construction of a railroad bridge over the Rouge River. Printed text on the upper and lower edges of the photo shows "Caisson #4" and "Apr. 18, 1919." The view shows the top of the caisson including circular scaffolding, various pieces of equipment, piping, and reinforcing bars. A construction crane, two workmen, and railroad boxcars can be seen in the background.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph (and 1 copy). Sepia-toned photo showing the temporary concrete mixing plant for the construction of a railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "17," and "M.C.R.R. River Rouge Bascule Bridge; Foundations; Mixing Plant; June 11, 1919. [W. B.] James Photo." The view shows the aggregate hopper being loaded by a construction crane and bucket that can be seen at the right side of the photo. Two workmen are standing near the concrete mixer on the left side of the plant. The concrete mixer is positioned in order to pour the finished mixture into a second construction crane bucket that will carry the concrete to its placement location. Railroad tracks and construction materials can be seen in the foreground and a factory building can be seen in the right background. The banks of the Rouge River can be seen in the left background area of the photo.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the inside of a caisson that was used for the construction of a railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "24," and "M.C.R.R. River Rouge Bascule Bridge; Foundations; Caisson #3; June 26, 1919; [W. B.] James Photo." The view shows three workmen on top of the caisson along with various pieces of equipment and piping. Near the top center area of the photo, a fourth workman is looking through a gap in the circular scaffolding.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the old railroad swing bridge over the Rouge River being removed. The view looks northwestward (upstream) along the Rouge River and shows the old railroad swing bridge being loaded on barges so that it can be towed away by the tugboat, Samuel J. Dark. Many workmen and spectators are standing on the old bridge or on the barges. The new bascule bridge is not visible in this photo, but it is located to the right of the old bridge.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing structural details of a new railroad bridge over the Rouge River. The view shows a close-up view of the end post, bearing, and gusset plates of the new bridge.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows "M.C.R.R. River Rouge Bascule Bridge; Foundations; Caisson #4; June 1, 1919." Additional printed text in the lower left corner shows "James Photo." The view looks northeastward along the existing railroad tracks with several workmen standing on the top of caisson #4 in the center foreground. Three other workman are standing behind the caisson. A temporary concrete mixing plant can be seen in the center background area along with construction materials and construction debris.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Collection:
- Municipal Services
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows "M.C.R.R. River Rouge Bascule Bridge; Foundations; Caisson #4; June 1, 1919." Additional printed text in the lower left corner shows "James Photo." The view looks northeastward along the existing railroad tracks with several workmen standing on the top of caisson #4 in the center foreground. Three other workman are standing behind the caisson. A temporary concrete mixing plant can be seen in the center background area along with construction materials and construction debris.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the lower right corner of the photo shows the number, "47," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; Concreting West Counterweight; Apr. 10, 1920; Photo W. B. James, Br. Inspt." The view shows five workmen who are mixing and pouring concrete into the wooden forms on the trusses in order to create one of the bridge counterweights. Piles of aggregate and sand can be seen in the foreground.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the top portion of a caisson that was used for the construction of a railroad bridge over the Rouge River. Printed text on the upper and lower edges of the photo shows "Caisson #2" and "Apr. 18, 1919." The view shows the top of the caisson including circular scaffolding, various pieces of equipment, piping, and reinforcing bars. One workman is standing inside the top of the caisson and another is standing above it on the railroad tracks.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the lower left corner of the photo shows "M.C.R.R.; River Rouge Bascule; May 12, 1919. The view looks northwestward along the existing railroad tracks with caissons #1 and #2 visible in the foreground. In the background is a steam locomotive. Construction cranes, equipment, and temporary buildings can be seen on both sides of the tracks. The old railroad swing bridge can be seen in the upper left area of the photo and the water surface of the river can be seen to the right.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Sepia-toned photograph showing several men who are standing or seated on the tops of a line of refrigerated railroad cars, taken facing to the west near the Michigan Central Railroad's Junction Yard. Two ice hatches are visible on the top of the car in the foreground. The line of cars may be backing up slowly to a summit/hump. Cars or groups of cars were uncoupled after reaching the summit. The downward slope on the other side of the summit caused the cars to roll by gravity where they were then sorted by switches onto different tracks according to car destination. Brakemen on the car or group of cars had to control the speed as they rolled to their intended track location. The view shows earth embankments and other track lines on each side of the railroad cars as well as lines of utility poles, overhead wires, and the base of a moonlight tower. The concrete overpass over Lonyo Road is in the background on the right.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the new railroad bridge over the Rouge River. The view looks southeastward with the Rouge River and the fully raised bridge shown in the foreground. The 2-story brick building for the bridge operator can be seen to the left of the bridge. Houses and a church are visible in the background on the right side of the photo.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the top portion of a caisson that was used for the construction of a railroad bridge over the Rouge River. The view shows the side of the caisson (probably caisson #1) including circular scaffolding, various pieces of equipment, and piping at the left side of the photo. Piles of construction materials, excavated material, and a temporary construction shed are visible in the background.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the top portion of a caisson that was used for the construction of a railroad bridge over the Rouge River. Printed text on the upper and lower edges of the photo shows "Caisson #4" and "Apr. 18, 1919." The view shows the top of the caisson including circular scaffolding, various pieces of equipment, piping, and reinforcing bars. A construction crane, two workmen, and railroad boxcars can be seen in the background.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the lower left corner of the photo shows the number, "38," and "M.C.R.R. River Rouge Bascule Bridge; Erecting C'w't [Counterweight] Trusses; Feb. 28, 1920; W. B. James Photo." The view looks westward and shows the tower posts and truss structures which will support the bridge counterweights. Two construction cranes can be seen in the right background. Two temporary construction buildings can be seen at the far left side of the photo and a portion of the 2-story brick building for the bridge operator is visible at the far right side. The ground is lightly covered with snow.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the top portion of a caisson that was used for the construction of a railroad bridge over the Rouge River. The view shows the side of the caisson (probably caisson #1) including circular scaffolding, various pieces of equipment, and piping at the left side of the photo. Piles of construction materials, excavated material, and a temporary construction shed are visible in the background.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the upper right corner of the photo shows the number, "30," and "M.C.R.R. River Rouge Bascule Bridge; Foundations; Dredging Rest Pier Cofferdam (Setting First Floor Beam, Background); Photo W. B. James, Bridge Inspector; Dec. 17, 1919." The view looks northeastward. Steel sheet piling as well as heavy timber pilings and cross-members are visible in the foreground. A portion of the old railroad bridge can the seen on the far left side of the photo and a construction crane can be seen on the right side. Several factory buildings are visible in the background. The ground is lightly covered with snow and small chunks of ice can be seen on the river.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. The view looks northeastward along the side of the existing railroad tracks with caisson #3 shown in the right foreground and caisson #4 shown behind it. Dewatering pumps and piping can be seen in the center and left foreground area. The base of a construction crane and temporary concrete mixing plant can be seen in the left background. Also, two workmen are standing on the existing railroad tracks in the background.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the old railroad swing bridge over the Rouge River. The photo shows a close-up view of one of the concrete bridge piers near the river bank as well as a water elevation gauge. The central base pier of the swing bridge can be seen in the right background area of the photo.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the construction of a caisson for a railroad bridge that is being built over the Rouge River. Printed text in the top center of the photo shows "Caisson #3" and additional printed text in the lower left corner shows "M.C.R.R. River Rouge Bascule; May 27, 1919." The view looks down on the top of the caisson and shows piping, reinforcing bars, scaffolding, and formwork.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the old and new railroad bridges over the Rouge River. The blurred view looks northward (upstream) along the Rouge River and shows the old railroad swing bridge (center) loaded on barges and ready to be towed away by the tugboat, Samuel J. Dark. The new single leaf Strauss trunnion bascule bridge (in raised position) can be seen on the far right. Several workmen and spectators are standing on the river bank near the base of the new bridge.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing construction work for a new railroad bridge over the Rouge River. Printed text on the lower edge of the photo shows "Underwater concrete boxes, 2-12-1920." The view shows two workmen who are standing between two large steel buckets that are used for placing concrete underwater. The workmen appear to be attaching cables and chains to the tops of the buckets so that they can be lifted into position by a construction crane.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the construction of a new railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "46," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; The Old and the New Bridge; Apr. 10, 1920; Photo W. B. James, Br. Inspt." The view looks northwestward (upstream) along the Rouge River and shows the old railroad swing bridge on the left as well as the new single leaf Strauss trunnion bascule bridge on the right. The lift span portion of the new bridge is raised and is presently under construction. The new 2-story brick building for the bridge operator can be seen on the far right side of the photo.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the old railroad swing bridge over the Rouge River being removed. The view looks northwestward (upstream) along the Rouge River and shows the old railroad swing bridge being loaded on barges so that it can be towed away by the tugboat, Samuel J. Dark. Many workmen and spectators are standing on the old bridge or on the barges. The new bascule bridge is not visible in this photo, but it is located to the right of the old bridge.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the completed new railroad bridge over the Rouge River. The view looks northward (upstream) near the bank of the Rouge River and shows the new single leaf Strauss trunnion bascule bridge with its lift span in the raised position. One of the two massive concrete counterweights can be seen near the ground surface at the base of the structure. The new 2-story brick building for the bridge operator can be seen on the far right side of the photo.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the new and old railroad bridges over the Rouge River. The view looks southeastward across the Rouge River and shows the new bascule bridge (raised) on the left and the old railroad swing bridge on the right. Many workmen are standing on the railroad tracks near the center of the photo.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the top portion of a caisson that was used for the construction of a railroad bridge over the Rouge River. Printed text on the upper and lower edges of the photo shows "Caisson #1" and "Apr. 18, 1919." The view shows the top of the caisson including circular scaffolding, various pieces of equipment, piping, and reinforcing bars. Two workmen are standing inside the top of the caisson scaffolding.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing a railroad bridge under construction over the Rouge River. Printed text in the lower left corner of the photo shows the number, "42," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; End Post, Bearing and Gusset Plates; Mar. 21, 1919. Photo W. B. James, Br. Inspt." The view shows a group of 12 workmen who are seated or standing on the truss structure that supports the bridge counterweights. Some of the wooden formwork for one of the counterweights (made of poured concrete) can be seen in the background.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph (and 1 copy). Sepia-toned photo showing the new railroad bridge over the Rouge River. Printed text in the lower left corner of the photo shows the number, "59," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; Looking South, Bridge Partly Open; May 29, 1920. Photo W. B. James, Br. Insp." The view looks southwestward along the existing railroad tracks and shows the bridge in a partially open position. The massive concrete counterweights can be seen on the trusses in the foreground on each side of the tracks. Several workmen are working on the railroad tracks. The 2-story brick building for the bridge operator can be seen at the far right side of the photo.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph (and 1 copy). Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "11," and "M.C.R.R. River Rouge Bascule Bridge; Foundations; Concreting Caisson #4; June 4, 1919." The view shows two workmen who are inside the top of caisson #4 (near lower left corner of photo) while two other workers are standing nearby on the railroad track. A concrete bucket is suspended overhead from the construction crane that can be seen in the center right foreground area of the photo. The vertical reinforcing bars of caisson #3 can be seen to the right and a fifth worker can be seen standing on the railroad tracks between the two caissons. A second construction crane and pile of debris are visible in the background on the other side of the tracks. The Rouge River (looking downstream) is also visible in the background and a construction barge can be seen along the near shore. Various buildings and stacks of lumber can be seen on the far shore of the river.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the lower left corner of the photo shows "M.C.R.R. River Rouge Bascule; May 27, 1919." The view looks southward along the existing railroad tracks with the old swing bridge being visible in the right background. A temporary construction crane can be seen to the left of the tracks along with piles of construction materials and construction debris. Two workmen are standing on the right side of the tracks next to the tops of caissons #3 and #4.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the upper right corner of the photo shows the number, "34," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; Riveting Tower Span; Jan. 10, 1920; Photo W. B. James, Br. Inspt." The view looks northeastward and shows the new tower posts on each side of the existing railroad tracks as well as the overhead span. Construction cranes, workmen, and factory buildings can be seen in the background. The ground is lightly covered with snow.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the upper right corner of the photo shows the number, "36," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; East Counterweight Truss and End Posts of Lift Span in Place; Feb. 14, 1920; Photo W. B. James." The view looks northward on the east side of the Rouge River and shows the tower posts and truss structures that support the bridge counterweights. A construction crane can be seen in the left background. The 2-story brick building for the bridge operator is visible in the center background behind the bridge trusswork. The ground is lightly covered with snow.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the completed new railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "61," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; Bridge in Operation; May 29, 1920; Photo W. B. James, Br. Insp." The view looks northward (upstream) along the Rouge River and shows the new single leaf Strauss trunnion bascule bridge with its lift span in the closed position. The massive concrete counterweights can be seen at the far right side of the structure. Also, the new 2-story brick building for the bridge operator can be seen on the far right side of the photo.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the inside of a caisson that was used for the construction of a railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "27," and "M.C.R.R. River Rouge Bascule Bridge; Foundations; Caisson #3; July 18, 1919; W. B. James Photo. Br. Inspt." The view looks down on the top of the caisson and shows various pieces of equipment, piping, and scaffolding.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing structural details of a new railroad bridge over the Rouge River. The view shows a close-up view of the end post, bearing, and gusset plates of the new bridge.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the construction of a new railroad bridge over the Rouge River. The view looks northeastward and shows the lift span portion of the new single leaf Strauss trunnion bascule bridge in the raised position where it is presently under construction. Several factory buildings are visible in the background.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the completed new railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "54," and "M.C.R.R. River Rouge Bascule Bridge; Old Bridge Being Towed Out & New Bridge Ready to Close in Place; May 3, 1920; Photo W. B. James, Br. Insp." The view looks northward (upstream) along the Rouge River and shows the old railroad swing bridge loaded on barges on the left and ready to be towed away by the tugboat, Samuel J. Dark. The new single leaf Strauss trunnion bascule bridge (in raised position) can be seen on the right. Many workmen and spectators are seated or standing on the river bank.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the lower left corner of the photo shows the number, "32," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; Setting Tower Posts; Jan. 1, 1920; Photo W. B. James, Br. Inspt." The view looks northeastward and shows the ends of the existing railroad tracks at the banks of the Rouge River. Tower posts for the new bridge can be seen in the background on each side of the tracks and other structural steel beams can be seen on the ground beside the tracks. A track-mounted construction crane and several factory buildings are visible in the background of the photo. The ground is lightly covered with snow and chunks of ice can be seen on the river.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing a group of three workmen who are standing at the side of railroad track line which was located at the M.C.R.R. River Rouge Bascule Bridge project site. The men are looking down into the top of a caisson. A factory building is visible in the left background area of the photo. A construction crane, temporary buildings, piping, and construction materials can be seen on the right.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "31," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; Cutting Falsework to Set 1st Steel; Photo W. B. James, Br. Inspt.; Dec. 17, 1919." The view looks northward. Steel truss beams are lying on the ground in the foreground and the Rouge River is visible in the left background. Two groups of workmen are removing the existing railroad tracks and a track-mounted construction crane can be seen on the right side of the photo. The ground is lightly covered with snow.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "19," and "M.C.R.R. River Rouge Bascule Bridge; Foundations; Bucket Lock on Caisson #4; June 18, 1919. [W. B.] James Photo." The view is facing southwestward and shows a group of 11 workmen who have posed for the photo and are standing on top of caisson #4 or on the adjacent railroad tracks. Several factory buildings can be seen in the left background and a small portion of the Rouge River can be seen in the right background. The top of the old railroad bridge is visible near the center of the photo. Handwritten text on the verso shows "Supt. Hedrich (white hat)" and "Missouri Bridge & Iron Co., contractors; Mr. O'Conner, chief engineer."
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph (and 1 copy). Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "14," and additional text at the top center shows "M.C.R.R. River Rouge Bascule Bridge; Foundations; Caissons #3 & #4; June 4, 1919. Photo W. B. James, Br. Inspt." The view looks northeastward along the existing railroad tracks with caissons #3 and #4 shown (labeled) in the center foreground. A workman is standing to the left of caisson #4. A construction crane and temporary concrete mixing plant can be seen to the left of the railroad tracks. Also, temporary construction buildings, construction materials, and construction debris can be seen on both sides of the tracks. Several factory buildings are visible in the left background and a large railroad yard can be seen in the right background area.
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the construction of a new railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "48," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; The Old and the New Bridge; Apr. 14, 1920; Photo W. B. James, Br. Inspt." The view looks northwestward (upstream) along the Rouge River and shows the old railroad swing bridge on the left (in open position) as well as the new single leaf Strauss trunnion bascule bridge on the right. The lift span portion of the new bridge is raised. The wooden formwork for one of the concrete counterweights can be seen just above the ground surface. A small portion of the new 2-story brick building for the bridge operator can be seen on the far right side of the photo.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing a group of men who are standing beside railroad boxcar that is partly tipped over. Handwritten text on the lower edge of the photo shows "A split switch. Volunteer switchmen, May, 1920." Evidently, a switch malfunctioned which caused the wheel truck at the right end of the boxcar to come off the tracks while the wheel truck at the left end appears to still be on the tracks. The photo was probably taken at a Michigan Central railroad yard near Detroit.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the construction of a railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "35," and "M.C.R.R. River Rouge Bascule Bridge; Superstructure; Erecting East Counterweight Truss; Photo W. B. James; Jan. 31, 1920." The view looks northward on the east side of the Rouge River and shows the tower post structure which provides support for the bridge counterweights. A construction crane can be seen in the right background as well as the 2-story brick building for the bridge operator.
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing the temporary concrete mixing plant for the construction of a railroad bridge over the Rouge River. Printed text in the upper left corner of the photo shows the number, "12," and additional text in top center area shows "M.C.R.R. River Rouge Bascule Bridge; Foundations; June 4, 1919; Mixing Plant." The view shows the aggregate hopper being loaded by a construction crane and bucket that can be seen at the left side of the photo. Two workmen are standing near the concrete mixer on the right side of the plant. The concrete mixer is positioned in order to pour the finished mixture into a second construction crane bucket that will carry the concrete to its placement location. Railroad tracks, temporary construction buildings, and piles of construction materials can be seen in the center area of the photo. Factory buildings and houses can be seen in the right background. A temporary construction building near the center of the photo has two signs on the roof. The text is not quite legible, but the sign on the left shows "[?] Foundations [?] Missouri Bridge & Iron Co. [?]" and the sign on the right shows "[?] Superstructure [?] Wisconsin Bridge & Iron Co. [?]."
- Date Issued:
- 1919-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society
- Description:
- Photograph. Sepia-toned photo showing a railroad bridge under construction over the Rouge River. Printed text in the lower left corner of the photo shows the number, "43," and "M.C.R.R. River Rouge Bascule Bridge; Erecting Lift Span; Mar. 27, 1920. Photo W. B. James, Insp." The view looks southeastward from the bank of the Rouge River and shows the truss structure that supports the bridge counterweights and lift span. The lift span is located at the far right side of the structure and a construction crane is lifting one of the structural members into position. The 2-story brick building for the bridge operator can be seen at the far left side of the photo. Near the center of the photo, a sign on the top of the river bank shows "Cables, Do Not Drag Anchor."
- Date Issued:
- 1920-01-01T00:00:00Z
- Data Provider:
- Detroit Historical Society